Property / EU contributionProperty / EU contribution
98,136.11 Euro
Amount98,136.11 Euro
UnitEuro
90,898.57 Euro
Amount90,898.57 Euro
UnitEuro
Property / budgetProperty / budget
126,840.0 Euro
Amount126,840.0 Euro
UnitEuro
117,485.55 Euro
Amount117,485.55 Euro
UnitEuro
Property / location (string)
 
WOJ.: ŁÓDZKIE, POW.: łódzki wschodni
Property / location (string): WOJ.: ŁÓDZKIE, POW.: łódzki wschodni / rank
 
Normal rank
Property / priority axis
 
Property / priority axis: Low-carbon economy / rank
 
Normal rank
Property / co-financing rate
 
77.37 percent
Amount77.37 percent
Unitpercent
Property / co-financing rate: 77.37 percent / rank
 
Normal rank

Revision as of 23:26, 19 October 2022

Project Q101988 in Poland
Language Label Description Also known as
English
Construction of street lighting in Bukovec
Project Q101988 in Poland

    Statements

    0 references
    408,900.45 zloty
    0 references
    90,898.57 Euro
    13 January 2020
    0 references
    528,500.0 zloty
    0 references
    117,485.55 Euro
    13 January 2020
    0 references
    77.37 percent
    0 references
    1 October 2017
    0 references
    30 September 2018
    0 references
    GMINA BRÓJCE
    0 references
    0 references

    51°39'59.0"N, 19°38'13.6"E
    0 references
    CELEM BEZPOŚREDNIM PROJEKTU JEST BUDOWA OŚWIETLENIA ULICZNEGO W BUKOWCU Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH (LEDOWE OPRAWY ULICZNE). BUDOWA W/W INFRASTRUKTURY PRZYCZYNI SIĘ DO POPRAWY JAKOŚCI POWIETRZA NA TERENIE GMINY ORAZ CAŁEGO REGIONU ŁÓDZK., A TAKŻE PRZYCZYNI SIĘ DO ZMNIEJSZENIA ZAPOTRZEBOWANIA NA ENERGIĘ SEKTORA PUBLICZNEGO. CELAMI POŚREDNIMI (SZCZEGÓŁOWYMI) PROJEKTU BĘDĄ: • ZWIĘKSZENIE OBSZARU WOJEW. I KRAJU, NA KTÓRYM POPRAWIE ULEGNIE STAN POWIETRZA, • ZWIĘKSZENIE ŚWIADOMOŚCI SPOŁECZ. W ZAKRESIE OCHRONY ŚROD. W TYM W SZCZEGÓLNOŚCI POWIETRZA, • ZMNIEJSZENIE KOSZTÓW EKSPLOATACYJNYCH OŚWIETLENIA ULICZNEGO W PORÓWNANIU DO BUDOWY W SYSTEMIE TRADYCYJNYM, • ZMNIEJSZENIE ENERGOCHŁONNOŚCI SEKTORA PUBLI., • ZWIĘKSZENIE KOMFORTU ŻYCIA MIESZKAŃCÓW GMINY, • ZWIĘKSZENIE BEZPIECZEŃSTWA MIESZKAŃCÓW GMINY, • POPRAWA WYPOSAŻENIA W INFRASTRUKTURĘ UŻYTECZNOŚCI PUBLI. GMINY, • ZMNIEJSZENIE EMISJI ZANIECZYSZCZEŃ (W TYM CO2). CELEM ZAPEWNIENIA BEZKOLIZYJNEGO PROWADZENIA BUDOWY, KOLEJNOŚĆ WYKONYWANIA ROBÓT BĘDZIE NASTĘPUJĄCA: 1. ZŁĄCZA KABLOWE-KOSZTY KWALIF. GMINA WYKONUJE 8 ZŁĄCZY W SZAFKACH OŚWIETLENIA ULICZNEGO. W RAMACH ODRĘBNEGO OPRACOWANIA - KOSZT REALIZACJI PONOSI PGE DYSTRYBUCJA SA, POZA PROJEKTEM GMINY BUDOWANE SĄ I WYMIENIANE ZŁĄCZA W STACJACH TRANSFORMATOROWYCH. GMINA PONOSI JEDYNIE KOSZT MONTAŻU KABLA OD ZŁĄCZA PGE DO SZAFEK OŚWIETLENIA ULICZNEGO. TAKI ZABIEG JEST KONIECZNY ABY WPIĄĆ PROJEKTOWANE OŚWIETLENIE W ISTNIEJĄCE I ZAPEWNIĆ PRZEPŁYW ENERGII, 2. BUDOWA ROZDZIELNI OŚWIETLENIA ULIC, 3. BUDOWA LINII KABLOWEJ, 4. BUDOWA SŁUPÓW OŚWIETLENIA, 5. MONTAŻ OPRAW OŚWIETLENIA, 6. PODŁĄCZENIE PRZEWODÓW, 7. WYKONANIE POMIARÓW, 8. UPORZĄDKOWANIE TERENU. POTENCJALNYMI UŻYTKOWNIKAMI PROJEKTU BĘDĄ WSZYSCY MIESZKAŃCY GMINY BRÓJCE (W ROKU 2015 R. - ZAMIESZKIWAŁO 6 390 OS) ZE SZCZEGÓLNYM WSKAZANIEM MIESZKAŃCÓW MIEJSCOWOŚCI BUKOWIEC ORAZ POTENCJALNI NOWI MIESZKAŃCY GMINY. (Polish)
    0 references
    THE DIRECT OBJECTIVE OF THE PROJECT IS TO BUILD STREET LIGHTING IN BUKOWC USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT (LED STREET LUMINAIRES). THE CONSTRUCTION OF THE ABOVEMENTIONED INFRASTRUCTURE WILL CONTRIBUTE TO THE IMPROVEMENT OF AIR QUALITY IN THE MUNICIPALITY AND THE ENTIRE ŁÓDZK REGION, AND WILL ALSO CONTRIBUTE TO THE REDUCTION OF PUBLIC SECTOR ENERGY DEMAND. THE INDIRECT (SPECIFIC) OBJECTIVES OF THE PROJECT WILL BE: • INCREASING THE AREA OF VOIVODSHIPS. AND THE COUNTRY WHERE THE AIR CONDITION WILL IMPROVE, • INCREASE PUBLIC AWARENESS. FOR THE PROTECTION OF WEDNESDAYS. IN PARTICULAR, AIR, • REDUCTION OF OPERATING COSTS OF STREET LIGHTING COMPARED TO CONSTRUCTION IN THE TRADITIONAL SYSTEM, • DECREASE THE ENERGY INTENSITY OF THE PUBLI SECTOR., • INCREASE THE COMFORT OF THE RESIDENTS OF THE COMMUNE, • INCREASE SAFETY OF RESIDENTS OF THE MUNICIPALITY, • IMPROVEMENT OF EQUIPMENT WITH THE INFRASTRUCTURE OF UTILITY PUBS. MUNICIPALITIES, • REDUCTION OF POLLUTANT EMISSIONS (INCLUDING CO2). IN ORDER TO ENSURE THAT CONSTRUCTION WORKS ARE CARRIED OUT WITHOUT COLLISION, THE ORDER OF EXECUTION OF THE WORKS SHALL BE AS FOLLOWS: 1. CABLE CONNECTORS-KWALIF COSTS. THE MUNICIPALITY MAKES 8 CONNECTORS IN STREET LIGHTING CABINETS. AS PART OF A SEPARATE STUDY – THE COST OF IMPLEMENTATION IS BORNE BY PGE DISTRIBUTION SA, APART FROM THE PROJECT OF THE COMMUNE, CONNECTORS ARE BUILT AND REPLACED IN TRANSFORMER STATIONS. THE MUNICIPALITY ONLY BEARS THE COST OF INSTALLING THE CABLE FROM THE PGE CONNECTOR TO THE STREET LIGHTING CABINETS. SUCH A TREATMENT IS NECESSARY TO PLUG THE DESIGNED LIGHTING INTO EXISTING AND ENSURE THE FLOW OF ENERGY, 2. CONSTRUCTION OF A STREET LIGHTING SWITCHBOARD, 3. CABLE LINE CONSTRUCTION, 4. CONSTRUCTION OF LIGHT POLES, 5. INSTALLATION OF LIGHTING LUMINAIRES, 6. WIRE CONNECTION, 7. TAKING MEASUREMENTS, 8. TIDY UP THE AREA. POTENTIAL USERS OF THE PROJECT WILL BE ALL RESIDENTS OF BRÓJCE COMMUNE (IN 2015 – HAD A POPULATION OF 6,390 OS) WITH A SPECIAL INDICATION OF THE INHABITANTS OF BUKOWIEC AND POTENTIAL NEW RESIDENTS OF THE COMMUNE. (English)
    17 October 2020
    0 references
    L’OBJECTIF DU PROJET DIRECT EST DE CONSTRUIRE L’ÉCLAIRAGE PUBLIC À BUKOWIEC À L’AIDE D’APPAREILS ÉCONOMES EN ÉNERGIE ET RESPECTUEUX DE L’ENVIRONNEMENT (ÉCLAIRAGES PUBLICS DIRIGÉS). LA CONSTRUCTION DE L’INFRASTRUCTURE SUSMENTIONNÉE CONTRIBUERA À AMÉLIORER LA QUALITÉ DE L’AIR DANS LA MUNICIPALITÉ ET L’ENSEMBLE DE LA RÉGION DE ŁÓDZK ET CONTRIBUERA ÉGALEMENT À RÉDUIRE LA DEMANDE D’ÉNERGIE DU SECTEUR PUBLIC. LES OBJECTIFS INTERMÉDIAIRES (DÉTAILLÉS) DU PROJET SERONT LES SUIVANTS: • AUGMENTER LA ZONE DE GUERRE. ET LE PAYS OÙ L’ÉTAT DE L’AIR VA S’AMÉLIORER • ACCROÎTRE LA SENSIBILISATION DU PUBLIC. EN TERMES DE MESURES DE CONSERVATION. Y COMPRIS, EN PARTICULIER, L’AIR, • LA RÉDUCTION DES COÛTS D’EXPLOITATION DE L’ÉCLAIRAGE PUBLIC PAR RAPPORT À LA CONSTRUCTION DANS LE SYSTÈME TRADITIONNEL, • LA RÉDUCTION DE L’INTENSITÉ ÉNERGÉTIQUE DU SECTEUR PUBLIC. • AUGMENTER LE CONFORT DE VIE DES HABITANTS DE LA COMMUNE, • AUGMENTER LA SÉCURITÉ DES RÉSIDENTS DE LA MUNICIPALITÉ, • AMÉLIORER L’ÉQUIPEMENT DE L’INFRASTRUCTURE DES SERVICES PUBLICS DE LA PUBLICATION. LES MUNICIPALITÉS, • RÉDUIRE