Construction of a gas boiler room in a multifunctional building in Nowa Sucha (Q4424583): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en, and other parts: Adding translation)
(‎Changed an Item: Import item from Poland)
Property / intervention field
 
Property / intervention field: Energy efficiency renovation of public infrastructure, demonstration projects and supporting measures / rank
 
Normal rank

Revision as of 15:07, 24 October 2022

Project Q4424583 in Poland
Language Label Description Also known as
English
Construction of a gas boiler room in a multifunctional building in Nowa Sucha
Project Q4424583 in Poland

    Statements

    0 references
    487,142.56 zloty
    0 references
    108,291.79 Euro
    0 references
    608,928.2 zloty
    0 references
    135,364.74 Euro
    0 references
    80.0 percent
    0 references
    30 March 2020
    0 references
    30 June 2022
    0 references
    GMINA NOWA SUCHA
    0 references
    Celem głównym projektu jest zwiększenie efektywności energetycznej w budynkach użyteczności publicznej w gminie Nowa Sucha. Projekt polega na termomodernizacji budynku poprzez ocieplenie ścian, stropodachu oraz na budowie instalacji wewnętrznej i zewnętrznej gazu ziemnego, budowie kotłowni gazowej wraz z przebudową istniejącego pomieszczenia kotłowni na paliwo stałe, a także wymianie instalacji centralnego ogrzewania i wodno-kanalizacyjnej. Grupę docelową projektu stanowią wszyscy mieszkańcy Gminy Nowa Sucha. W ramach projektu zrealizowana zostanie budowa kotłowni gazowej wraz z przebudową instalacji c.o., wodociągowej i kanalizacyjnej w budynku położonym w Nowej Suchej 50A, z której również ogrzewany jest budynek Gminnej Biblioteki Publicznej w Nowej Suchej. Ponadto przeprowadzona zostanie modernizacja budynku wielofunkcyjnego, w którym znajdują się lokale mieszkalne (21,49% powierzchni budynku wielofunkcyjnego, 15,78% powierzchni wszystkich budynków objętych projektem). Poprawa efektywności energetycznej określonej dla energii końcowej, dla projektu wynosi 47,06%. Szacowany roczny spadek emisji gazów cieplarnianych (CI 34) wyniesie 32,76 ton równoważnika CO2. Redukcja emisji CO2, która będzie miała miejsce w wyniku realizacji projektu wyniesie 53,74%. Projekt wpływał będzie zatem na realizację celu szczegółowego dla działania 4.2 Efektywność energetyczna. Zapisy Szczegółowego Opisu Osi Priorytetowych Regionalnego Programu Operacyjnego Województwa Mazowieckiego na lata 2014-2020 wskazują bowiem, iż głównym celem interwencji realizowanych w ramach ww. działania jest zwiększenie efektywności energetycznej w budynkach użyteczności publicznej. Projekt będzie realizowany zgodnie z zasadą uniwersalnego projektowania. (Polish)
    0 references
    The main objective of the project is to increase energy efficiency in public buildings in the municipality of Nowa Sucha. The project consists of thermal modernisation of the building by warming the walls, rooftops and on the construction of an internal and external natural gas installation, the construction of a gas boiler room together with the reconstruction of the existing boiler room with solid fuel, as well as the replacement of the central heating and water and sewage system. The target group of the project is all residents of the Municipality of Nowa Sucha. As part of the project, the construction of a gas boiler room will be carried out together with the reconstruction of the c.o., water supply and sewage system in the building located in Nowa Sucha 50A, from which the building of the Municipal Public Library in Nowa Sucha is also heated. In addition, the multifunctional building will be modernised, in which dwellings are located (21.49 % of the area of the multifunctional building, 15.78 % of the area of all buildings covered by the project). The improvement in energy efficiency determined for final energy, for the project, is 47.06 %. The estimated annual decrease in greenhouse gas emissions (CI 34) will be 32.76 tonnes of CO2 equivalent. The reduction in CO2 emissions that will result from the project will amount to 53.74 %. The project will therefore contribute to the specific objective for measure 4.2 Energy efficiency. The provisions of the Detailed Description of the Priority Axes of the Regional Operational Programme of the Mazowieckie Voivodeship for 2014-2020 indicate that the main objective of the interventions implemented under the above-mentioned measure is to increase energy efficiency in public buildings. The project will be implemented in accordance with the principle of universal design. (English)
    0 references
    WOJ.: MAZOWIECKIE, POW.: sochaczewski
    0 references

    Identifiers

    RPMA.12.01.00-14-I315/20
    0 references