Use of RES for the needs of Communal Economy Company z o.o. in Krasnymstaw | |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is: 1) construction of a photovoltaic installation with a capacity of 209.7 kWp together with accompanying infrastructure producing electricity using renewable energy (solar radiation) for the technological needs of the Wastewater Treatment Plant in Krasnystawa at ul. Evidencing the ewid number. 351/1, rpm. 0002. For the own needs of the facility, a photovoltaic installation with an installed capacity of 209.7 kWp located on the site is being designed. On the ground will be located 466 pc panels with a power of 450 Wp each. The entire installation will be connected through the designed cable-measuring connector to the main object switchgear on the low voltage side. The entire installation will consist of 2 photovoltaic installations connected to 2 connections of the object. The installation with a capacity of 166.2 kWp will be connected to the basic connection. An installation with a capacity of 49.5 kWp will be connected to the backup connection. 2) construction of a photovoltaic system with a power of 49.83 kWp on the ground and attaching it to the internal installation of the building at ul. Bakery 3, plot no ewid. 1958/2 located in the city Krasnystaw. For the own needs of the facility, a photovoltaic micro-installation with an installed capacity of 49.83 kWp is designed, located on the land belonging to the site. The installation will be connected to the main switchgear on the low-voltage side. Three inverters mounted on the substructure of PV panels are designed. The inverters will be connected to the main building switchgear via the designed cable connector. The installed capacity of the projected installation will not exceed the connection power of the facility. (English) | |||||||||||||||
Property / summary: The subject of the project is: 1) construction of a photovoltaic installation with a capacity of 209.7 kWp together with accompanying infrastructure producing electricity using renewable energy (solar radiation) for the technological needs of the Wastewater Treatment Plant in Krasnystawa at ul. Evidencing the ewid number. 351/1, rpm. 0002. For the own needs of the facility, a photovoltaic installation with an installed capacity of 209.7 kWp located on the site is being designed. On the ground will be located 466 pc panels with a power of 450 Wp each. The entire installation will be connected through the designed cable-measuring connector to the main object switchgear on the low voltage side. The entire installation will consist of 2 photovoltaic installations connected to 2 connections of the object. The installation with a capacity of 166.2 kWp will be connected to the basic connection. An installation with a capacity of 49.5 kWp will be connected to the backup connection. 2) construction of a photovoltaic system with a power of 49.83 kWp on the ground and attaching it to the internal installation of the building at ul. Bakery 3, plot no ewid. 1958/2 located in the city Krasnystaw. For the own needs of the facility, a photovoltaic micro-installation with an installed capacity of 49.83 kWp is designed, located on the land belonging to the site. The installation will be connected to the main switchgear on the low-voltage side. Three inverters mounted on the substructure of PV panels are designed. The inverters will be connected to the main building switchgear via the designed cable connector. The installed capacity of the projected installation will not exceed the connection power of the facility. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is: 1) construction of a photovoltaic installation with a capacity of 209.7 kWp together with accompanying infrastructure producing electricity using renewable energy (solar radiation) for the technological needs of the Wastewater Treatment Plant in Krasnystawa at ul. Evidencing the ewid number. 351/1, rpm. 0002. For the own needs of the facility, a photovoltaic installation with an installed capacity of 209.7 kWp located on the site is being designed. On the ground will be located 466 pc panels with a power of 450 Wp each. The entire installation will be connected through the designed cable-measuring connector to the main object switchgear on the low voltage side. The entire installation will consist of 2 photovoltaic installations connected to 2 connections of the object. The installation with a capacity of 166.2 kWp will be connected to the basic connection. An installation with a capacity of 49.5 kWp will be connected to the backup connection. 2) construction of a photovoltaic system with a power of 49.83 kWp on the ground and attaching it to the internal installation of the building at ul. Bakery 3, plot no ewid. 1958/2 located in the city Krasnystaw. For the own needs of the facility, a photovoltaic micro-installation with an installed capacity of 49.83 kWp is designed, located on the land belonging to the site. The installation will be connected to the main switchgear on the low-voltage side. Three inverters mounted on the substructure of PV panels are designed. The inverters will be connected to the main building switchgear via the designed cable connector. The installed capacity of the projected installation will not exceed the connection power of the facility. (English) / qualifier | |||||||||||||||