LES ÉMISSIONS DE POLLUANTS (Y COMPRIS LE CO2). AFIN D’ASSURER LA NON-COLLISION DE LA CONSTRUCTION, L’ORDRE D’EXÉCUTION DES TRAVAUX SERA LE SUIVANT: 1. CONNECTEURS DE CÂBLE — QUALIF COÛTS. LA MUNICIPALITÉ FABRIQUE 8 CONNECTEURS DANS DES ARMOIRES D’ÉCLAIRAGE PUBLIC. DANS LE CADRE D’UNE ÉTUDE DISTINCTE — LE COÛT DE MISE EN ŒUVRE EST SUPPORTÉ PAR PGE DISTRIBUTION SA, OUTRE LE PROJET, LES MUNICIPALITÉS SONT CONSTRUITES ET REMPLACÉES DES CONNECTEURS DANS LES STATIONS DE TRANSFORMATION. LA COMMUNE NE SUPPORTE QUE LES FRAIS D’INSTALLATION DU CÂBLE DU CONNECTEUR PGE AUX ARMOIRES D’ÉCLAIRAGE PUBLIC. UN TEL TRAITEMENT EST NÉCESSAIRE POUR INSÉRER L’ÉCLAIRAGE CONÇU DANS L’EXISTANT ET ASSURER LE FLUX D’ÉNERGIE, 2. CONSTRUCTION D’UN TABLEAU D’ÉCLAIRAGE PUBLIC, 3. CONSTRUCTION D’UNE LIGNE DE CÂBLE, 4. CONSTRUCTION DE POTEAUX D’ÉCLAIRAGE, 5. INSTALLATION D’APPAREILS D’ÉCLAIRAGE, 6. CONNEXION FILAIRE, 7. PERFORMANCE DES MESURES, 8. NETTOYEZ LE TERRAIN. LES UTILISATEURS POTENTIELS DU PROJET SERONT TOUS LES RÉSIDENTS DE LA COMMUNE DE BRÓJCE (EN 2015-6.390 OS) AVEC UNE INDICATION SPÉCIALE DES HABITANTS DE BUKOWIEC ET DES NOUVEAUX RÉSIDENTS POTENTIELS DE LA MUNICIPALITÉ. (French)
    1 December 2021
    0 references
    ZIEL DES DIREKTPROJEKTS IST DER BAU VON STRASSENBELEUCHTUNGEN IN BUKOWIEC MIT ENERGIESPARENDEN UND UMWELTFREUNDLICHEN GERÄTEN (GEFÃ1⁄4HRTE STRASSENLEUCHTEN). DER BAU DER OBEN GENANNTEN INFRASTRUKTUR WIRD ZUR VERBESSERUNG DER LUFTQUALITÄT IN DER GEMEINDE UND IN DER GESAMTEN REGION ŁÓDZK BEITRAGEN UND AUCH ZUR VERRINGERUNG DES ENERGIEBEDARFS DES ÖFFENTLICHEN SEKTORS BEITRAGEN. DIE ZWISCHENZIELE DES PROJEKTS (DETAILLIERTE) ZIELE SIND: • ERWEITERN SIE DEN BEREICH DES KRIEGES. UND DAS LAND, IN DEM DIE KLIMAANLAGE VERBESSERT WIRD • SENSIBILISIERUNG DER ÖFFENTLICHKEIT. IN BEZUG AUF ERHALTUNGSMASSNAHMEN. EINSCHLIESSLICH INSBESONDERE DER LUFT, • SENKUNG DER BETRIEBSKOSTEN DER STRASSENBELEUCHTUNG IM VERGLEICH ZUM BAU IM TRADITIONELLEN SYSTEM, • VERRINGERUNG DER ENERGIEINTENSITÄT DES PUBLI-SEKTORS. • VERBESSERUNG DES WOHNKOMFORTS DER EINWOHNER DER GEMEINDE, • ERHÖHUNG DER SICHERHEIT DER BEWOHNER DER GEMEINDE, • VERBESSERUNG DER AUSSTATTUNG DER VERSORGUNGSINFRASTRUKTUR DES PUBLI. GEMEINDEN, • VERRINGERUNG DER SCHADSTOFFEMISSIONEN (EINSCHLIESSLICH CO2). UM DIE NICHTKOLLISION DER BAUARBEITEN ZU GEWÄHRLEISTEN, WIRD DIE REIHENFOLGE, IN DER DIE ARBEITEN AUSGEFÜHRT WERDEN, WIE FOLGT LAUTEN: 1. KABELVERBINDER – QUALIF KOSTEN. DIE GEMEINDE STELLT 8 STECKVERBINDER IN STRASSENBELEUCHTUNGSSCHRÄNKEN HER. IM RAHMEN EINER SEPARATEN STUDIE WERDEN DIE IMPLEMENTIERUNGSKOSTEN VON PGE DISTRIBUTION SA GETRAGEN, NEBEN DEM PROJEKT WERDEN DIE GEMEINDEN IN TRANSFORMATORENSTATIONEN GEBAUT UND ERSETZT. DIE GEMEINDE TRÄGT NUR DIE KOSTEN FÜR DIE INSTALLATION DES KABELS VOM PGE-STECKER ZU STRASSENBELEUCHTUNGSSCHRÄNKEN. EINE SOLCHE BEHANDLUNG IST NOTWENDIG, UM DIE ENTWORFENE BELEUCHTUNG IN DAS BESTEHENDE EINZUFÜGEN UND DEN ENERGIEFLUSS ZU GEWÄHRLEISTEN, 2. BAU EINER STRASSENBELEUCHTUNGSSCHALTTAFEL, 3. BAU EINER SEILBAHN, 4. BAU VON BELEUCHTUNGSSTÖCKEN, 5. EINBAU VON BELEUCHTUNGSEINRICHTUNGEN, 6. DRAHTANSCHLUSS, 7. LEISTUNG DER MESSUNGEN, 8. BEREINIGEN SIE DAS GELÄNDE. POTENTIELLE NUTZER DES PROJEKTS WERDEN ALLE BEWOHNER DER GEMEINDE BRÓJCE (2015-6,390 OS) SEIN, MIT EINEM BESONDEREN HINWEIS AUF DIE EINWOHNER VON BUKOWIEC UND POTENZIELLE NEUE BEWOHNER DER GEMEINDE. (German)
    7 December 2021
    0 references
    HET DOEL VAN HET DIRECTE PROJECT IS OM STRAATVERLICHTING IN BUKOWIEC TE BOUWEN MET BEHULP VAN ENERGIEBESPARENDE EN MILIEUVRIENDELIJKE APPARATEN (LED STREET ARMATUREN). DE AANLEG VAN BOVENGENOEMDE INFRASTRUCTUUR ZAL BIJDRAGEN TOT DE VERBETERING VAN DE LUCHTKWALITEIT IN DE GEMEENTE EN DE GEHELE REGIO ŁÓDZK EN ZAL OOK BIJDRAGEN TOT DE VERMINDERING VAN DE VRAAG NAAR ENERGIE IN DE PUBLIEKE SECTOR. DE TUSSENTIJDSE (GEDETAILLEERDE) DOELSTELLINGEN VAN HET PROJECT ZIJN: • UITBREIDING VAN HET OORLOGSGEBIED. EN HET LAND WAAR DE AIRCONDITIONING ZAL VERBETEREN • HET PUBLIEK BEWUSTER MAKEN. WAT DE INSTANDHOUDINGSMAATREGELEN BETREFT. MET NAME LUCHT, • VERMINDERING VAN DE EXPLOITATIEKOSTEN VAN STRAATVERLICHTING TEN OPZICHTE VAN DE BOUW IN HET TRADITIONELE SYSTEEM, • VERMINDERING VAN DE ENERGIE-INTENSITEIT VAN DE PUBLISECTOR; • VERHOGING VAN HET WOONCOMFORT VAN DE INWONERS VAN DE GEMEENTE, • VERBETERING VAN DE VEILIGHEID VAN DE INWONERS VAN DE GEMEENTE, • VERBETERING VAN DE UITRUSTING VAN DE NUTSVOORZIENINGEN VAN DE PUBLI. GEMEENTEN, • VERMINDEREN VAN DE UITSTOOT VAN VERONTREINIGENDE STOFFEN (INCLUSIEF CO2). OM DE NIET-INSTORTING VAN DE BOUW TE WAARBORGEN, ZAL DE VOLGORDE WAARIN DE WERKZAAMHEDEN WORDEN UITGEVOERD, ALS VOLGT ZIJN: 1. KABELCONNECTOREN — QUALIF KOSTEN. DE GEMEENTE MAAKT 8 AANSLUITINGEN IN STRAATVERLICHTING KASTEN. ALS ONDERDEEL VAN EEN AFZONDERLIJKE STUDIE — DE UITVOERINGSKOSTEN WORDEN GEDRAGEN DOOR PGE DISTRIBUTIE SA, AFGEZIEN VAN HET PROJECT WORDEN DE GEMEENTEN GEBOUWD EN VERVANGEN CONNECTOREN IN TRANSFORMATORSTATIONS. DE GEMEENTE DRAAGT ALLEEN DE KOSTEN VOOR DE INSTALLATIE VAN DE KABEL VAN DE PGE-AANSLUITING NAAR STRAATVERLICHTINGSKASTEN. EEN DERGELIJKE BEHANDELING IS NOODZAKELIJK OM DE ONTWORPEN VERLICHTING IN DE BESTAANDE TE PLAATSEN EN DE STROOM VAN ENERGIE TE VERZEKEREN, 2. BOUW VAN EEN STRAATVERLICHTING SCHAKELBORD, 3. AANLEG VAN KABELLIJN, 4. BOUW VAN VERLICHTINGSPALEN, 5. INSTALLATIE VAN VERLICHTINGSARMATUREN, 6. DRAADAANSLUITING, 7. PRESTATIES VAN DE METINGEN, 8. RUIM HET TERREIN OP. POTENTIËLE GEBRUIKERS VAN HET PROJECT ZIJN ALLE BEWONERS VAN DE GEMEENTE BRÓJCE (IN 2015-6.390 OS) MET EEN SPECIALE VERMELDING VAN DE INWONERS VAN BUKOWIEC EN POTENTIËLE NIEUWE BEWONERS VAN DE GEMEENTE. (Dutch)
    17 December 2021
    0 references
