Improving air quality by increasing the share of RES in the production of energy in the Jedwabne Commune (Q4416042): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en, and other parts)
(‎Changed an Item: Import item from Poland)
Property / intervention field
 
Property / intervention field: Renewable energy: solar / rank
 
Normal rank

Revision as of 15:13, 24 October 2022

Project Q4416042 in Poland
Language Label Description Also known as
English
Improving air quality by increasing the share of RES in the production of energy in the Jedwabne Commune
Project Q4416042 in Poland

    Statements

    0 references
    1,395,341.64 zloty
    0 references
    310,184.45 Euro
    0 references
    1,993,345.2 zloty
    0 references
    443,120.64 Euro
    0 references
    70.0 percent
    0 references
    17 January 2022
    0 references
    14 December 2022
    0 references
    GMINA JEDWABNE
    0 references
    Wnioskodawcą projektu grantowego jest Gmina Jedwabne, która następnie stanie się Grantodawcą dla mieszkańców chcących zamontować instalację OZE produkujące energię na potrzeby ich gospodarstw domowych. Celem głównym projektu jest: Ograniczenie emisji gazów cieplarnianych poprzez budowę 77 mikroinstalacji wykorzystujących odnawialne źródła energii w gospodarstwach indywidualnych na terenie gminy Jedwabne od 2023 r. W ramach projektu powstanie 46 instalacji paneli fotowoltaicznych (w tym 27 na terenie wiejskim) oraz 31 instalacji kolektorów słonecznych (w tym 23 na terenie wiejskim). Gmina nie ubiega się o punkty w ramach kryterium instalacji hybrydowych. Wykorzystanie energii ze źródeł odnawialnych przyczynia się do ograniczenia emisji gazów cieplarnianych oraz pyłów lotnych powstających podczas spalania konwencjonalnych surowców energetycznych (tj. paliwa kopalne). Każdy z mieszkańców gminy Jedwabne biorący udział w projekcie przyczyni się do ochrony środowiska naturalnego poprzez zainstalowanie w swoim domu paneli fotowoltaicznych i/lub kolektorów słonecznych. Cel ten będzie realizowany poprzez następujące cele bezpośrednie: 1. Zwiększenie wykorzystania odnawialnych źródeł energii w zakresie wytwarzania energii elektrycznej i cieplnej na potrzeby budynków mieszkalnych zlokalizowanych na obszarze gminy Jedwabne. 2. Spadek emisji szkodliwych substancji do atmosfery przez budynki mieszkalne zlokalizowane w gminie. 3. Obniżenie kosztów utrzymania gospodarstw domowych z obszaru gminy Jedwabne. Projekt będzie realizowany w 2022 (Polish)
    0 references
    The applicant for the grant project is the Municipality of Jedwabne, which will then become a grantor for residents wishing to install a RES installation producing energy for the needs of their households. The main objective of the project is to: Reducing greenhouse gas emissions through the construction of 77 micro-installations using renewable energy sources on individual farms in the municipality of Jedwabne since 2023. As part of the project, 46 installations of photovoltaic panels (including 27 in rural areas) and 31 solar collectors installations (including 23 in rural areas) will be built. The municipality does not apply for points under the hybrid installation criterion. The use of renewable energy contributes to the reduction of greenhouse gas emissions and volatile particulate matter resulting from the combustion of conventional energy resources (i.e. fossil fuels). Each of the inhabitants of the Jedwabne municipality participating in the project will contribute to the protection of the natural environment by installing photovoltaic panels and/or solar collectors in their home. This objective will be pursued through the following direct objectives: 1. Increasing the use of renewable energy sources in the field of electricity and heat generation for residential buildings located in the municipality of Jedwabne. 2. Reduction of emissions of harmful substances into the atmosphere by residential buildings located in the municipality. 3. Reduction of household maintenance costs in the municipality of Jedwabne. The project will be implemented in 2022 (English)
    21 October 2022
    0 references
    WOJ.: PODLASKIE, POW.: łomżyński
    0 references

    Identifiers

    RPPD.11.01.00-20-0002/21
    0 references