Adaptation of heating system in public buildings: 1. “Adaptation of the existing heating system in the building of the Primary School in Lesnica with the construction of a connection to the gas network”. 2. “Adaptation of the existing heating system in the building of the Ecological Education Centre — in Lesśnica with the construction of the connection to the gas network”. (Q4428965): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Changed label, description and/or aliases in en, and other parts: Adding translation) |
||
label / en | label / en | ||
Adaptation of heating system in public buildings: 1. “Adaptation of the existing heating system in the building of the Primary School in Lesnica with the construction of a connection to the gas network”. 2. “Adaptation of the existing heating system in the building of the Ecological Education Centre — in Lesśnica with the construction of the connection to the gas network”. | |||
Property / summary | |||
The project will be implemented by the Leśnica Municipality in which according to the “List of communes in which excessive concentration levels have been found for one or more air pollutants”, which constitutes Annex 9 to the Competition Rules, it is necessary to reduce the amount of PM10, PM2.5 and benzo(a)pyrene. The project plans to modernise four energy-efficient heat sources in the form of oil boilers by connecting two public buildings to the gas network. The possibility of replacing heat sources was not considered, as there is a possibility of their complete decommissioning. Accordingly, oil boilers will be disposed of in: 2 pcs. — in the building of the Public Primary School at ul. Zdzieszowicka 23 in Leśnica, 2 pcs. — in the building of the Ecological Education Centre at ul. On the water 15 in the Forestry. Therefore, the project plans 4 modernisations of heat sources, including 4 decommissioning units (all values relate to public buildings). These values are the outputs of the project, which confirm the indicators shown in Section IV of the grant application. Decommissioning means the connection of the buildings concerned to the gas network. The project area coincides with the area of revitalisation of the Leśnica Commune — according to the data contained in the Local Revitalisation Programme of the Leśnica Commune for the years 2016-2022. Material scope: liquidation of non-organic and energy-inefficient heat sources in the building of the Public Primary School at ul. Zdzieszowicka 23 in Leśnica and the building of the Centre for Environmental Education at ul. On Water 15 in Leśnica through their connection to the gas network, investor supervision, promotion of the project. SWI and audits were prepared outside the project from own resources. Detailed description of the tasks: D.3 SWI. By reducing emissions of CO2 and PM10 to the atmosphere, the project contributes to air protection in the Leśnica Commune, and thus in the Opolskie Voivodeship. (English) | |||
Property / summary: The project will be implemented by the Leśnica Municipality in which according to the “List of communes in which excessive concentration levels have been found for one or more air pollutants”, which constitutes Annex 9 to the Competition Rules, it is necessary to reduce the amount of PM10, PM2.5 and benzo(a)pyrene. The project plans to modernise four energy-efficient heat sources in the form of oil boilers by connecting two public buildings to the gas network. The possibility of replacing heat sources was not considered, as there is a possibility of their complete decommissioning. Accordingly, oil boilers will be disposed of in: 2 pcs. — in the building of the Public Primary School at ul. Zdzieszowicka 23 in Leśnica, 2 pcs. — in the building of the Ecological Education Centre at ul. On the water 15 in the Forestry. Therefore, the project plans 4 modernisations of heat sources, including 4 decommissioning units (all values relate to public buildings). These values are the outputs of the project, which confirm the indicators shown in Section IV of the grant application. Decommissioning means the connection of the buildings concerned to the gas network. The project area coincides with the area of revitalisation of the Leśnica Commune — according to the data contained in the Local Revitalisation Programme of the Leśnica Commune for the years 2016-2022. Material scope: liquidation of non-organic and energy-inefficient heat sources in the building of the Public Primary School at ul. Zdzieszowicka 23 in Leśnica and the building of the Centre for Environmental Education at ul. On Water 15 in Leśnica through their connection to the gas network, investor supervision, promotion of the project. SWI and audits were prepared outside the project from own resources. Detailed description of the tasks: D.3 SWI. By reducing emissions of CO2 and PM10 to the atmosphere, the project contributes to air protection in the Leśnica Commune, and thus in the Opolskie Voivodeship. (English) / rank | |||