    LO SCOPO DEL PROGETTO DIRETTO È QUELLO DI COSTRUIRE L'ILLUMINAZIONE STRADALE A BUKOWIEC UTILIZZANDO DISPOSITIVI A RISPARMIO ENERGETICO ED ECO-COMPATIBILI (LUCI STRADALI A GUIDA). LA COSTRUZIONE DELLA SUDDETTA INFRASTRUTTURA CONTRIBUIRÀ A MIGLIORARE LA QUALITÀ DELL'ARIA NEL COMUNE E NELL'INTERA REGIONE DI ŁÓDZK E CONTRIBUIRÀ ANCHE A RIDURRE LA DOMANDA DI ENERGIA DEL SETTORE PUBBLICO. GLI OBIETTIVI INTERMEDI (DETTAGLIATI) DEL PROGETTO SARANNO I SEGUENTI: • AUMENTARE LA ZONA DI GUERRA. E IL PAESE IN CUI L'ARIA CONDIZIONATA MIGLIORERÀ • AUMENTARE LA SENSIBILIZZAZIONE DELL'OPINIONE PUBBLICA. IN TERMINI DI MISURE DI CONSERVAZIONE. TRA CUI, IN PARTICOLARE, ARIA, • RIDUZIONE DEI COSTI OPERATIVI DELL'ILLUMINAZIONE STRADALE RISPETTO ALLA COSTRUZIONE NEL SISTEMA TRADIZIONALE, • RIDUZIONE DELL'INTENSITÀ ENERGETICA DEL SETTORE PUBLI. • AUMENTARE IL COMFORT ABITATIVO DEGLI ABITANTI DEL COMUNE, • AUMENTARE LA SICUREZZA DEI RESIDENTI DEL COMUNE, • MIGLIORARE LE ATTREZZATURE DELLE INFRASTRUTTURE DI PUBBLICA UTILITÀ DEI PUBLI. COMUNI, • RIDURRE LE EMISSIONI DI INQUINANTI (INCLUSO CO2). AL FINE DI GARANTIRE LA NON COLLISIONE DELLA COSTRUZIONE, L'ORDINE DI ESECUZIONE DEI LAVORI SARÀ IL SEGUENTE: 1. CONNETTORI PER CAVI — COSTI DI QUALITÀ. IL COMUNE FA 8 CONNETTORI IN ARMADI DI ILLUMINAZIONE STRADALE. NELL'AMBITO DI UNO STUDIO SEPARATO, IL COSTO DI REALIZZAZIONE È A CARICO DI PGE DISTRIBUTION SA, OLTRE AL PROGETTO, I COMUNI SONO COSTRUITI E SOSTITUITI CONNETTORI NELLE STAZIONI DI TRASFORMAZIONE. IL COMUNE SOSTIENE SOLO I COSTI DI INSTALLAZIONE DEL CAVO DAL CONNETTORE PGE AGLI ARMADI DI ILLUMINAZIONE STRADALE. TALE TRATTAMENTO È NECESSARIO PER INSERIRE L'ILLUMINAZIONE PROGETTATA NELL'ESISTENTE E GARANTIRE IL FLUSSO DI ENERGIA, 2. COSTRUZIONE DI UN QUADRO DI ILLUMINAZIONE STRADALE, 3. COSTRUZIONE DI CAVI DI LINEA, 4. COSTRUZIONE DI PALI DI ILLUMINAZIONE, 5. INSTALLAZIONE DI APPARECCHI DI ILLUMINAZIONE, 6. COLLEGAMENTO A FILO, 7. PRESTAZIONI DELLE MISURAZIONI, 8. PULISCI IL TERRENO. I POTENZIALI UTENTI DEL PROGETTO SARANNO TUTTI RESIDENTI DEL COMUNE DI BRÓJCE (NEL 2015-6,390 OS) CON UNA SPECIALE INDICAZIONE DEGLI ABITANTI DI BUKOWIEC E DEI POTENZIALI NUOVI RESIDENTI DEL COMUNE. (Italian)
    15 January 2022
    0 references
    EL OBJETIVO DEL PROYECTO DIRECTO ES CONSTRUIR ALUMBRADO PÚBLICO EN BUKOWIEC UTILIZANDO DISPOSITIVOS DE AHORRO DE ENERGÍA Y RESPETUOSOS DEL MEDIO AMBIENTE (LUZADORAS CALLEJERAS DIRIGIDAS). LA CONSTRUCCIÓN DE LA INFRAESTRUCTURA MENCIONADA CONTRIBUIRÁ A MEJORAR LA CALIDAD DEL AIRE EN EL MUNICIPIO Y EN TODA LA REGIÓN DE ŁÓDZK, Y TAMBIÉN CONTRIBUIRÁ A REDUCIR LA DEMANDA ENERGÉTICA DEL SECTOR PÚBLICO. LOS OBJETIVOS INTERMEDIOS (DETALLADOS) DEL PROYECTO SERÁN: • AUMENTAR EL ÁREA DE GUERRA. Y EL PAÍS DONDE EL AIRE ACONDICIONADO MEJORARÁ • AUMENTAR LA SENSIBILIZACIÓN DEL PÚBLICO. EN TÉRMINOS DE MEDIDAS DE CONSERVACIÓN. INCLUYENDO, EN PARTICULAR, AIRE, • REDUCCIÓN DE LOS COSTES OPERATIVOS DEL ALUMBRADO PÚBLICO EN COMPARACIÓN CON LA CONSTRUCCIÓN EN EL SISTEMA TRADICIONAL, • REDUCCIÓN DE LA INTENSIDAD ENERGÉTICA DEL SECTOR PÚBLICO. • AUMENTAR EL CONFORT DE VIDA DE LOS HABITANTES DEL MUNICIPIO, • AUMENTAR LA SEGURIDAD DE LOS RESIDENTES DEL MUNICIPIO, • MEJORAR EL EQUIPAMIENTO DE LA INFRAESTRUCTURA DE SERVICIOS PÚBLICOS DE LA PUBLICACIÓN. MUNICIPIOS, • REDUCIR LAS EMISIONES DE CONTAMINANTES (INCLUIDO EL CO2). CON EL FIN DE GARANTIZAR LA NO COLISIÓN DE LA CONSTRUCCIÓN, EL ORDEN EN QUE SE LLEVAN A CABO LAS OBRAS SERÁ EL SIGUIENTE: 1. CONECTORES DE CABLE — COSTOS CALIF. EL MUNICIPIO FABRICA 8 CONECTORES EN ARMARIOS DE ALUMBRADO PÚBLICO. COMO PARTE DE UN ESTUDIO SEPARADO — EL COSTE DE IMPLEMENTACIÓN ES SUFRAGADO POR PGE DISTRIBUTION SA, APARTE DEL PROYECTO LOS MUNICIPIOS SE CONSTRUYEN Y REEMPLAZAN CONECTORES EN ESTACIONES DE TRANSFORMADORES. EL MUNICIPIO SOLO ASUME EL COSTO DE INSTALAR EL CABLE DESDE EL CONECTOR PGE A LOS ARMARIOS DE ALUMBRADO PÚBLICO. ESTE TRATAMIENTO ES NECESARIO PARA INSERTAR LA ILUMINACIÓN DISEÑADA EN LA EXISTENTE Y GARANTIZAR EL FLUJO DE ENERGÍA, 2. CONSTRUCCIÓN DE UNA CENTRALITA DE ALUMBRADO PÚBLICO, 3. CONSTRUCCIÓN DE LA LÍNEA DE CABLE, 4. CONSTRUCCIÓN DE POSTES DE ILUMINACIÓN, 5. INSTALACIÓN DE APARATOS DE ILUMINACIÓN, 6. CONEXIÓN DE CABLE, 7. RENDIMIENTO DE LAS MEDICIONES, 8. LIMPIA EL TERRENO. LOS POSIBLES USUARIOS DEL PROYECTO SERÁN TODOS LOS RESIDENTES DE LA COMUNA DE BRÓJCE (EN 2015-6.390 OS) CON UNA INDICACIÓN ESPECIAL DE LOS HABITANTES DE BUKOWIEC Y POTENCIALES NUEVOS RESIDENTES DEL MUNICIPIO. (Spanish)
    18 January 2022
    0 references
    PROJEKTI OTSENE EESMÄRK ON EHITADA BUKOWCI TÄNAVAVALGUSTUS, KASUTADES ENERGIASÄÄSTLIKKE JA ÖKOLOOGILISI SEADMEID (JUHITAVAD TÄNAVAVALGUSTID). EESPOOL NIMETATUD INFRASTRUKTUURI EHITAMINE AITAB KAASA ÕHUKVALITEEDI PARANDAMISELE OMAVALITSUSÜKSUSES JA KOGU ÅDZK PIIRKONNAS NING AITAB VÄHENDADA KA AVALIKU SEKTORI ENERGIANÕUDLUST. PROJEKTI KAUDSED (KONKREETSED) EESMÄRGID ON JÄRGMISED: VOIVODSHIPSi AREA INCREASING. Ja LIIKES LIIKMESRIIK IMPROVE, âEUR Â Â INCREASE PUBLIC AWARENESS. KOLMAPÄEVADE KAITSEKS. PARTIKULAR, AIR, âEUR Â Â Â ā EUR ¢ TÄHELEPANU TÄHELEPANU KÄSITLEVA SÜSTEEMISED, âEUR Â Â DEEKTORI ENERGY INTENSITY of the PUBLI SEKTOR., âEUR Â Â INCREASE COMFORT of THE RESIDENTs of the COMMUNE, ā EUR ā EUR Ã1⁄4kskÃ1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4Ã1⁄4 Omavalitsused, POLLUTANT EMISSIONS (INCLUDING CO2) REDUCTION OF POLLUTANTE EMISSIONS (INCLUDING CO2). SELLEKS ET TAGADA EHITUSTÖÖDE TEOSTAMINE ILMA KOKKUPÕRGETETA, ON TÖÖDE TEOSTAMISE JÄRJEKORD JÄRGMINE: 1. KAABEL PISTIKUD-KWALIF KULUD. LINNAVALITSUS EHITAB TÄNAVAVALGUSTUSE KAPPIDESSE 8 PISTIKÜHENDUST. SUPRUATE SUUNISE KOOSTÖÖ KOOSTÖÖ RAKENDAMISE KOHTUASI SUUNISE VASTU VÕTNUD KOOSTÖÖ, ÜHENDUSTE ÜHENDUSTE PROJEKTID, KOHTUASJAD JA VALITSUSTE TRANSFORMER STATIONS. OMAVALITSUS KANNAB AINULT KAABLI PAIGALDAMISE KULUD PGE PISTIKUST TÄNAVAVALGUSTUSE KAPPIDESSE. SELLINE TÖÖTLEMINE ON VAJALIK SELLEKS, ET ÜHENDADA PROJEKTEERITUD VALGUSTUS OLEMASOLEVATESSE JA TAGADA ENERGIAVOOL, 2. TÄNAVAVALGUSTUSE JAOTUSKILBI EHITUS, 3. KAABLILIINI EHITUS, 4. VALGUSPOSTIDE EHITUS, 5. VALGUSTITE PAIGALDAMINE, 6. JUHTMEÜHENDUS, 7. MÕÕTMISTE TEGEMINE, 8. KORISTA ALA ÄRA. Potentsiaalsed KASUTUSED KÕIK KÕRGUSED BRÃJCE COMMUNE (IN 2015 â EUR â EUR A POPULATION of 6,390 OS) KÕRGUSTE SUHTES Bukowiec and POTENTIAL NEW RESIDENTS of the COMMUNE. (Estonian)
    27 July 2022
    0 references
