Reducing the energy intensity of buildings through thermomodernisation of single-family buildings in the municipality of Malechowo (Q4427291): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Import item from Poland) |
(Changed an Item: Import item from Poland) |
||||||||||
Property / coordinate location | |||||||||||
54°22'48.32"N, 16°34'57.50"E
| |||||||||||
Property / coordinate location: 54°22'48.32"N, 16°34'57.50"E / rank | |||||||||||
Normal rank | |||||||||||
Property / coordinate location: 54°22'48.32"N, 16°34'57.50"E / qualifier | |||||||||||
Revision as of 16:12, 26 October 2022
Project Q4427291 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Reducing the energy intensity of buildings through thermomodernisation of single-family buildings in the municipality of Malechowo |
Project Q4427291 in Poland |
Statements
584,200.0 zloty
0 references
129,867.66 Euro
0 references
584,200.0 zloty
0 references
129,867.66 Euro
0 references
100.0 percent
0 references
10 February 2022
0 references
31 December 2022
0 references
GMINA MALECHOWO
0 references
Celem realizacji projektu jest zmniejszenie energochłonności budynków jednorodzinnych na terenie gminy Malechowo. Realizacja projektu przyczyni się do osiągnięcia jak największej efektywności energetycznej oraz poprawy jakości powietrza poprzez wymianę źródeł ciepła opartych o spalanie węgla, która wpłynie na spadek wskaźnika emisji CO2 oraz innych zanieczyszczeń powietrza. 1. Przedmiotem projektu będzie termomodernizacja 15 budynków jednorodzinnych (pełna lub częściowa) wraz z likwidacją źródeł ciepła opartych o spalanie węgla (piec lub kocioł węglowy)... i zastąpienie zlikwidowanego źródła nową jednostką wytwarzającą energię cieplną (w pierwszej kolejności na jednostkę wytwarzającą energię cieplną ze spalania gazu – dotyczy obszarów zgazyfikowanych, tam gdzie korzystanie z energii gazowej jest uzasadnione ekonomicznie). Zakres rzeczowy projektu obejmuje modernizację energetyczną budynków jednorodzinnych: 4 budynki poddane pełnej termomodernizacji i 11 budynków poddanych częściowej termomodernizacji wraz z wymianą wysokoemisyjnych źródeł ciepła oraz wykonanie analogicznej liczby audytów energetycznych. Projekt realizowany będzie na terenie Gminy Malechowo. Za wdrażanie projektu odpowiedzialny będzie Zespół Projektowy (ZP). Sposób oraz szczegółowy plan wdrażania projektu został opisany w Planie Realizacji Projektu. Najważniejszymi etapami realizacji projektu będą: przeprowadzenie kampanii informacyjno – promocyjnej, nabór wniosków od osób fizycznych, realizacja i bieżący monitoring projektu, kontrola oraz utrzymanie trwałości projektu. Projekt zakłada poprawę efektywności energetycznej każdego budynku objętego wsparciem o minimum 25% oraz uzyskania redukcji emisji CO2 o minimum 30% w każdym wspartym budynku (Polish)
0 references
The aim of the project is to reduce the energy intensity of single-family buildings in the municipality of Malechowo. The implementation of the project will contribute to achieving the highest possible energy efficiency and improvement of air quality through the exchange of heat sources based on coal combustion, which will reduce the CO2 emissions and other air pollutants. 1. The subject of the project will be the thermomodernisation of 15 single-family buildings (full or partial) together with the decommissioning of heat sources based on the combustion of coal (coal furnace or boiler)... and replacing the decommissioned source with a new thermal energy generating unit (primarily per unit generating thermal energy from the combustion of gas — it concerns gasified areas where the use of gas energy is economically justified). The material scope of the project includes energy modernisation of single-family buildings: 4 buildings subjected to full thermo-modernisation and 11 buildings subjected to partial thermo-modernisation together with the replacement of carbon-intensive heat sources and execution of an analogous number of energy audits. The project will be implemented in the municipality of Malechowo. The Project Team (ZP) will be responsible for the implementation of the project. The method and detailed project implementation plan is described in the Project Implementation Plan. The main stages of the project will be: conducting an information and promotion campaign, recruitment of applications from individuals, implementation and ongoing monitoring of the project, control and maintenance of the project’s sustainability. The project aims to improve the energy efficiency of each supported building by a minimum of 25 % and achieve a minimum reduction of CO2 emissions of at least 30 % in each supported building (English)
0 references
WOJ.: ZACHODNIOPOMORSKIE, POW.: sławieński
0 references
Identifiers
RPZP.02.15.00-32-A031/19
0 references