Normal rank |
Revision as of 20:38, 23 October 2022
Project Q4428965 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Adaptation of heating system in public buildings: 1. “Adaptation of the existing heating system in the building of the Primary School in Lesnica with the construction of a connection to the gas network”. 2. “Adaptation of the existing heating system in the building of the Ecological Education Centre — in Lesśnica with the construction of the connection to the gas network”. |
Project Q4428965 in Poland |
Statements
476,604.37 zloty
0 references
105,949.15 Euro
0 references
761,560.4 zloty
0 references
169,294.88 Euro
0 references
62.58 percent
0 references
4 May 2021
0 references
30 November 2021
0 references
GMINA LEŚNICA
0 references
Projekt realizowany będzie przez Gminę Leśnica na której obszarze zgodnie z „Wykazem gmin, w których stwierdzono ponadnormatywne poziomy stężeń dla jednego lub więcej niż jednego zanieczyszczenia powietrza”, stanowiącym załącznik nr 9 do Regulaminu konkursu konieczna jest redukcja ilości PM10, PM2,5 oraz benzo(a)pirenu. W ramach projektu planuje się modernizację czterech nieefektywnych energetycznie źródeł ciepła w postaci kotłów olejowych poprzez przyłączenie dwóch budynków użyteczności publicznej do sieci gazowej. Nie rozważono możliwości wymiany źródeł ciepła, jako, iż istnieje możliwość ich całkowitej likwidacji. Odpowiednio kotły olejowe zlikwidowane zostaną w: 2 szt. – w budynku Publicznej Szkoły Podstawowej przy ul. Zdzieszowickiej 23 w Leśnicy, 2 szt. – w budynku Centrum Edukacji Ekologicznej przy ul. Nad Wodą 15 w Leśnicy. W związku z tym w ramach przedsięwzięcia planuje się 4 szt. modernizacji źródeł ciepła, w tym 4 szt. likwidacji (wszystkie wartości dotyczą budynków użyteczności publicznej). Wartości te stanowią produkty projektu, które potwierdzają wskaźniki wykazane w sekcji IV wniosku o dofinansowanie. Poprzez likwidację należy rozumieć przyłączenie przedmiotowych budynków do sieci gazowej. Obszar projektu pokrywa się z obszarem rewitalizacji Gminy Leśnica – zgodnie z danymi zawartymi w Lokalnym Programie Rewitalizacji Gminy Leśnica na lata 2016 -2022. Zakres rzeczowy: likwidacja nieekologicznych i nieefektywnych energetycznie źródeł ciepła w budynku Publicznej Szkoły Podstawowej przy ul. Zdzieszowickiej 23 w Leśnicy oraz budynku Centrum Edukacji Ekologicznej przy ul. Nad Wodą 15 w Leśnicy poprzez ich przyłączenie do sieci gazowej, nadzór inwestorski, promocja projektu. SWI i audyty sporządzone zostały poza projektem ze środków własnych. Szczegółowy opis zadań: D.3 SWI. Przedsięwzięcie poprzez redukcję emisji CO2 oraz pyłu PM10 do atmosfery przyczynia się do ochrony powietrza na terenie Gminy Leśnica, a tym samym na terenie województwa opolskiego. (Polish)
0 references
The project will be implemented by the Leśnica Municipality in which according to the “List of communes in which excessive concentration levels have been found for one or more air pollutants”, which constitutes Annex 9 to the Competition Rules, it is necessary to reduce the amount of PM10, PM2.5 and benzo(a)pyrene. The project plans to modernise four energy-efficient heat sources in the form of oil boilers by connecting two public buildings to the gas network. The possibility of replacing heat sources was not considered, as there is a possibility of their complete decommissioning. Accordingly, oil boilers will be disposed of in: 2 pcs. — in the building of the Public Primary School at ul. Zdzieszowicka 23 in Leśnica, 2 pcs. — in the building of the Ecological Education Centre at ul. On the water 15 in the Forestry. Therefore, the project plans 4 modernisations of heat sources, including 4 decommissioning units (all values relate to public buildings). These values are the outputs of the project, which confirm the indicators shown in Section IV of the grant application. Decommissioning means the connection of the buildings concerned to the gas network. The project area coincides with the area of revitalisation of the Leśnica Commune — according to the data contained in the Local Revitalisation Programme of the Leśnica Commune for the years 2016-2022. Material scope: liquidation of non-organic and energy-inefficient heat sources in the building of the Public Primary School at ul. Zdzieszowicka 23 in Leśnica and the building of the Centre for Environmental Education at ul. On Water 15 in Leśnica through their connection to the gas network, investor supervision, promotion of the project. SWI and audits were prepared outside the project from own resources. Detailed description of the tasks: D.3 SWI. By reducing emissions of CO2 and PM10 to the atmosphere, the project contributes to air protection in the Leśnica Commune, and thus in the Opolskie Voivodeship. (English)
0 references
WOJ.: OPOLSKIE, POW.: strzelecki
0 references
Identifiers
RPOP.05.05.00-16-0007/20
0 references