    TIESIOGINIS PROJEKTO TIKSLAS – STATYTI GATVIŲ APŠVIETIMĄ BUKOWC NAUDOJANT ENERGIJĄ TAUPANČIĄ IR EKOLOGIŠKĄ ĮRANGĄ (REDUKUOTUS GATVIŲ ŠVIESTUVUS). PIRMIAU MINĖTOS INFRASTRUKTŪROS STATYBA PRISIDĖS PRIE ORO KOKYBĖS GERINIMO SAVIVALDYBĖJE IR VISAME ÅÃZK REGIONE, TAIP PAT PRISIDĖS PRIE VIEŠOJO SEKTORIAUS ENERGIJOS PAKLAUSOS MAŽINIMO. NETIESIOGINIAI (KONKRETŪS) PROJEKTO TIKSLAI BUS ŠIE: â EUR ¢ INCREASING VOIVODSHIPS SĄRAŠAS. Ir ŠALIS, kurios AIR CONDITION bus IMPROVE, ā EUR ¢ INCREASE PUBLIC AWARENESS. DĖL TREČIADIENIŲ APSAUGOS. PARTICULAROJE, AIR, â EUR â EUR â EUR ¢ ĮSIPAREIGOJIMO KAIP STREETŲ ŠVIETIMO KONTROLĖ, PATVIRTINTI PREKYBOS SISTEMĄ, ā EUR â EUR ¢ â EUR ¢ PATEIKTI COMMUNE REZIDENTŲ KOMUNIKATŲ KOMUNIKATO KOMUNIKATĄ, â EUR â EUR ¢ INCREASE SAFETY SAUGUMO PRIEMONIŲ VALSTYBIŲ, ā EUR ¢ â EUR ¢ ĮGYVENDINIMO ĮGYVENDINIMO SU UTILITIJŲ INFRASTRUKTŪRA. Savivaldybės, ā EUR ¢ POLLUTANT EMISSIONS (INCLUDING CO2) REDUCTION. SIEKIANT UŽTIKRINTI, KAD STATYBOS DARBAI BŪTŲ ATLIEKAMI BE SUSIDŪRIMO, DARBŲ ATLIKIMO TVARKA YRA TOKIA: 1. KABELIŲ JUNGTYS-KWALIF IŠLAIDOS. SAVIVALDYBĖ GAMINA 8 JUNGTIS GATVIŲ APŠVIETIMO SPINTOSE. Kaip dalis SEPARATE STUDY â ĮGYVENDINIMO SĄRAŠAS yra BORNE BY PGE DISTRIBUTION SA, ATSIŽVELGTI iš COMMUNE PROJEKTO, KONKRETŲ KONKRETŲ IR REPLEKTŲ TRANSFORMER STACIJOS. SAVIVALDYBĖ PADENGIA TIK KABELIO ĮRENGIMO IŠ PGE JUNGTIES Į GATVIŲ APŠVIETIMO SPINTAS IŠLAIDAS. TOKS GYDYMAS YRA BŪTINA PRIJUNGTI SUPROJEKTUOTĄ APŠVIETIMĄ Į ESAMĄ IR UŽTIKRINTI ENERGIJOS SRAUTĄ, 2. GATVĖS APŠVIETIMO SKIRSTOMOJO SKYDO STATYBA, 3. KABELINĖS LINIJOS STATYBA, 4. ŠVIESOS STULPŲ STATYBA, 5. APŠVIETIMO ŠVIESTUVŲ MONTAVIMAS, 6. LAIDŲ JUNGTIS, 7. MATAVIMAS, 8. SUTVARKYTI VIETOVĘ. Potencialūs PROJEKTO VARTOTOJAI bus visi BRÃJCE COMMUNE RESIDENTAI (IN 2015 â EUR HAD 6,390 OS POPULATION) SU Bukowiec ir POTENTIAL NAUJŲ KOMUNIKATŲ NAUJŲ NAUJŲ MOKYMOSIOS NAUJŲ RESIDENTŲ SPECIALIOJAMA. (Lithuanian)
    27 July 2022
    0 references
    IZRAVNI CILJ PROJEKTA JE IZGRADNJA ULIČNE RASVJETE U BUKOWC-U KORIŠTENJEM ENERGETSKE I EKOLOŠKE OPREME (LED ULIČNIH RASVJETNIH TIJELA). IZGRADNJOM NAVEDENE INFRASTRUKTURE PRIDONIJET ĆE SE POBOLJŠANJU KVALITETE ZRAKA U OPĆINI I CIJELOJ REGIJI ÅÃDZK, A PRIDONIJET ĆE I SMANJENJU POTRAŽNJE ZA ENERGIJOM U JAVNOM SEKTORU. NEIZRAVNI (POSEBNI) CILJEVI PROJEKTA BIT ĆE: „zahtijevajući RIJEČE VOIVSHIPS”. I ZEMLJIŠTE KOJE KONDICIJU BOJE IZVJEŠĆE U PUBLIČKU UPRAVLJANJE. ZA ZAŠTITU SRIJEDOM. U PARTICULAR-u, AIR, â EUR Â OBAVIJESTI OPERATING COSTS STREET LIGHTING COMPARED ZA KONSTRUCIJE U TRGOVINSKOM SUSTAVU, â EUR Recenzije UPRAVLJANJE PODRUČJA ENERGY INTENSITY SECTORA PUBLIKE., â EUR ◄ INCREASE ODBORA REZIDENTA KOMUNA, â EUR Õ INCREASE SAFETY RESIDENTs of the MUNICIPALITY, IMPROVEMENT OF EQUIPMENT S INFRASTRUCTURE OF UTILITY PUBS. Općine, REDUKCIJA POLLUTANTNIH EMISIJA (INCLUDING CO2). KAKO BI SE OSIGURALO DA SE GRAĐEVINSKI RADOVI IZVODE BEZ SUDARA, REDOSLIJED IZVOĐENJA RADOVA JE SLJEDEĆI: 1. KABELSKI PRIKLJUČCI-KWALIF TROŠKOVI. OPĆINA PROIZVODI 8 KONEKTORA U ORMARIMA ZA ULIČNU RASVJETU. Kao DIO EPARATE DRUDIJA â EUR JE COST IMPLEMENTACIJE je BORNE BY PGE DISTRIBUTION SA, APART OD PROJEKTA KOMUNA, KONNEKTORI ARE BUILT I REPLACED u TRANSFORMER STATIONS. OPĆINA SNOSI SAMO TROŠKOVE UGRADNJE KABELA IZ PRIKLJUČKA PGE NA ORMARE ZA ULIČNU RASVJETU. TAKAV TRETMAN JE POTREBNO PRIKLJUČITI DIZAJNIRANU RASVJETU U POSTOJEĆE I OSIGURATI PROTOK ENERGIJE, 2. IZGRADNJA SKLOPNE PLOČE ZA ULIČNU RASVJETU, 3. IZGRADNJA KABELSKE LINIJE, 4. IZGRADNJA SVJETLOSNIH STUPOVA, 5. UGRADNJA RASVJETNIH TIJELA, 6. ŽIČANA VEZA, 7. MJERENJE, 8. POSPREMITI PODRUČJE. Potencijalni USLUGE PROJEKTA ĆE biti sve RESIDENTS BRÃJCE COMMUNE (u 2015-u je imao POPULATION of 6,390 OS) S SPECIJALNA INDIKACIJA INHABITANTS of Bukowiec i POTENTIAL NEW RESIDENTs of the COMMUNE. (Croatian)
    27 July 2022
    0 references
    ΆΜΕΣΟΣ ΣΤΌΧΟΣ ΤΟΥ ΈΡΓΟΥ ΕΊΝΑΙ Η ΚΑΤΑΣΚΕΥΉ ΟΔΙΚΟΎ ΦΩΤΙΣΜΟΎ ΣΤΟ BUKOWC ΜΕ ΤΗ ΧΡΉΣΗ ΕΞΟΠΛΙΣΜΟΎ ΕΞΟΙΚΟΝΌΜΗΣΗΣ ΕΝΈΡΓΕΙΑΣ ΚΑΙ ΟΙΚΟΛΟΓΙΚΟΎ ΕΞΟΠΛΙΣΜΟΎ (ΟΔΗΓΗΜΈΝΑ ΦΩΤΙΣΤΙΚΆ ΤΟΥ ΔΡΌΜΟΥ). Η ΚΑΤΑΣΚΕΥΉ ΤΗΣ ΠΡΟΑΝΑΦΕΡΘΕΊΣΑΣ ΥΠΟΔΟΜΉΣ ΘΑ ΣΥΜΒΆΛΕΙ ΣΤΗ ΒΕΛΤΊΩΣΗ ΤΗΣ ΠΟΙΌΤΗΤΑΣ ΤΟΥ ΑΈΡΑ ΣΤΟΝ ΔΉΜΟ ΚΑΙ ΣΕ ΟΛΌΚΛΗΡΗ ΤΗΝ ΠΕΡΙΦΈΡΕΙΑ ÅDZK ΚΑΙ ΘΑ ΣΥΜΒΆΛΕΙ ΕΠΊΣΗΣ ΣΤΗ ΜΕΊΩΣΗ ΤΗΣ ΕΝΕΡΓΕΙΑΚΉΣ ΖΉΤΗΣΗΣ ΤΟΥ ΔΗΜΌΣΙΟΥ ΤΟΜΈΑ. ΟΙ ΈΜΜΕΣΟΙ (ΕΙΔΙΚΟΊ) ΣΤΌΧΟΙ ΤΟΥ ΣΧΕΔΊΟΥ ΘΑ ΕΊΝΑΙ: ΑΣΦΑΛΙΖΟΝΤΑΣ την ΠΕΡΙΟΧΗ VOIVODSHIPS. Και η χώρα όπου η θέση τους θα εμβαθύνει, απαιτούμε δημόσια άδεια. ΓΙΑ ΤΗΝ ΠΡΟΣΤΑΣΊΑ ΤΩΝ ΤΕΤΆΡΤΩΝ. Σε ΣΥΜΜΕΤΟΧΗ, AIR, â EUR â EUR â EUR TM s REDUCTION OF OPERATING COSTS OF STREET LIGHTING TO CONSTRUCTION IN THE TRADITIONAL SYSTEM, ΑΝΑΦΕΡΟΝΤΑΙ ΤΗΝ ΕΝΕΡΓΕΙΑ ΤΗΣ ΕΝΕΡΓΕΙΑΣ ΤΟΥ ΔΗΜΟΣΙΟΥ ΤΟΜΕΑ. ΑΣΦΑΛΙΖΟΥΝ ΑΣΦΑΛΕΙΑ ΤΩΝ ΑΠΟΖΗΜΙΩΤΩΝ ΤΗΣ ΔΗΜΟΚΡΑΤΙΑΣ, ΒΕΛΤΙΩΣΗ ΤΟΥ ΕΞΟΠΛΙΣΜΟΥ ΜΕ ΤΗΝ ΕΝΗΜΕΡΩΣΗ ΤΗΣ ΔΗΜΟΚΡΑΤΙΑΣ. Δήμοι, â EUR ¢ REDUCTION OF POLLUTANT EMISSIONS (ΠΕΡΙΛΑΜΒΑΝΟΝΤΑΣ CO2). ΠΡΟΚΕΙΜΈΝΟΥ ΝΑ ΔΙΑΣΦΑΛΙΣΤΕΊ ΌΤΙ ΟΙ ΚΑΤΑΣΚΕΥΑΣΤΙΚΈΣ ΕΡΓΑΣΊΕΣ ΕΚΤΕΛΟΎΝΤΑΙ ΧΩΡΊΣ ΣΎΓΚΡΟΥΣΗ, Η ΕΝΤΟΛΉ ΕΚΤΈΛΕΣΗΣ ΤΩΝ ΕΡΓΑΣΙΏΝ ΈΧΕΙ ΩΣ ΕΞΉΣ: 1. ΣΥΝΔΕΤΉΡΕΣ ΚΑΛΩΔΊΩΝ-KWALIF ΚΌΣΤΟΣ. Ο ΔΉΜΟΣ ΚΑΤΑΣΚΕΥΆΖΕΙ 8 ΣΥΝΔΕΤΉΡΕΣ ΣΕ ΕΡΜΆΡΙΑ ΦΩΤΙΣΜΟΎ ΟΔΏΝ. ΩΣ ΜΕΡΟΣ ΤΗΣ ΔΙΑΣΤΟΛΗΣ Α.Ε., το ΚΟΣΤΟΣ ΤΗΣ ΕΦΑΡΜΟΓΗΣ ειναι ΑΠΟ ΤΗΝ ΠΑΡΟΥΣΙΑΣΗ Α.Ε., ΕΦΑΡΜΟΓΗ απο το ΠΡΟΓΡΑΜΜΑ ΤΟΥ ΚΟΙΝΟΥ, οι ΣΥΝΔΕΣΜΟΙ ΑΝΤΙΠΡΟΣΩΠΕΥΟΝΤΑΙ ΚΑΙ ΑΝΑΦΕΡΟΝΤΑΙ ΣΤΙΣ ΜΕΤΑΦΟΡΕΣ. Ο ΔΉΜΟΣ ΑΝΑΛΑΜΒΆΝΕΙ ΜΌΝΟ ΤΟ ΚΌΣΤΟΣ ΕΓΚΑΤΆΣΤΑΣΗΣ ΤΟΥ ΚΑΛΩΔΊΟΥ ΑΠΌ ΤΟΝ ΣΎΝΔΕΣΜΟ PGE ΣΤΑ ΕΡΜΆΡΙΑ ΦΩΤΙΣΜΟΎ ΤΟΥ ΔΡΌΜΟΥ. ΜΙΑ ΤΈΤΟΙΑ ΕΠΕΞΕΡΓΑΣΊΑ ΕΊΝΑΙ ΑΠΑΡΑΊΤΗΤΗ ΓΙΑ ΝΑ ΣΥΝΔΈΣΕΙ ΤΟ ΣΧΕΔΙΑΣΜΈΝΟ ΦΩΤΙΣΜΌ ΣΕ ΥΠΆΡΧΟΝΤΑ ΚΑΙ ΝΑ ΕΞΑΣΦΑΛΊΣΕΙ ΤΗ ΡΟΉ ΤΗΣ ΕΝΈΡΓΕΙΑΣ, 2. ΚΑΤΑΣΚΕΥΉ ΠΊΝΑΚΑ ΔΙΑΝΟΜΉΣ ΦΩΤΙΣΜΟΎ ΟΔΏΝ, 3. ΚΑΤΑΣΚΕΥΉ ΚΑΛΩΔΊΩΝ, 4. ΚΑΤΑΣΚΕΥΉ ΦΩΤΕΙΝΏΝ ΠΌΛΩΝ, 5. ΕΓΚΑΤΆΣΤΑΣΗ ΦΩΤΙΣΤΙΚΏΝ, 6. ΣΎΝΔΕΣΗ ΚΑΛΩΔΊΩΝ, 7. ΛΉΨΗ ΜΕΤΡΉΣΕΩΝ, 8. ΤΑΚΤΟΠΟΙΉΣΤΕ ΤΗΝ ΠΕΡΙΟΧΉ. Οι δυνητικοί ΧΡΗΣΤΕΣ του ΕΡΓΟΥ θα ειναι ΟΛΟΙ ΑΠΟΔΕΚΤΕΣ ΤΗΣ ΚΟΙΝΟΤΗΤΑΣ (το 2015 â EUR â EUR HAD A POPULATION of 6.390 OS) ΜΕ ΕΙΔΙΚΗ ΕΝΔΕΙΞΗ ΤΩΝ ΘΕΜΑΤΩΝ του Bukowiec και των ΠΟΛΙΤΙΚΩΝ ΝΕΑ ΑΠΟΔΕΚΤΩΝ ΤΗΣ ΚΟΙΝΟΤΗΤΑΣ. (Greek)
    27 July 2022
    0 references
    PRIAMYM CIEĽOM PROJEKTU JE VYBUDOVAŤ POULIČNÉ OSVETLENIE V BUKOWC POMOCOU ENERGETICKY ÚSPORNÝCH A EKOLOGICKÝCH ZARIADENÍ (VEDENÉ POULIČNÉ SVIETIDLÁ). VÝSTAVBA UVEDENEJ INFRAŠTRUKTÚRY PRISPEJE K ZLEPŠENIU KVALITY OVZDUŠIA V OBCI A V CELOM REGIÓNE ŠÍDZK A PRISPEJE AJ K ZNÍŽENIU DOPYTU VEREJNÉHO SEKTORA PO ENERGII. NEPRIAME (ŠPECIFICKÉ) CIELE PROJEKTU BUDÚ: â EUR ¢ INCREASING AREA OF VOIVODSHIPS. A KRAJINA, KTORÉ KTORÉ MÔŽU OCHRANY, â EUR ¢ INCREASE PUBLICKÉ ZÁKLADNOSTI. NA OCHRANU STREDY. In PARTICULAR, AIR, â EUR ¢ REDUCTION OF OPERATING COSTS OF STREET LIGHTING DOHODNUTIE VTRADITIONAL SYSTEM, â EUR ¢ Otvoriť ENERGY ÚČINNOSTI PUBLI SEKTOR., â EUR ¢ INCREASE the COMFORT OF THE REIDENTS OF the COMMUNE, â EUR ¢ INCREASE BEZPEČNOSTI ZÁKLADNOSTI MUNIKIPALITY, â EUR ¢ ¢ PROVEMENT VYBAVENIE S INFRASTRUCTU UTILITY PUBS. Obce, â EUR ¢ REDUCTION OF POLLUTANT EMISSIONS (INCLUDING CO2). S CIEĽOM ZABEZPEČIŤ, ABY SA STAVBY VYKONÁVALI BEZ ZRÁŽKY, PORADIE VYKONANIA PRÁC JE TAKÉTO: 1. KÁBLOVÉ KONEKTORY-KWALIF NÁKLADY. OBEC VYRÁBA 8 KONEKTOROV V SKRINIACH POULIČNÉHO OSVETLENIA. Ako ČASŤ SEPARATE STUDY â EUR â EUR OST VYKONÁVACIE IMPLEMENTÁCIE JE BORNE BY PGE DISTRIBUTION SA, ČASŤ Z PROJEKTU SPOLOČNOSTI, CONNECTORS sú BUILT A REPLACED v transFORMER ŠTÁCIE. OBEC ZNÁŠA LEN NÁKLADY NA INŠTALÁCIU KÁBLA Z KONEKTORA PGE DO POULIČNÝCH OSVETĽOVACÍCH SKRÍŇ. TAKÁTO ÚPRAVA JE POTREBNÁ NA PRIPOJENIE NAVRHNUTÉHO OSVETLENIA DO EXISTUJÚCEHO A ZABEZPEČENIE TOKU ENERGIE, 2. VÝSTAVBA ROZVÁDZAČA POULIČNÉHO OSVETLENIA, 3. KONŠTRUKCIA KÁBLOVEJ LINKY, 4. KONŠTRUKCIA SVETELNÝCH STĹPOV, 5. MONTÁŽ SVIETIDIEL, 6. KÁBLOVÉ PRIPOJENIE, 7. VYKONANIE MERANÍ, 8. UPRATAŤ OBLASŤ. Potenciálni POUŽITIA PROJEKTU budú VŠETKY ZÁKLADNOSTI BRÃJCE COMMUNE (v roku 2015 â EUR â EUR â EUR â â â â â â â â â â â â â â â â â â â â â â â â â â â â â ¢ â EUR ¢ 6,390 OS) s zvláštnou INDICATION OF THE INHABITANTS of the Bukowiec a POTENTIAL NOVÉ ZÁKLADNOSTI SPOLUNE. (Slovak)
