Installation of a photovoltaic installation for the production of electricity for own use (Q4419617): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Changed label, description and/or aliases in en, and other parts)
label / enlabel / en
 
Installation of a photovoltaic installation for the production of electricity for own use
Property / summary
 
The project will create a photovoltaic installation with a power of 38.16 kWp, free-standing on a plot adjacent to the Dwór Leśce facility and connected to the existing electrical installation of the facility. The installation consists of 72 panels of 530 W, double-sided. A 3-phase 40 kW inverter will be used to connect photovoltaic panels to the mains. The connection installation will be carried out together with the service communication system. Measurement of the operation of the installation necessary for the purposes of notification (eclectic and safety tests of the installation) will be carried out. (English)
Property / summary: The project will create a photovoltaic installation with a power of 38.16 kWp, free-standing on a plot adjacent to the Dwór Leśce facility and connected to the existing electrical installation of the facility. The installation consists of 72 panels of 530 W, double-sided. A 3-phase 40 kW inverter will be used to connect photovoltaic panels to the mains. The connection installation will be carried out together with the service communication system. Measurement of the operation of the installation necessary for the purposes of notification (eclectic and safety tests of the installation) will be carried out. (English) / rank
 
Normal rank
Property / summary: The project will create a photovoltaic installation with a power of 38.16 kWp, free-standing on a plot adjacent to the Dwór Leśce facility and connected to the existing electrical installation of the facility. The installation consists of 72 panels of 530 W, double-sided. A 3-phase 40 kW inverter will be used to connect photovoltaic panels to the mains. The connection installation will be carried out together with the service communication system. Measurement of the operation of the installation necessary for the purposes of notification (eclectic and safety tests of the installation) will be carried out. (English) / qualifier
 
point in time: 21 October 2022
Timestamp+2022-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:27, 21 October 2022

Project Q4419617 in Poland
Language Label Description Also known as
English
Installation of a photovoltaic installation for the production of electricity for own use
Project Q4419617 in Poland

    Statements

    0 references
    84,500.0 zloty
    0 references
    18,784.35 Euro
    0 references
    130,000.0 zloty
    0 references
    28,899.0 Euro
    0 references
    65.0 percent
    0 references
    19 March 2022
    0 references
    31 December 2022
    0 references
    JAROSŁAW STAŃCZAK
    0 references
    0 references
    W ramach projektu zostanie utworzona instalacja fotowoltaiczna o mocy 38,16 kWp, wolnostojąca na działce sąsiadującej z obiektem Dwór Leśce i podłączona do istniejącej instalacji elektrycznej obiektu. Instalacja składa się ze 72 sztuk paneli po 530 W, dwustronnych. Do połączenia paneli fotowoltaicznych z siecią zasilającą zostanie wykorzystany 3-fazowy inwerter 40kW. Wykonana zostanie instalacja przyłączeniowa wraz z systemem komunikacyjnych serwisowym. Dokonane zostanie opomiarowanie pracy instalacji niezbędne dla celów zgłoszeniowych (testy eklektyczne i bezpieczeństwa instalacji). (Polish)
    0 references
    The project will create a photovoltaic installation with a power of 38.16 kWp, free-standing on a plot adjacent to the Dwór Leśce facility and connected to the existing electrical installation of the facility. The installation consists of 72 panels of 530 W, double-sided. A 3-phase 40 kW inverter will be used to connect photovoltaic panels to the mains. The connection installation will be carried out together with the service communication system. Measurement of the operation of the installation necessary for the purposes of notification (eclectic and safety tests of the installation) will be carried out. (English)
    21 October 2022
    0 references
    WOJ.: LUBELSKIE, POW.: lubelski
    0 references
    0 references

    Identifiers

    RPLU.15.01.00-06-0131/22
    0 references