Use of renewable energy for heating buildings from WZURIB | |||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to change the heating and heating system in the building of WZURIB sp.z.o.o. from a high-emission boiler burning hard coal to a system based on RES. As part of the project, it is planned to install: — air heat pumps — water with a total power of 60 kW for heating buildings, — photovoltaic installation with a power of approx. 15 kW on the roof of the building to power heat pumps. — hot water buffer constituting a thermal energy storage. The assumption of the project, apart from reducing exhaust emissions, is the self-sufficiency of the heating system. This is to be achieved thanks to the photovoltaic installation, the power of which was selected for the demand of heat pumps for electricity. Thanks to the use of a heat buffer — an energy storage, it will be possible to collect heat energy at moments when the instantaneous demand will exceed the efficiency of the system. (English) | |||||||||||||||
Property / summary: The aim of the project is to change the heating and heating system in the building of WZURIB sp.z.o.o. from a high-emission boiler burning hard coal to a system based on RES. As part of the project, it is planned to install: — air heat pumps — water with a total power of 60 kW for heating buildings, — photovoltaic installation with a power of approx. 15 kW on the roof of the building to power heat pumps. — hot water buffer constituting a thermal energy storage. The assumption of the project, apart from reducing exhaust emissions, is the self-sufficiency of the heating system. This is to be achieved thanks to the photovoltaic installation, the power of which was selected for the demand of heat pumps for electricity. Thanks to the use of a heat buffer — an energy storage, it will be possible to collect heat energy at moments when the instantaneous demand will exceed the efficiency of the system. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to change the heating and heating system in the building of WZURIB sp.z.o.o. from a high-emission boiler burning hard coal to a system based on RES. As part of the project, it is planned to install: — air heat pumps — water with a total power of 60 kW for heating buildings, — photovoltaic installation with a power of approx. 15 kW on the roof of the building to power heat pumps. — hot water buffer constituting a thermal energy storage. The assumption of the project, apart from reducing exhaust emissions, is the self-sufficiency of the heating system. This is to be achieved thanks to the photovoltaic installation, the power of which was selected for the demand of heat pumps for electricity. Thanks to the use of a heat buffer — an energy storage, it will be possible to collect heat energy at moments when the instantaneous demand will exceed the efficiency of the system. (English) / qualifier | |||||||||||||||
point in time: 21 October 2022
|
Revision as of 13:29, 21 October 2022
Project Q4419680 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Use of renewable energy for heating buildings from WZURIB |
Project Q4419680 in Poland |
Statements
126,704.53 zloty
0 references
28,166.42 Euro
0 references
194,930.07 zloty
0 references
43,332.95 Euro
0 references
65.0 percent
0 references
1 April 2023
0 references
30 December 2023
0 references
WŁODAWSKI ZAKŁAD USŁUG REMONTOWYCH I BUDOWLANYCH SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Celem projektu jest zmiana system ogrzewania i c.w.u. w budynku firmy WZURIB sp.z.o.o. z wysokoemisyjnego kotła spalającego węgiel kamienny na system oparty na OZE. W ramach projektu planowane jest montaż : - pomp ciepła powietrze - woda o łącznej mocy 60 kW do ogrzewania budynków, - instalacji fotowoltaicznej o mocy ok. 15 kW na dachu budynku w celu zasilenia pomp ciepła. - buforu z gorącą wodą stanowiącego magazyn energii cieplnej. Założeniem projektu poza zmniejszeniem emisji spalin jest samowystarczalność systemu grzewczego. Osiągnięte to ma być dzięki instalacji fotowoltaicznej, której moc dobrana została pod zapotrzebowanie pomp ciepła na energię elektryczną. Dzięki zastosowaniu bufora ciepła - magazynu energii, możliwe będzie gromadzenie energii cieplnej na momenty, w których chwilowe zapotrzebowanie przewyższać będzie wydajność systemu. (Polish)
0 references
The aim of the project is to change the heating and heating system in the building of WZURIB sp.z.o.o. from a high-emission boiler burning hard coal to a system based on RES. As part of the project, it is planned to install: — air heat pumps — water with a total power of 60 kW for heating buildings, — photovoltaic installation with a power of approx. 15 kW on the roof of the building to power heat pumps. — hot water buffer constituting a thermal energy storage. The assumption of the project, apart from reducing exhaust emissions, is the self-sufficiency of the heating system. This is to be achieved thanks to the photovoltaic installation, the power of which was selected for the demand of heat pumps for electricity. Thanks to the use of a heat buffer — an energy storage, it will be possible to collect heat energy at moments when the instantaneous demand will exceed the efficiency of the system. (English)
21 October 2022
0 references
WOJ.: LUBELSKIE, POW.: włodawski
0 references
Identifiers
RPLU.15.01.00-06-0320/22
0 references