    27 July 2022
    0 references
    HANKKEEN SUORANA TAVOITTEENA ON RAKENTAA KATUVALAISTUSTA BUKOWCIIN ENERGIAA SÄÄSTÄVIEN JA EKOLOGISTEN LAITTEIDEN (LED STREET VALAISIMET) AVULLA. EDELLÄ MAINITUN INFRASTRUKTUURIN RAKENTAMINEN EDISTÄÄ ILMANLAADUN PARANEMISTA KUNNASSA JA KOKO ÅÃDZK:N ALUEELLA JA AUTTAA MYÖS VÄHENTÄMÄÄN JULKISEN SEKTORIN ENERGIAN KYSYNTÄÄ. HANKKEEN VÄLILLISET (ERITYISET) TAVOITTEET OVAT SEURAAVAT: VOIVODSHIPSEN AINEIDEN TUOMIOISTUIN. Ja maa, jossa he ovat VAHVISTAMINEN, – joka on PUBLIC AWARENESS. KESKIVIIKKOISIN SUOJAKSI. AIR, AIR, REDUCTION OF PERATING COSTS OF STREET LIGHTING COMPARTION to CONSTRUCTION in the TRADITIONAL SYSTEM, â EUR â EUR â EUR â â â EUR â â â â EUR â â â EURâ â â â â EUR â â â â â â â â â â â â â â â â â â EURâ â EURâ â â â â â â â â â â â â â â â â â â â â â â â EUR â EUR â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â â SUON ARKSTÄVÄÄSTÄMYKSEN TÄYDTÄMYKSEN YHTEISTÄVÄSTÄMYKSEEN, TÄYDÄÄNTTÄMÄÄN TÄMÄÄN TÄMÄÄNTÄÄN, MUNICIPALITY TUOTTEIDEN TARJOUKSEN TUOTTEIDEN TUOMIOISTUIMEN KÄYTTÖJÄRJESTELMÄN KÄYTTÖJÄRJESTELMÄN TUOMIOISTUIMEN TUOMIO. Kunnat, POLLUTANT EMISSIONS (INCLUDING CO2). SEN VARMISTAMISEKSI, ETTÄ RAKENNUSTYÖT TOTEUTETAAN ILMAN TÖRMÄYSTÄ, RAKENNUSTÖIDEN SUORITUSJÄRJESTYS ON SEURAAVA: 1. KAAPELILIITTIMET-KWALIF KUSTANNUKSET. KUNTA VALMISTAA 8 LIITINTÄ KATUVALAISTUSKAAPPEIHIN. Kuten osa SEPARATE STUDY âEUR TÄYTÄNTÖÖNPAN TÄYTÄNTÖÖNPAN KOSKEVAT KÄYTTÖJÄRJESTELMÄ SÄÄNNÖKSEN JÄLKEEN SOPIMUS SOPIMUKSEN YHTEISÖN TUOMIOISTUIMEN HYVÄKSYTTÄMÄN TUOMIOISTUIMEN TUOTTE, KOHTA OHJELMA KOSKEVAT KÄYTTÄVÄT KÄYTTÄMÄÄN TÄYTTÄNTÄÄN TRANSFORMER TIEDOT. KUNTA VASTAA AINOASTAAN KUSTANNUKSISTA, JOTKA AIHEUTUVAT KAAPELIN ASENTAMISESTA PGE-LIITTIMESTÄ KATUVALAISTUSKAAPPIIN. TÄLLAINEN KÄSITTELY ON TARPEEN KYTKEÄ SUUNNITELTU VALAISTUS OLEMASSA JA VARMISTAA ENERGIAN VIRTAUS, 2. KATUVALAISTUSKESKUKSEN RAKENTAMINEN, 3. KAAPELILINJAN RAKENTAMINEN, 4. VALOPYLVÄIDEN RAKENTAMINEN, 5. VALAISTUSVALAISIMIEN ASENNUS, 6. LANGALLINEN YHTEYS, 7. MITTAUKSET, 8. SIIVOA ALUE. Kaikki BRÃJCE-YHTEISÖN TARJOITUKSET (vuonna 2015 â EUR â EUR â EUR ON POPULATION OF 6,390 OS), jotka ovat TEKNISET TIEDOT Bukowiec ja POTENTIAL NEW RESIDENTS YHTEISÖN. (Finnish)
    27 July 2022
    0 references
    A PROJEKT KÖZVETLEN CÉLJA A BUKOWC KÖZVILÁGÍTÁS KIÉPÍTÉSE ENERGIATAKARÉKOS ÉS ÖKOLÓGIAI BERENDEZÉSEK (VEZETETT UTCAI LÁMPATESTEK) FELHASZNÁLÁSÁVAL. A FENT EMLÍTETT INFRASTRUKTÚRA KIÉPÍTÉSE HOZZÁJÁRUL AZ ÖNKORMÁNYZAT ÉS AZ EGÉSZ ÅDZK RÉGIÓ LEVEGŐMINŐSÉGÉNEK JAVÍTÁSÁHOZ, ÉS HOZZÁJÁRUL A KÖZSZFÉRA ENERGIAIGÉNYÉNEK CSÖKKENTÉSÉHEZ IS. A PROJEKT KÖZVETETT (EGYEDI) CÉLKITŰZÉSEI A KÖVETKEZŐK LESZNEK: a VOIVODSHIPS TERÜLETÉN. És az ORSZÁG, ahol az ÉLETI FELTÜNTETENDŐ KÖVETKEZŐKÉNEK JELENTKEZTETÉSÉNEK, BIZTONSÁGI PUBLIKAI HASZNÁLATI FELTÉTELEK. A SZERDÁK VÉDELMÉRE. A PARTICULAR, AIR, â EURUCTION OF OPERATING COSTS of STREET LIGHTING COMPARED to CONSTRUCRUCTION to the TRADITIONAL SYSTEM, â EUR-DeCREASE the ENERGY INTENSITY of the PUBLI SECTOR. a MUNICIPALITÁS TARTALMAZÓ BIZONYÍTVÁNYOK BIZONYÍTVÁNYA, A KÜLÖLTSÉGI FELHASZNÁLÁSI FELTÉTELEK JEGYZÉKE. Települések, POLLUTANT EMISSIONS (INCLUDING CO2) REDUCTION. ANNAK BIZTOSÍTÁSA ÉRDEKÉBEN, HOGY AZ ÉPÍTMÉNYEKET ÜTKÖZÉS NÉLKÜL VÉGEZZÉK EL, A MUNKÁLATOK KIVITELEZÉSÉNEK SORRENDJE A KÖVETKEZŐ: 1. KÁBEL CSATLAKOZÓK – KWALIF KÖLTSÉGEK. AZ ÖNKORMÁNYZAT 8 CSATLAKOZÓVAL RENDELKEZIK AZ UTCAI VILÁGÍTÁSI SZEKRÉNYEKBEN. Mint egy SEPARATE STUDY része az IMPLEMENTATION BORNE BY PGE DISTRIBUTION SA, A PGE DISTRIBUTION SA, APART A PROJEKT A COMMUNE, CONNECTORS ARE BUILT and REPLACED in TRANSFORMER STATIONS. AZ ÖNKORMÁNYZAT CSAK A KÁBEL TELEPÍTÉSÉNEK KÖLTSÉGEIT VISELI A PGE CSATLAKOZÓTÓL AZ UTCAI VILÁGÍTÁSI SZEKRÉNYEKIG. ILYEN KEZELÉS SZÜKSÉGES, HOGY CSATLAKOZTASSA A TERVEZETT VILÁGÍTÁS A MEGLÉVŐ ÉS BIZTOSÍTJA AZ ENERGIA ÁRAMLÁSÁT, 2. KÖZVILÁGÍTÁSI KAPCSOLÓTÁBLA ÉPÍTÉSE, 3. KÁBELVONAL ÉPÍTÉSE, 4. KÖNNYŰ PÓLUSOK ÉPÍTÉSE, 5. VILÁGÍTÓ LÁMPATESTEK TELEPÍTÉSE, 6. VEZETÉKES CSATLAKOZÁS, 7. MÉRÉSEKET VÉGZÜNK, 8. TAKARÍTSD FEL A KÖRNYÉKET. A PROJECT potenciális használói a Bukowiec és a POTENTIÁLIS ÚJÁK INHABITANTÁNAK ÉS POTENTIÁLIS ÚJÁNAK KÖVETELMÉNYÉNEK MŰSZAKIÁLLÍTÁSával (2015-ben 6,390 OS POPULÁCIÓK) lesznek. (Hungarian)
    27 July 2022
    0 references
    PŘÍMÝM CÍLEM PROJEKTU JE VYBUDOVAT POULIČNÍ OSVĚTLENÍ V BUKOWC S VYUŽITÍM ENERGETICKY ÚSPORNÝCH A EKOLOGICKÝCH ZAŘÍZENÍ (VEDENÁ POULIČNÍ SVÍTIDLA). VÝSTAVBA VÝŠE UVEDENÉ INFRASTRUKTURY PŘISPĚJE KE ZLEPŠENÍ KVALITY OVZDUŠÍ V OBCI A V CELÉM REGIONU ÅDZK A PŘISPĚJE TAKÉ KE SNÍŽENÍ POPTÁVKY PO ENERGII VE VEŘEJNÉM SEKTORU. NEPŘÍMÉ (SPECIFICKÉ) CÍLE PROJEKTU BUDOU: â EUR ¢ INCREASING THE AREA OF VOIVODSHIPS. A ZEMĚ, kde se blíží situace, kdy se zlepší, znamená to, že je to možné. PRO OCHRANU STŘEDY. V PARTICULAR, AIR, â EUR ¢ REDUCTION OPERATING COSTs of STREET LIGHTING COMPARED to CONSTRUCTION in the TRADITIONAL SYSTEM, â EUR ¢’Zjistit ENERGY INTENSITY PUBLI SECTOR. â EUR ¢ INCREASE SAFETY OF RESIDENTs of the MUNICIPALITY, â EUR ¢ IMPROVEMENT OF EQUIPMENT with the INFRASTRUCTURE of UTILITY PUBS. Obce, â EUR ¢ REDUCTION POLLUTANT EMISSIONS (INCLUDING CO2). ABY SE ZAJISTILO, ŽE STAVEBNÍ PRÁCE JSOU PROVÁDĚNY BEZ KOLIZE, POŘADÍ PROVEDENÍ PRACÍ JE NÁSLEDUJÍCÍ: 1. KABELOVÉ KONEKTORY-KWALIF NÁKLADY. OBEC VYRÁBÍ 8 KONEKTORŮ V POULIČNÍCH OSVĚTLOVACÍCH SKŘÍNÍ. Jako část SEPARATE STUDY â EUR COST of IMPLEMENTATION is BORNE byY PGE DISTRIBUTION SA, APART from the PROJECT of the COMMUNE, CONNECTORs ARE BUILT and REPLACEDING IN TRANSFORMER STATIONS. OBEC NESE POUZE NÁKLADY NA INSTALACI KABELU Z KONEKTORU PGE DO POULIČNÍCH OSVĚTLOVACÍCH SKŘÍNÍ. TAKOVÁ ÚPRAVA JE NEZBYTNÁ PRO ZABUDOVÁNÍ NAVRŽENÉHO OSVĚTLENÍ DO STÁVAJÍCÍCH A ZAJIŠTĚNÍ TOKU ENERGIE, 2. VÝSTAVBA ROZVADĚČE POULIČNÍHO OSVĚTLENÍ, 3. KONSTRUKCE KABELOVÉHO VEDENÍ, 4. KONSTRUKCE SVĚTELNÝCH SLOUPŮ, 5. MONTÁŽ OSVĚTLOVACÍCH SVÍTIDEL, 6. DRÁTOVÉ PŘIPOJENÍ, 7. MĚŘENÍ, 8. UKLIĎTE OBLAST. Potenciální POUŽITÍ PROJEKTU budou VŠECHNY RESIDENTY BRÃJCE COMMUNE (IN 2015 â EUR â EUR HAD A POPULATION of 6,390 OS) S ZVĚDČENÍM INHABITANTY Bukowiec a POTENTIÁLNÍ NEW RESIDENTS OF THE COMMUNE. (Czech)
