Giebułtów, ul. Hermana — integration of bicycle transport with public transport
Property / summary
 
As part of the study, the construction of a pedestrian track including: expansion of Herman Street, including: construction of a walking track with a width of 3.0 m on the right east side of ul. Herman on the section from the beginning of the development to ul. Judyty is adjacent to the roadway except for the section just before the exit at ul. Judyty, and further from ul. Judyty to the V. Vitos Post-Basic School Complex in Giebułtów School Estate 8 is removed from the roadway by 4.0 m; reconstruction of existing exits from ul. Herman, i.e.: exit to the property on junction no. 1793 in approx. 0227 p. P along with the pedestrian access, exit to the inner road ul. Judyty in km approx. 0728 p. P; reconstruction of exits from ul. Herman designed as part of separate studies, i.e. the exit to junction no. 5671 in approx. 0588 p. P, exit to junction no. 5661 in approx. 0615 p. P; reconstruction of the existing access road from the Upper Primary School Complex to ul. It’s St. I go to a walking track and drive on the length of approx. 310 m along with the construction of a triangular drain and a triangular tray on the right east side of the access road, as well as the construction of a cyclist service area with a bicycle shed for 8 stations; execution of the target traffic organisation horizontal and vertical markings, including the installation of railings along the pedestrian track on the right side of ul. Herman, protecting pedestrians and cyclists from falling from the slope; reconstruction of the drainage system; construction of a rainwater drain with rain drains and drainage channels; extension of electricity and lighting networks Tauron Distribution, gas network and protection with curtain pipes construction of natural slopes; construction of a fence. (English)
Property / summary: As part of the study, the construction of a pedestrian track including: expansion of Herman Street, including: construction of a walking track with a width of 3.0 m on the right east side of ul. Herman on the section from the beginning of the development to ul. Judyty is adjacent to the roadway except for the section just before the exit at ul. Judyty, and further from ul. Judyty to the V. Vitos Post-Basic School Complex in Giebułtów School Estate 8 is removed from the roadway by 4.0 m; reconstruction of existing exits from ul. Herman, i.e.: exit to the property on junction no. 1793 in approx. 0227 p. P along with the pedestrian access, exit to the inner road ul. Judyty in km approx. 0728 p. P; reconstruction of exits from ul. Herman designed as part of separate studies, i.e. the exit to junction no. 5671 in approx. 0588 p. P, exit to junction no. 5661 in approx. 0615 p. P; reconstruction of the existing access road from the Upper Primary School Complex to ul. It’s St. I go to a walking track and drive on the length of approx. 310 m along with the construction of a triangular drain and a triangular tray on the right east side of the access road, as well as the construction of a cyclist service area with a bicycle shed for 8 stations; execution of the target traffic organisation horizontal and vertical markings, including the installation of railings along the pedestrian track on the right side of ul. Herman, protecting pedestrians and cyclists from falling from the slope; reconstruction of the drainage system; construction of a rainwater drain with rain drains and drainage channels; extension of electricity and lighting networks Tauron Distribution, gas network and protection with curtain pipes construction of natural slopes; construction of a fence. (English) / rank
 
Normal rank
Property / summary: As part of the study, the construction of a pedestrian track including: expansion of Herman Street, including: construction of a walking track with a width of 3.0 m on the right east side of ul. Herman on the section from the beginning of the development to ul. Judyty is adjacent to the roadway except for the section just before the exit at ul. Judyty, and further from ul. Judyty to the V. Vitos Post-Basic School Complex in Giebułtów School Estate 8 is removed from the roadway by 4.0 m; reconstruction of existing exits from ul. Herman, i.e.: exit to the property on junction no. 1793 in approx. 0227 p. P along with the pedestrian access, exit to the inner road ul. Judyty in km approx. 0728 p. P; reconstruction of exits from ul. Herman designed as part of separate studies, i.e. the exit to junction no. 5671 in approx. 0588 p. P, exit to junction no. 5661 in approx. 0615 p. P; reconstruction of the existing access road from the Upper Primary School Complex to ul. It’s St. I go to a walking track and drive on the length of approx. 310 m along with the construction of a triangular drain and a triangular tray on the right east side of the access road, as well as the construction of a cyclist service area with a bicycle shed for 8 stations; execution of the target traffic organisation horizontal and vertical markings, including the installation of railings along the pedestrian track on the right side of ul. Herman, protecting pedestrians and cyclists from falling from the slope; reconstruction of the drainage system; construction of a rainwater drain with rain drains and drainage channels; extension of electricity and lighting networks Tauron Distribution, gas network and protection with curtain pipes construction of natural slopes; construction of a fence. (English) / qualifier
 
point in time: 21 October 2022
Timestamp+2022-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:38, 21 October 2022