point in time: 21 October 2022
|
Revision as of 13:27, 21 October 2022
Project Q4419597 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Use of RES for the needs of Communal Economy Company z o.o. in Krasnymstaw |
Project Q4419597 in Poland |
Statements
413,904.2 zloty
0 references
92,010.9 Euro
0 references
1,403,065.15 zloty
0 references
311,901.38 Euro
0 references
29.5 percent
0 references
2 January 2023
0 references
30 June 2023
0 references
PRZEDSIĘBIORSTWO GOSPODARKI KOMUNALNEJ SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Przedmiotem projektu jest: 1) budowa instalacji fotowoltaicznej o mocy 209,7 kWp wraz z infrastrukturą towarzyszącą produkującą energię elektryczną z wykorzystaniem energii odnawialnej (promieniowania słonecznego) na potrzeby technologiczne Oczyszczalni Ścieków w Krasnymstawie przy ul. Zawieprze dz. nr ewid. 351/1, obr. 0002. Na potrzeby własne obiektu projektuje się instalację fotowoltaiczną o mocy zainstalowanej 209,7 kWp zlokalizowaną na gruncie na terenie przynależnym. Na gruncie zostanie zlokalizowanych 466 szt. paneli o mocy 450 Wp każdy. Cała instalacja będzie podłączona poprzez projektowane złącze kablowo-pomiarowe do rozdzielnicy głównej obiektu po stronie niskiego napięcia. Cała instalacja złożona będzie z 2 instalacji fotowoltaicznych przyłączonych do 2 przyłączy obiektu. Do przyłącza podstawowego przyłączona zostanie instalacja o mocy 160,2 kWp. Do przyłącza rezerwowego przyłączona zostanie instalacja o mocy 49,5 kWp. 2) budowa systemu fotowoltaicznego o mocy 49,83 kWp na gruncie i przyłączenie go do instalacji wewnętrznej budynku przy ul. Piekarskiego 3, działka nr ewid. 1958/2 położona na terenie miasta Krasnystaw. Na potrzeby własne obiektu projektuje się mikroinstalację fotowoltaiczną o mocy zainstalowanej 49,83 kWp zlokalizowaną na gruncie na terenie przynależnym. Instalacją będzie podłączona do rozdzielnicy głównej po stronie niskiego napięcia. Projektuje się trzy inwertery montowane na podkonstrukcji paneli PV. Inwertery zostaną podłączone do rozdzielnicy głównej budynku poprzez projektowane złącze kablowe. Moc zainstalowana projektowanej instalacji nie będzie przekraczać mocy przyłączeniowej obiektu. (Polish)
0 references
The subject of the project is: 1) construction of a photovoltaic installation with a capacity of 209.7 kWp together with accompanying infrastructure producing electricity using renewable energy (solar radiation) for the technological needs of the Wastewater Treatment Plant in Krasnystawa at ul. Evidencing the ewid number. 351/1, rpm. 0002. For the own needs of the facility, a photovoltaic installation with an installed capacity of 209.7 kWp located on the site is being designed. On the ground will be located 466 pc panels with a power of 450 Wp each. The entire installation will be connected through the designed cable-measuring connector to the main object switchgear on the low voltage side. The entire installation will consist of 2 photovoltaic installations connected to 2 connections of the object. The installation with a capacity of 166.2 kWp will be connected to the basic connection. An installation with a capacity of 49.5 kWp will be connected to the backup connection. 2) construction of a photovoltaic system with a power of 49.83 kWp on the ground and attaching it to the internal installation of the building at ul. Bakery 3, plot no ewid. 1958/2 located in the city Krasnystaw. For the own needs of the facility, a photovoltaic micro-installation with an installed capacity of 49.83 kWp is designed, located on the land belonging to the site. The installation will be connected to the main switchgear on the low-voltage side. Three inverters mounted on the substructure of PV panels are designed. The inverters will be connected to the main building switchgear via the designed cable connector. The installed capacity of the projected installation will not exceed the connection power of the facility. (English)
21 October 2022
0 references
WOJ.: LUBELSKIE, POW.: krasnostawski
0 references
Identifiers
RPLU.15.01.00-06-0088/22