PAWEŁ GUŁAS VENE POINT — INSTALLATIONS FOR THE PRODUCTION OF ENERGY FROM RES UP TO 0.5 MW (Q4419647): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en, and other parts) |
(Changed an Item: Import item from Poland) |
||
Property / intervention field | |||
Property / intervention field: Renewable energy: solar / rank | |||
Normal rank |
Revision as of 14:19, 24 October 2022
Project Q4419647 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | PAWEŁ GUŁAS VENE POINT — INSTALLATIONS FOR THE PRODUCTION OF ENERGY FROM RES UP TO 0.5 MW |
Project Q4419647 in Poland |
Statements
216,796.37 zloty
0 references
48,193.83 Euro
0 references
333,532.88 zloty
0 references
74,144.36 Euro
0 references
65.0 percent
0 references
22 March 2022
0 references
31 December 2022
0 references
PAWEŁ GUŁAŚ VENE POINT
0 references
Głównym celem projektu jest produkcja energii elektrycznej pochodzącej z promieniowania słonecznego przez przedsiębiorstwo Vene Point na potrzeby własne. Celami pośrednimi są: - redukcja kosztów energii elektrycznej - redukcja zużycia energii elektrycznej z nieodnawialnych źródeł energii - redukcja emisji gazów cieplarnianych - wzrost świadomości ekologicznej pracowników, klientów firmy i mieszkańców, stymulacja rozwoju nowoczesnych technologii pozyskiwania energii ze źródeł odnawialnych. Przedmiotem projektu jest budowa 3 instalacji fotowoltaicznych, na dachach budynków w Lublinie i Krasnymstawie o łącznej mocy 111,74 kWp, która produkować będzie "czystą" energię elektryczną na potrzeby własne, a nadwyżki energii odprowadzane będą do istniejącej sieci energetycznej. Instalacja składać się będzie z paneli fotowoltaicznych, inwerterów, dedykowanych konstrukcji montażowych, systemu okablowań i zabezpieczeń przepięciowych oraz systemów zarządzania energią. Projekt zrealizowany zostanie w następujących lokalizacjach: - INSTALACJA 1: Lublin, ul. Tokarska 3, dz. 1/38 (Obręb: 13, ark. 9), - INSTALACJA 2: Lublin, ul. Tokarska 3 dz. 1/36 i 1/37 (Obręb: 13, ark. 9), - INSTALACJA 3: Krasnystaw, ul. Lwowska 146a, dz. 80 (Obręb: Zastawie Przedmieście). W ramach zadania nastąpi zakup środków trwałych instalacji fotowoltaicznych. Koszty wykazane w kosztorysie, ustalone przez kosztorysanta na podstawie cen rynkowych. Wnioskodawca dokonał porównania cen materiałów i usług z cenami rynkowymi. Koszty są zasadne, ponieważ mają bezpośredni wpływ na osiągnięcie wskaźników przedstawionych we wniosku Projekt realizowany będzie w okresie 22.03.2022-31-12-2022. (Polish)
0 references
The main objective of the project is to produce electricity from solar radiation by Vene Point for its own use. The intermediate objectives are: — reduction of electricity costs — reduction of electricity consumption from non-renewable energy sources — reduction of greenhouse gas emissions — increase of environmental awareness of employees, customers and residents, stimulate the development of modern technologies for obtaining energy from renewable sources. The subject of the project is the construction of 3 photovoltaic installations, on the roofs of buildings in Lublin and Krasnystaw with a total capacity of 111.74 kWp, which will produce “clean” electricity for own needs, and surplus energy will be discharged to the existing power grid. The installation will consist of photovoltaic panels, inverters, dedicated assembly structures, wiring and overvoltage protection system and energy management systems. The project will be implemented in the following locations: — INSTALLATION 1: Lublin, ul. Tokarska 3, dz. 1/38 (Field: 13, ark. 9), — INSTALLATION 2: Lublin, ul. Tokarska 3 dz. 1/36 and 1/37 (Area: 13, ark. 9), — INSTALLATION 3: Krasnystaw, ul. Lwowska 146a, lt. 80 (area: Of the suburbs). As part of the task, the purchase of fixed assets of photovoltaic installations will take place. Costs shown in the cost estimate, determined by the cost estimate on the basis of market prices. The applicant compared the prices of materials and services with market prices. The costs are justified because they have a direct impact on the achievement of the indicators presented in the proposal. (English)
21 October 2022
0 references
WOJ.: LUBELSKIE, POW.: Lublin
0 references
WOJ.: LUBELSKIE, POW.: krasnostawski
0 references
Identifiers
RPLU.15.01.00-06-0210/22
0 references