    27 July 2022
    0 references
    PROJEKTA TIEŠAIS MĒRĶIS IR BŪVĒT IELU APGAISMOJUMU BUKOWC, IZMANTOJOT ENERGOTAUPĪGAS UN EKOLOĢISKAS IEKĀRTAS (LEJUŠOS IELU GAISMEKĻUS). IEPRIEKŠ MINĒTĀS INFRASTRUKTŪRAS BŪVNIECĪBA PALĪDZĒS UZLABOT GAISA KVALITĀTI PAŠVALDĪBĀ UN VISĀ ÅÃDZK REĢIONĀ, KĀ ARĪ PALĪDZĒS SAMAZINĀT PIEPRASĪJUMU PĒC ENERĢIJAS PUBLISKAJĀ SEKTORĀ. PROJEKTA NETIEŠIE (KONKRĒTIE) MĒRĶI BŪS ŠĀDI: â EUR ¢ INCREASING AREA VOIVODSHIPS. Un VALDĪBU, kur IR PĀRSKATĪŠANA, â EUR "INCREASE PUBLIC AWARENESS. TREŠDIENU AIZSARDZĪBAI. In PARTICULAR, AIR, â EUR ¢ REDUCTION of OPERATING COSTS STREET LIGHTING SALĪDZĪBU KOSTRUCIJAS TIRDZNIECĪBAS SISTĒMA, â EUR ¢ DECREASE ENERGY INTENSITY of the PUBLI SECTOR., â EUR ""INCREASE COMFORT of the RESIDENTS OF THE COMMUNE, â EUR ¢ INCREASE SAFETY RESIDENTS MUNICIPALITY, â EUR’" IMPROVEMENTU ar INFRASTRUCTURE UTILITY PUBS. Pašvaldības, POLLUTANT EMISSIONS REDUCTION (INCLUDING CO2). LAI NODROŠINĀTU, KA BŪVDARBI TIEK VEIKTI BEZ SADURSMES, BŪVDARBU IZPILDES KĀRTĪBA IR ŠĀDA: 1. KABEĻU SAVIENOTĀJI-KWALIF IZMAKSAS. PAŠVALDĪBA IZVEIDO 8 SAVIENOTĀJUS IELU APGAISMOJUMA SKAPJOS. Kā daļa no SEPARATE STUDY â EUR œ COST IMPLEMENTATION ir BORNE BY PGE DISTRIBUTION SA, kas atrodas no PROJECT of the COMMUNE, CONNECTORS ir BUILT UN REPLACED in TRANSFORMER STATIONS. PAŠVALDĪBA SEDZ TIKAI IZMAKSAS PAR KABEĻA UZSTĀDĪŠANU NO PGE SAVIENOTĀJA LĪDZ IELU APGAISMES SKAPJIEM. ŠĀDA APSTRĀDE IR NEPIECIEŠAMA, LAI PIESLĒGTU PROJEKTĒTO APGAISMOJUMU ESOŠAJĀ UN NODROŠINĀTU ENERĢIJAS PLŪSMU, 2. IELU APGAISMOJUMA SADALES SKAPJA IZBŪVE, 3. KABEĻU LĪNIJU IZBŪVE, 4. GAISMAS STABU IZBŪVE, 5. APGAISMES GAISMEKĻU UZSTĀDĪŠANA, 6. VADU SAVIENOJUMS, 7. MĒRĪJUMU VEIKŠANA, 8. SAKOPT TERITORIJU. Potenciālie izmantotāji būs visi BRÃJCE COMMUNE RESIDENTS (2015. gadā â EUR â EUR HAD POPULATION of 6,390 OS) ar īpašu INHABITANTS Bukowiec un POTENTIAL NEW RESIDENTS KOMUNE. (Latvian)
    27 July 2022
    0 references
    IS É CUSPÓIR DÍREACH AN TIONSCADAIL SOILSIÚ SRÁIDE A THÓGÁIL I BUKOWC AG BAINT ÚSÁIDE AS TREALAMH COIGILTE FUINNIMH AGUS ÉICEOLAÍOCHTA (SOILSE SRÁIDE FAOI STIÚIR). CUIRFIDH TÓGÁIL AN BHONNEAGAIR THUASLUAITE LE FEABHAS A CHUR AR CHÁILÍOCHT AN AEIR SA BHARDAS AGUS I RÉIGIÚN ÅÃDZK AR FAD, AGUS CUIRFIDH SÉ FREISIN LE HÉILEAMH NA HEARNÁLA POIBLÍ AR FHUINNEAMH A LAGHDÚ. IS IAD SEO A LEANAS CUSPÓIRÍ INDÍREACHA (SONRACHA) AN TIONSCADAIL: féach ar an Limistéar voivodships. Agus AN CHUNTHAIR AN CONDITION AIR A BHFHEIDHMIÚ, â EUR ¢ INCREASEACHT poiblí. CHUN DÉ CÉADAOIN A CHOSAINT. [EN] (b) i bPáirt, sa Chéad Sceideal a ghabhann leis an Acht um Dhíobhálacha Oibriúcháin atá faoi Láithreach chun Tiomáint sa ChÓRADH, Infheistíocht a dhéanamh ar Thionscal Oidhreachta na hÉireann., sábháilteacht Acmhainní Daonna & Athchóiriú Eagraíochtúil, lena n-áirítear feabhas a chur ar cháilíocht maidir le neamhbhreathnú na n-údarás poiblí. Bardais, â EUR ~ REDUCTION OF POLLUTANT EMISSIONS (INCLUDING CO2). D’FHONN A ÁIRITHIÚ GO NDÉANFAR OIBREACHA FOIRGNÍOCHTA GAN IMBHUALADH, IS MAR SEO A LEANAS A BHEIDH ORD CHUR I GCRÍCH NA N-OIBREACHA: 1. NASCÓIRÍ CÁBLA-KWALIF COSTAIS. DÉANANN AN BHARDAS 8 CHÓNAISC I GCAIBINÉID SOILSITHE SRÁIDE. Mar chuid de STÁIT SEPARTAS tá an cineál feidhme dá dtagraítear i bhfo-alt (1) den alt seo ar fáil ó Oifig an Chomais, ó na Coinníollacha a Bhaineann agus a Bhaineann le hIompróirí. NÍ ÍOCANN AN BHARDAS ACH AN COSTAS A BHAINEANN LEIS AN GCÁBLA A SHUITEÁIL Ó CHÓNASCAIRE PGE GO DTÍ NA CAIBINÉID SOILSITHE SRÁIDE. TÁ CÓIREÁIL DEN SÓRT SIN RIACHTANACH CHUN AN SOILSIÚ DEARTHA A PHLUGÁIL ISTEACH CHEANA FÉIN AGUS SREABHADH FUINNIMH A CHINNTIÚ, 2. TÓGÁIL LASC-CHLÁIR SOILSITHE SRÁIDE, 3. TÓGÁIL LÍNE CÁBLA, 4. TÓGÁIL CUAILLÍ SOLAIS, 5. SUITEÁIL SOILSE SOILSITHE, 6. CEANGAL SREANG, 7. TOMHAIS A THÓGÁIL, 8. SLACHTMHAR SUAS AN CEANTAR. Is iad na húdair a d’fhéadfadh a bheith ag baint leis an gCOMHPHOBAL (i 2015 & apos; POPULATION of 6,390 OS) agus NÓSÁIDEACHA OIFIGIÚLA Bukowiec agus UOTENTIAL NA gCOMHPHOBAL. (Irish)
    27 July 2022
    0 references
    NEPOSREDNI CILJ PROJEKTA JE GRADNJA ULIČNE RAZSVETLJAVE V BUKOWC Z UPORABO ENERGETSKO VARČNE IN EKOLOŠKE OPREME (ULIČNE SVETILKE). GRADNJA ZGORAJ NAVEDENE INFRASTRUKTURE BO PRISPEVALA K IZBOLJŠANJU KAKOVOSTI ZRAKA V OBČINI IN CELOTNI REGIJI ÅÃDZK TER PRISPEVALA TUDI K ZMANJŠANJU POVPRAŠEVANJA PO ENERGIJI V JAVNEM SEKTORJU. POSREDNI (POSEBNI) CILJI PROJEKTA BODO: INCREASING AREA OF VOIVODSHIPS. In država, kjer je AIR CONDITION WILL IMPROVE, â EUR ¢ INCREASE PUBLIC AWARENESS. ZA ZAŠČITO OB SREDAH. V PARTICULARJU, AIR, â EUR â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ ¢ â EUR ¢ â EUR ¢ â EUR ¢ ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR â EUR â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR ¢ â EUR â EUR ¢ ¢ â EUR ¢ ¢ â EUR â EUR â EUR â EUR â EUR â EUR â EUR ¢ â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR ¢ â EUR â EUR â EUR â EUR â EUR â EUR â EUR ¢ â EUR TMeÄ e â EUR â EUR â EUR â EUR â EUR Ä il, â EUR Ä â EUR â EUR â EUR IZVAJTE VARSTVO RESIDENTOV MUNICIPALITIJE, IMPROVEMENTA OPREMA Z INFRASTRUCTURE UTILITY PUBS. Občine, â EUR ¢ REDUCTION POLLUTANT EMISSIONS (INCLUDING CO2). ZA ZAGOTOVITEV, DA SE GRADBENA DELA IZVEDEJO BREZ TRČENJA, JE VRSTNI RED IZVEDBE OBJEKTOV NASLEDNJI: 1. KABELSKI KONEKTORJI-KWALIF STROŠKI. OBČINA NAREDI 8 KONEKTORJEV V OMARAH ZA ULIČNO RAZSVETLJAVO. Kot del SPREMENJA STUDIJA â EUR â EUR â EUR â EUR â EUR â EUR â EUR TM â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR ¢ â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR ¢ â EUR â EUR â EUR ¢ â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR â EUR OBČINA KRIJE SAMO STROŠKE NAMESTITVE KABLA OD PRIKLJUČKA PGE DO OMARE ZA ULIČNO RAZSVETLJAVO. TAKŠNA OBDELAVA JE POTREBNA ZA PRIKLJUČITEV NAČRTOVANE RAZSVETLJAVE V OBSTOJEČE IN ZAGOTAVLJANJE PRETOKA ENERGIJE, 2. GRADNJA STIKALNE PLOŠČE ZA ULIČNO RAZSVETLJAVO, 3. GRADNJA KABELSKE LINIJE, 4. GRADNJA LAHKIH DROGOV, 5. NAMESTITEV SVETILK ZA RAZSVETLJAVO, 6. ŽIČNA POVEZAVA, 7. MERITVE, 8. POČISTITE OBMOČJE. Potencialni UPORABE PROJEKTA VSEH RESIDENTOV BRÃJCE COMMUNE (v letu 2015 je POPULATION OF 6,390 OS) Z POSEBNO INDICATION OF INHABITANTS of Bukowiec and POTENTIALNE NEW RESIDENTS COMMUNE. (Slovenian)
