“Construction of a photovoltaic installation for the Waterworks and Sewerage Plant Spółka z o.o. in Drawsko Pomorskie” (Q4427185): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en, and other parts: Adding translation)
(‎Changed an Item: Import item from Poland)
Property / intervention field
 
Property / intervention field: Renewable energy: solar / rank
 
Normal rank

Revision as of 15:39, 24 October 2022

Project Q4427185 in Poland
Language Label Description Also known as
English
“Construction of a photovoltaic installation for the Waterworks and Sewerage Plant Spółka z o.o. in Drawsko Pomorskie”
Project Q4427185 in Poland

    Statements

    0 references
    208,363.17 zloty
    0 references
    46,319.13 Euro
    0 references
    463,132.17 zloty
    0 references
    102,954.28 Euro
    0 references
    44.99 percent
    0 references
    18 February 2020
    0 references
    31 August 2021
    0 references
    ZAKŁAD WODOCIĄGÓW I KANALIZACJI" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    Realizacja projektu polegać będzie na montażu naziemnych instalacji fotowoltaicznych, służących do produkcji energii elektrycznej z promieniowania słonecznego dla urządzeń wodno-kanalizacyjnych obsługiwanych przez Zakład Wodociągów i Kanalizacji Sp. z o.o. w Drawsku Pomorskim. W ramach projektu planuje się wybudowanie instalacji na terenie: oczyszczalni ścieków w Drawsku Pomorskim, oczyszczalni ścieków w Ostrowicach oraz stacji wodociągowej w Drawsku Pomorskim. Realizacja projektu ma na celu optymalizację zużycia energii niezbędnej dla funkcjonowania obiektów ZWiK. Energia wytworzona przez panele fotowoltaiczne będzie pożytkowana na własne potrzeby, co obniży koszty zakupu energii i usług dystrybucyjnych od operatora zewnętrznego. Wykorzystanie odnawialnych źródeł energii wpłynie na racjonalizację zużycia energii, zwiększenie jej efektywności oraz polepszenie standardów świadczonych usług. Głównymi etapami projektu są: prace przygotowawcze: - opracowanie koncepcji przedsięwzięcia -przygotowanie wniosku aplikacyjnego wraz z niezbędnymi załącznikami. Realizacja projektu: -przygotowanie oraz przeprowadzenie procedury przetargowej na wykonawcę robót budowlanych. -Rzeczowa realizacja projektu: - zakup i montaż instalacji fotowoltaicznej, - uruchomienie instalacji. Nadzór nad realizacją projektu. Przez cały okres realizacji inwestycji będzie prowadzona dokumentacja projektowa, rozliczenia finansowe, wymagana sprawozdawczość i promocja projektu. W okresie robót budowlanych nadzór nad wykonaniem prac będzie sprawował inspektor nadzoru. Struktura zarządzania projektem została opisana w pkt. 3.2.2. SW. W skład zespołu zarządzającego projektem wejdą: Kierownik projektu, Specjalista ds. merytorycznych, Specjalista ds. finansowo – księgowych. Inwestycja ma charakter stacjonarny. (Polish)
    0 references
    The implementation of the project will consist of the installation of ground photovoltaic installations used for the production of electricity from solar radiation for water and sewerage devices operated by Zakład Wodociągów i K seweracja Sp. z o.o. in Drawsko Pomorski. As part of the project, it is planned to build an installation on the site: sewage treatment plant in Drawsko Pomorskie, sewage treatment plant in Ostrowice and water supply station in Drawsko Pomorski. The aim of the project is to optimise the energy consumption necessary for the operation of ZWiK facilities. The energy generated by photovoltaic panels will be used for their own needs, which will reduce the costs of purchasing energy and distribution services from an external operator. The use of renewable energy sources will help to rationalise energy consumption, increase its efficiency and improve the standards of services provided. The main stages of the project are: preparatory work: — development of the concept of the project — preparation of the application application together with the necessary annexes. Implementation of the project: — preparing and conducting a tender procedure for the contractor of the construction works. Actual implementation of the project: — purchase and installation of a photovoltaic installation, — commissioning of the installation. Supervision over the implementation of the project. Project documentation, financial settlements, required reporting and promotion of the project will be maintained throughout the investment period. During the construction works, supervision over the execution of the works will be carried out by a supervisory inspector. The project management structure is described in point. 3.2.2. IT’S A SW. The project management team will include: Project Manager, Technical Specialist, Financial and Accounting Specialist. The investment is stationary. (English)
    0 references
    WOJ.: ZACHODNIOPOMORSKIE, POW.: drawski
    0 references

    Identifiers

    RPZP.02.10.00-32-C124/20
    0 references