Project Q4421664 in Poland
Language Label Description Also known as
English
Giebułtów, ul. Hermana — integration of bicycle transport with public transport
Project Q4421664 in Poland

    Statements

    0 references
    1,205,549.17 zloty
    0 references
    267,993.58 Euro
    0 references
    1,530,273.13 zloty
    0 references
    340,179.72 Euro
    0 references
    78.78 percent
    0 references
    30 September 2020
    0 references
    31 December 2022
    0 references
    GMINA WIELKA WIEŚ
    0 references
    W ramach opracowania przewidziano do wykonania budowę ciągu pieszorowerowego obejmującą: rozbudowę ulicy Hermana, w tym: budowę ciągu pieszorowerowego o szerokości 3.0 m po prawej wschodniej stronie ul. Hermana na odcinku od początku opracowania do ul. Judyty ciąg ten przylega do jezdni ulicy za wyjątkiem odcinka tuż przed zjazdem na ul. Judyty, a na dalszym odcinku od ul. Judyty do Zespołu Szkół Ponadpodstawowych im. W. Witosa w Giebułtowie Osiedle Szkolne 8 jest odsunięty od jezdni o 4.0 m; przebudowę istniejących zjazdów z ul. Hermana, tj.: zjazd do posesji na dz. nr 1793 w km ok. 0227 str. P wraz z dojściem pieszym, zjazd na drogę wewnętrzną ul. Judyty w km ok. 0728 str. P; przebudowę zjazdów z ul. Hermana projektowanych w ramach odrębnych opracowań, tj. zjazd na dz. nr 5671 w km ok. 0588 str. P, zjazd na dz. nr 5661 w km ok. 0615 str. P; przebudowę istniejącej drogi dojazdowej od Zespołu Szkół Ponadpodstawowych do ul. Św. Idziego na ciąg pieszorowerowojezdny na długości ok. 310 m wraz z budową ścieku przykrawężnikowego oraz korytka trójkątnego po prawej wschodniej stronie istn. drogi dojazdowej, a także budową miejsca obsługi rowerzystów z wiatą rowerową na 8 stanowisk; wykonanie docelowej organizacji ruchu oznakowanie poziome i pionowe, w tym także montaż balustrad wzdłuż ciągu pieszorowerowego po stronie prawej ul. Hermana, zabezpieczających pieszych i rowerzystów przed upadkiem ze skarpy; przebudowę systemu odwodnienia; budowę kanalizacji deszczowej wraz z wpustami deszczowymi i przykanalikami odwadniającymi; rozbudowę sieci elektroenergetyczne i oświetleniowe Tauron Dystrybucja, sieć gazowa oraz zabezpieczenie rurami osłonowymi budowę skarp terenowych ziemnych; budowę ogrodzenia. (Polish)
    0 references
    As part of the study, the construction of a pedestrian track including: expansion of Herman Street, including: construction of a walking track with a width of 3.0 m on the right east side of ul. Herman on the section from the beginning of the development to ul. Judyty is adjacent to the roadway except for the section just before the exit at ul. Judyty, and further from ul. Judyty to the V. Vitos Post-Basic School Complex in Giebułtów School Estate 8 is removed from the roadway by 4.0 m; reconstruction of existing exits from ul. Herman, i.e.: exit to the property on junction no. 1793 in approx. 0227 p. P along with the pedestrian access, exit to the inner road ul. Judyty in km approx. 0728 p. P; reconstruction of exits from ul. Herman designed as part of separate studies, i.e. the exit to junction no. 5671 in approx. 0588 p. P, exit to junction no. 5661 in approx. 0615 p. P; reconstruction of the existing access road from the Upper Primary School Complex to ul. It’s St. I go to a walking track and drive on the length of approx. 310 m along with the construction of a triangular drain and a triangular tray on the right east side of the access road, as well as the construction of a cyclist service area with a bicycle shed for 8 stations; execution of the target traffic organisation horizontal and vertical markings, including the installation of railings along the pedestrian track on the right side of ul. Herman, protecting pedestrians and cyclists from falling from the slope; reconstruction of the drainage system; construction of a rainwater drain with rain drains and drainage channels; extension of electricity and lighting networks Tauron Distribution, gas network and protection with curtain pipes construction of natural slopes; construction of a fence. (English)
    21 October 2022
    0 references
    WOJ.: MAŁOPOLSKIE, POW.: krakowski
    0 references

    Identifiers

    RPMP.04.05.01-12-0053/20
    0 references