    27 July 2022
    0 references
    ПРЯКАТА ЦЕЛ НА ПРОЕКТА Е ДА СЕ ИЗГРАДИ УЛИЧНО ОСВЕТЛЕНИЕ В BUKOWC, КАТО СЕ ИЗПОЛЗВА ЕНЕРГОСПЕСТЯВАЩО И ЕКОЛОГИЧНО ОБОРУДВАНЕ (УЛИЧНО ОСВЕТЛЕНИЕ). ИЗГРАЖДАНЕТО НА ГОРЕСПОМЕНАТАТА ИНФРАСТРУКТУРА ЩЕ ДОПРИНЕСЕ ЗА ПОДОБРЯВАНЕ НА КАЧЕСТВОТО НА ВЪЗДУХА В ОБЩИНАТА И В ЦЕЛИЯ РЕГИОН ÅÃDZK И СЪЩО ТАКА ЩЕ ДОПРИНЕСЕ ЗА НАМАЛЯВАНЕ НА ТЪРСЕНЕТО НА ЕНЕРГИЯ В ПУБЛИЧНИЯ СЕКТОР. НЕПРЕКИТЕ (СПЕЦИФИЧНИ) ЦЕЛИ НА ПРОЕКТА ЩЕ БЪДАТ: ВНИМАНИЕТО НА ВЪЗДЕЙСТВИЕТО НА ВОРУДШИИТЕ. И КАТО ВЪЗДЕЙСТВИЕТО УСЛОВИЯТА НА ВЪЗДЕЙСТВИЕТО СЪОБЩЕНО, ВНИМАНИЕ, ПУБЛИЧНО ПРАВИТЕЛСТВО. ЗА ЗАЩИТАТА НА СРЯДА. В ЧАРТИЧЕСКИ, ВЪЗЛОЖИТЕЛНО, ВЪПРОСИ ПРЕДСТАВЯНЕТО НА ОПЕРАТОРИТЕ СЪСТОЯНИЕ НА СТРОИТЕЛНОТО Осветление СЪОБЩЕНИЕТО НА ПУБЛИЧНАТА СИСТЕМА В ТРАДИЦИОНАЛНА СИСТЕМА, ОБРАБОТВАНЕ НА ПРЕДСТАВИТЕЛИТЕ НА ОБЩНОСТТА НА ОБЩИЯТА НА СЪВМЕСТНИЯТА, ИЗПОЛЗВАНЕ НА РЕЗИДЕНТИ НА МЮНИЦИАЛНОСТта, ОБРАЗОВАНИЕТО НА ОБЩЕСТВАТА СЪОБЩЕНИЕ С ИНФРАСТРУКТУРА НА УТИЛИЧНИТЕ ПУБИ. Общини, ПРЕДСТАВЯНЕ НА ПОЛЮЧНИТЕ ЕМИСИЯ (ВКЛЮЧЕН CO2). ЗА ДА СЕ ГАРАНТИРА, ЧЕ СТРОИТЕЛНИТЕ РАБОТИ СЕ ИЗВЪРШВАТ БЕЗ СБЛЪСЪК, РЕДЪТ НА ИЗПЪЛНЕНИЕ НА СТРОИТЕЛНИТЕ РАБОТИ Е СЛЕДНИЯТ: 1. КАБЕЛНИ СЪЕДИНИТЕЛИ-KWALIF РАЗХОДИ. ОБЩИНАТА ПРОИЗВЕЖДА 8 КОНЕКТОРА В ШКАФОВЕ ЗА УЛИЧНО ОСВЕТЛЕНИЕ. Като част от SEPARATE STUDY COST OF IMPLEMENTATION е BORNE BY PGE DISTRIBUTION SA, АПАРТ ОТ ПРОЕКТА НА ОБЩЕСТВАТА, КОНЕКТОРИТЕ СЪОБЩАВАТ ИЗПЪЛНИТЕЛНО В ТРАНСФОРМИЧЕСКИ СТАЦИИ. ОБЩИНАТА ПОЕМА САМО РАЗХОДИТЕ ЗА ИНСТАЛИРАНЕ НА КАБЕЛА ОТ КОНЕКТОРА PGE ДО ШКАФОВЕТЕ ЗА УЛИЧНО ОСВЕТЛЕНИЕ. ТАКОВА ТРЕТИРАНЕ Е НЕОБХОДИМО, ЗА ДА ВКЛЮЧИТЕ ПРОЕКТИРАНОТО ОСВЕТЛЕНИЕ В СЪЩЕСТВУВАЩИТЕ И ДА ОСИГУРИ ПОТОКА НА ЕНЕРГИЯ, 2. ИЗГРАЖДАНЕ НА РАЗПРЕДЕЛИТЕЛНО ТАБЛО ЗА УЛИЧНО ОСВЕТЛЕНИЕ, 3. ИЗГРАЖДАНЕ НА КАБЕЛНА ЛИНИЯ, 4. ИЗГРАЖДАНЕ НА СВЕТЛИННИ ПОЛЮСИ, 5. МОНТАЖ НА ОСВЕТИТЕЛНИ ТЕЛА, 6. КАБЕЛНА ВРЪЗКА, 7. ВЗИМАМ МЕРКИ, 8. ПОДРЕДЕТЕ РАЙОНА. Потенциалните ПОТРЕБИТЕЛИТЕ НА ПРОЕКТА ще бъдат всички РЕЗИДЕНТИ НА БРАЖДАНИЯ КОМЪН (през 2015 г. имаха резултати от 6,390 OS) със СПЕЦИАЛНА ИНДИКАЦИЯ НА ИНХАБИТАНИТЕ НА Буковеца И ПОТНИТЕЛИТЕ НОВИ РЕЗИДЕНТИ НА ОБЩНОСТТА. (Bulgarian)
    27 July 2022
    0 references
    L-OBJETTIV DIRETT TAL-PROĠETT HUWA LI JINBENA DAWL FIT-TOROQ F’UKOWC BL-UŻU TA’ TAGĦMIR EKOLOĠIKU U LI JIFFRANKA L-ENERĠIJA (LAMPI MMEXXIJA MIT-TOROQ). IL-BINI TAL-INFRASTRUTTURA MSEMMIJA HAWN FUQ SE JIKKONTRIBWIXXI GĦAT-TITJIB TAL-KWALITÀ TAL-ARJA FIL-MUNIĊIPALITÀ U FIR-REĠJUN KOLLU TA’ ÅÃDZK, U SE JIKKONTRIBWIXXI WKOLL GĦAT-TNAQQIS FID-DOMANDA GĦALL-ENERĠIJA TAS-SETTUR PUBBLIKU. L-GĦANIJIET INDIRETTI (SPEĊIFIĊI) TAL-PROĠETT SE JKUNU: EUR¢ INCREASING-QASAM TA ‘VOVODSHIPS. U l-COUNTRY BILL-KONDIZZJONI AIR IMPROVE, â EUR¢ INCREASE AWARENESS PUBBLIKA. GĦALL-PROTEZZJONI TAL-ERBGĦA. Fil PARTICULAR, AIR, â EUR¢ REDUZZJONI TA ‘KOSTSIJIET OPERATTI TAL-KOMPATI LI STREETATTIVA GĦALL-KONSRUZZJONI fis-SISTEMA TRADIZZJONALI, â EUR ¢ DECREASE L-INTENSITÀ ENERĠIJA TAL-SECTOR PUBBLIJA, â EUR¢ INCREASE L-COMFORTTI TAL-RESIDENTI TAL-KOMUNE, EURĦ INCREASE SAFETY TA ‘RIŻIDENTI TAL-MUNICIPALITY, EUR â EUR¢ IMPROVEMENT TA ‘EQUIPMENT ma’ l-INFRASTRUTTURA TA ‘PUBS UTILITÀ. Muniċipalitajiet, â EUR¢ REDUCTION TA ‘EMISSJONIJIET POLLUTANT (INCLUDING CO2). SABIEX JIĠI ŻGURAT LI X-XOGĦLIJIET TA’ KOSTRUZZJONI JITWETTQU MINGĦAJR KOLLIŻJONI, L-ORDNI TAT-TWETTIQ TAX-XOGĦLIJIET GĦANDHA TKUN KIF ĠEJ: 1. CABLE KONNETTURI-KWALIF SPEJJEŻ. IL-MUNIĊIPALITÀ TAGĦMEL 8 KONNETTURI FIL-KABINETTI TAD-DAWL TAT-TOROQ. Bħala PARTI TA ‘STUDJONI SEPARAT â EUR œL-KOST TA’ IMPLEMENTAZZJONI huwa BORNE BY DISTRIBUZZJONI GE SA, APART MILL-PROJETT TAL-KUMMUNE, KONĊETTI ARE BUILT U REPLACED fl-ISTAZZJONIJIET TRANSFORMER. IL-MUNIĊIPALITÀ ĠĠORR BISS L-ISPIŻA TAL-INSTALLAZZJONI TAL-KEJBIL MILL-KONNETTUR PGE SAL-KABINETTI TAD-DAWL TAT-TOROQ. TRATTAMENT BĦAL DAN HUWA MEĦTIEĠ BIEX ID-DAWL IDDISINJAT JIĠI PPLAGGJAT F’DAK EŻISTENTI U JIĠI ŻGURAT IL-FLUSS TAL-ENERĠIJA, 2. KOSTRUZZJONI TA ‘SWIĊĊBORD TAD-DAWL TAT-TOROQ, 3. KOSTRUZZJONI TA ‘LINJA TAL-KEJBIL, 4. KOSTRUZZJONI TA’ ARBLI TAD-DAWL, 5. INSTALLAZZJONI TA’ LAMPI TAD-DAWL, 6. KONNESSJONI TAL-WAJER, 7. IT-TEĦID TAL-KEJL, 8. IMBOTTA ‘L FUQ IŻ-ŻONA. L-USERS potenzjali tal-PROJECT se jkunu r-RESIDENTI KOLLHA TAL-KUMMUNE (IN 2015 â EUR HAD A POPULAZZJONI ta’ 6,390 OS) Ma’ INDIKAZZJONI SPEĊJALI TA’ INHABITANTS TA’ Bukowiec u POTENTITI EW RESIDENTI TAL-KUMMUNTI. (Maltese)
    27 July 2022
    0 references
    O OBJETIVO DIRETO DO PROJETO É CONSTRUIR ILUMINAÇÃO PÚBLICA EM BUKOWC USANDO EQUIPAMENTOS ECOLÓGICOS E ECONOMIZADORES DE ENERGIA (LUMINÁRIAS DE RUA CONDUZIDAS). A CONSTRUÇÃO DA INFRAESTRUTURA ACIMA REFERIDA CONTRIBUIRÁ PARA A MELHORIA DA QUALIDADE DO AR NO MUNICÍPIO E EM TODA A REGIÃO DE ÅÃDZK E CONTRIBUIRÁ TAMBÉM PARA A REDUÇÃO DA PROCURA DE ENERGIA DO SETOR PÚBLICO. OS OBJETIVOS INDIRETOS (ESPECÍFICOS) DO PROJETO SERÃO: INCREAS A ÁREA DE VOIVODSHIPS. E o PAÍ, onde a CONDIÇÃO Aéreo irá melhorar, INCREZAR A WARENESS PÚBLICA. PARA A PROTEÇÃO DAS QUARTAS-FEIRAS. Em PARTICULAR, AIR, "EUR¢ REDUCTION OF OPERATING COSTS OF STREET LIGHTING COMPARÁRIO NA CONSTRUÇÃO NO SISTEMA TRADICIONAL, DECRECER A INTENSIDADE ENERGIA DO SETOR PUBLI., âEUR¢ INCRECE A CONFORTAÇÃO DOS RESIDENTES DO COMUNO, aumentar a segurança dos RESIDENTES DOS RESIDENTES DA MUNICIPALIDADE, PROGRAMA DE EQUIPAMENTOS COM A INFRASTRUCTURA DE PUBOS DE UTILIDADE. Municípios, REDUÇÃO DE EMISSÕES POLLUTANTES (INCLUDANTE CO2). A FIM DE ASSEGURAR QUE AS OBRAS DE CONSTRUÇÃO SÃO REALIZADAS SEM COLISÃO, A ORDEM DE EXECUÇÃO DAS OBRAS É A SEGUINTE: 1. CONECTORES DE CABO-CUSTOS KWALIF. O CONCELHO FAZ 8 CONECTORES EM CACIFOS DE ILUMINAÇÃO PÚBLICA. Como PARTE DE UM ESTUDO SEPARATÓRIO â EUR O CUSTO DE IMPLEMENTAÇÃO É BORNE PY PGE DISTRIBUTION SA, APARTE DO PROJETO DO COMUNO, CONNECTORES SÃO BUITO E REPLACADOS EM ESTAÇÕES TRANSFORMADOS. O CONCELHO SUPORTA APENAS O CUSTO DA INSTALAÇÃO DO CABO DO CONECTOR PGE PARA OS CACIFOS DE ILUMINAÇÃO PÚBLICA. TAL TRATAMENTO É NECESSÁRIO PARA LIGAR A ILUMINAÇÃO PROJETADA À EXISTENTE E GARANTIR O FLUXO DE ENERGIA, 2. CONSTRUÇÃO DE UM QUADRO DE ILUMINAÇÃO PÚBLICA, 3. CONSTRUÇÃO DA LINHA DE CABO, 4. CONSTRUÇÃO DE POSTES DE LUZ, 5. INSTALAÇÃO DE LUMINÁRIAS DE ILUMINAÇÃO, 6. CONEXÃO DE FIO, 7. REALIZAÇÃO DE MEDIÇÕES, 8. ARRUMA A ÁREA. Potenciais UTILIZADORES DO PROJETO SERão TODOS OS RESIDENTES DE BRÃJCE COMUNE (em 2015 âEUR POPULAÇÃO DE 6,390 OS) COM UM INDICAÇÃO ESPECIAL DOS INHABITANTES DE Bukowiec E NOVOS RESIDENTES POTENTIAIS DO COMUNO. (Portuguese)
    27 July 2022
    0 references
    DET DIREKTE MÅL MED PROJEKTET ER AT BYGGE GADEBELYSNING I BUKOWC VED HJÆLP AF ENERGIBESPARENDE OG ØKOLOGISK UDSTYR (LEDEDE GADEARMATURER). OPFØRELSEN AF OVENNÆVNTE INFRASTRUKTUR VIL BIDRAGE TIL AT FORBEDRE LUFTKVALITETEN I KOMMUNEN OG HELE ÅÃDZK-REGIONEN OG VIL OGSÅ BIDRAGE TIL AT MINDSKE DEN OFFENTLIGE SEKTORS ENERGIEFTERSPØRGSEL. PROJEKTETS INDIREKTE (SPECIFIKKE) MÅL ER: â EUR ¢ INDTAGNING AF VOIVODSHIPS. Og LAND, HVORFOR DEN AIR CONDITION vil gøre det muligt, ¢ UCREASE PUBLIC AWARENESS. TIL BESKYTTELSE AF ONSDAGE. I PARTIKULAR, AIR, â EUR ¢ REDUCTION OF OPERATING COSTS OF STREET LIGHTING KOMPARTER TIL KONSTRUKTION I HANDELSYSTEMEN, â EUR ¢ UNDERSTREGER KOMFORT TIL KOMMISSIONENS RESIDENTER AF KOMMUNIEN, â EUR ¢ UCREASE SAFETY OF RESIDENTS OF THE MUNICIPALITY, â EUR ¢ Forretning af EQUIPMENT MED INFRASTRUCTURE af UTILITY PUBS. Kommuner, â EUR ¢ REDUCTION AF POLLUTANT EMISSIONER (INCLUDING CO2). FOR AT SIKRE, AT BYGVÆRKER UDFØRES UDEN KOLLISION, SKAL RÆKKEFØLGEN FOR UDFØRELSEN AF ARBEJDET VÆRE SOM FØLGER: 1. KABELSTIK-KWALIF OMKOSTNINGER. KOMMUNEN LAVER 8 STIK I GADEBELYSNINGSSKABE. Som del af en SEPARATE STUDY â EUR THE COST of IMPLEMENTATION er BORNE af PGE DISTRIBUTION SA, APART FRA PROJEKT AF KOMMUNIEN, KONNECTORER er BUILT OG REPLACED I TRANSFORMER STATIONS. KOMMUNEN AFHOLDER KUN UDGIFTERNE TIL INSTALLATION AF KABLET FRA PGE-STIKKET TIL GADEBELYSNINGSSKABENE. EN SÅDAN BEHANDLING ER NØDVENDIG FOR AT TILSLUTTE DEN DESIGNEDE BELYSNING I EKSISTERENDE OG SIKRE STRØMMEN AF ENERGI, 2. OPFØRELSE AF EN GADEBELYSNINGSTAVLE, 3. KABELLEDNING KONSTRUKTION, 4. KONSTRUKTION AF LYSSTÆNGER, 5. INSTALLATION AF BELYSNINGSARMATURER, 6. LEDNINGSFORBINDELSE, 7. UDTAGELSE AF MÅLINGER, 8. RYDDE OP I OMRÅDET. Potentielle brugere af PROJEKT vil være alle RESIDENTER af BRÃJCE COMMUNE (i 2015 â EUR har en POPULATION af 6.390 OS) med en særlig INDIKATION AF INHABITANTER af Bukowiec og POTENTIAL NEW RESIDENTS AF KOMMUNIEN. (Danish)
    27 July 2022
    0 references
    OBIECTIVUL DIRECT AL PROIECTULUI ESTE DE A CONSTRUI ILUMINATUL STRADAL ÎN BUKOWC FOLOSIND ECHIPAMENTE DE ECONOMISIRE A ENERGIEI ȘI ECOLOGICE (CORPURI DE ILUMINAT STRADALE CONDUSE). CONSTRUCȚIA INFRASTRUCTURII MENȚIONATE ANTERIOR VA CONTRIBUI LA ÎMBUNĂTĂȚIREA CALITĂȚII AERULUI ÎN MUNICIPALITATE ȘI ÎN ÎNTREAGA REGIUNE ÅÓDZK ȘI VA CONTRIBUI, DE ASEMENEA, LA REDUCEREA CERERII DE ENERGIE DIN SECTORUL PUBLIC. OBIECTIVELE INDIRECTE (SPECIFICE) ALE PROIECTULUI VOR FI: â EUR ¢ INCREAZARE AREA de VOIVODHIPS. Și țara în care se va îmbunătăti osteneala sa-i îmbunătăteasca. PENTRU PROTECȚIA MIERCURII. În PARTICULAR, AIR, REDUCȚIA COSTURILOR DE OPERATARE DE STREET LIGHTING COMPAREDATE CONSTRUCȚIE ÎN SISTEMUL TRADIȚIONAL, â EUR ¢ DECREAZĂ INTENSITATEA ENERGIEI SECTORULUI PUBLI., â EUR¢ INCREAT COMFORTELE COMUNII, â EUR ¢ INCREAZĂ SAFETY DE REZIDENȚII MUNICIPALITATE, Îmbunătățirea calității cu INFRASTRUCTURA PUBURILOR UTILITATE. Municipalități, REDUCTION OF POLLUTANT EMISSIONS (INCLUDING CO2). PENTRU A SE ASIGURA CĂ LUCRĂRILE DE CONSTRUCȚIE SUNT EFECTUATE FĂRĂ COLIZIUNE, ORDINEA DE EXECUȚIE A LUCRĂRILOR TREBUIE SĂ FIE DUPĂ CUM URMEAZĂ: 1. CONECTORI DE CABLU-KWALIF COSTURI. MUNICIPALITATEA FACE 8 CONECTORI ÎN DULAPURILE DE ILUMINAT STRADAL. Ca parte a unei STUDII SEPARATE â EUR "COSTUL DE IMPLEMENTARE ESTE BORNE BY PGE DISTRIBUTION SA, APARTEA DIN PROIECTUL COMUNEI, CONNECTORILOR ESTE BUILT ȘI REPLACAT ÎN STATELE TRANSFORMERULUI. MUNICIPALITATEA SUPORTĂ DOAR COSTUL INSTALĂRII CABLULUI DE LA CONECTORUL PGE LA DULAPURILE DE ILUMINAT STRADAL. UN ASTFEL DE TRATAMENT ESTE NECESAR PENTRU A CONECTA ILUMINATUL PROIECTAT LA CELE EXISTENTE ȘI PENTRU A ASIGURA FLUXUL DE ENERGIE, 2. CONSTRUCȚIA UNUI PANOU DE ILUMINAT STRADAL, 3. CONSTRUCȚIA LINIEI DE CABLU, 4. CONSTRUCȚIA STÂLPILOR DE LUMINĂ, 5. INSTALAREA CORPURILOR DE ILUMINAT, 6. CONEXIUNE PRIN CABLU, 7. LUÂND MĂSURĂTORI, 8. ARANJAȚI ZONA. Potențialii UTILIZATORI ai PROIECTULUI vor fi toți rezidenții COMUNII BRĂJCE (în 2015 au o POPULARE de 6,390 OS) cu o INDICARE SPECIALĂ a INHABITANȚILOR Bukowiec ȘI NOU REZIDENȚII POTENTIALE ale COMUNII. (Romanian)
    27 July 2022
    0 references
    PROJEKTETS DIREKTA MÅL ÄR ATT BYGGA GATUBELYSNING I BUKOWC MED HJÄLP AV ENERGIBESPARANDE OCH EKOLOGISK UTRUSTNING (LEDDA GATUARMATURER). BYGGANDET AV OVANNÄMNDA INFRASTRUKTUR KOMMER ATT BIDRA TILL ATT FÖRBÄTTRA LUFTKVALITETEN I KOMMUNEN OCH HELA ÅÃDZK-REGIONEN OCH KOMMER OCKSÅ ATT BIDRA TILL ATT MINSKA DEN OFFENTLIGA SEKTORNS ENERGIEFTERFRÅGAN. PROJEKTETS INDIREKTA (SÄRSKILDA) MÅL KOMMER ATT VARA FÖLJANDE: â EUR ¢ INCREASING the AREA of VOIVODSHIPS. Och COUNTRY där AIRCONDITIONEN kommer att vara iMPROVE, â EUR ¢ INCREASE PUBLIC AWARENESS. FÖR ATT SKYDDA ONSDAGAR. I PARTICULAR, AIR, REDUCTION of OPERATING COSTS OF STREET LIGHTING COMPARED to CONSTRUCTION IN THE TRADITIONAL SYSTEM, ¢ ÖVER ENERGY INTENSITET AV PUBLISKA SECTOREN, â EUR ¢ ÖVERSÄTTNING AV KOMFORTET AV GEMENSAMHET, ¢ ÖVERSÄTTNING AV RESIDENTS AV MUNICIPALITET, IMPROVEMENT OF EQUIPMENT MED INFRASTRUCTURE of UTILITY PUBS. Kommuner, ¢ REDUCTION of POLLUTANT EMISSIONS (INCLUDING CO2). FÖR ATT SÄKERSTÄLLA ATT BYGG- OCH ANLÄGGNINGSARBETEN UTFÖRS UTAN KOLLISION SKA FÖLJANDE ORDNINGSFÖLJD FÖR ARBETETS UTFÖRANDE VARA: 1. KABELANSLUTNINGAR-KWALIF KOSTNADER. KOMMUNEN TILLVERKAR 8 KONTAKTER I GATUBELYSNINGSSKÅP. Som en del av en SEPARATE STUDY â EUR EUROST of ImpLEMENTATION ÄR BORNE BY PGE DISTRIBUTION SA, APART FRÅN PROJEKT AV COMMUNE, CONNECTORS ARE BUILT OCH REPLACED I TRANSFORMER STATIONS. KOMMUNEN BÄR ENDAST KOSTNADEN FÖR ATT INSTALLERA KABELN FRÅN PGE-KONTAKTEN TILL GATUBELYSNINGSSKÅPEN. EN SÅDAN BEHANDLING ÄR NÖDVÄNDIG FÖR ATT KOPPLA IN DEN KONSTRUERADE BELYSNINGEN I BEFINTLIGA OCH SÄKERSTÄLLA ENERGIFLÖDET, 2. KONSTRUKTION AV EN GATUBELYSNING VÄXEL, 3. KABELLEDNING KONSTRUKTION, 4. KONSTRUKTION AV LJUSSTOLPAR, 5. INSTALLATION AV BELYSNINGSARMATURER, 6. TRÅDANSLUTNING, 7. MÄTNING, 8. STÄDA UPP OMRÅDET. Potentiella användare av PROJEKT kommer att bli alla RESIDENTS AV BRÃJCE COMMUNE (IN 2015 HAD A POPULATION of 6 390 OS) med en särskild INDICATION AV INHABITANTS OF Bukowiec och POTENTIAL NYA RESIDENTS AV COMMUNE. (Swedish)
    27 July 2022
    0 references
    WOJ.: ŁÓDZKIE, POW.: łódzki wschodni
    0 references

    Identifiers

    RPLD.04.03.01-10-0002/17