Performance of geothermal wells in Stargard — stage II (Q4416211): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Changed label, description and/or aliases in en, and other parts)
label / enlabel / en
 
Performance of geothermal wells in Stargard — stage II
Property / summary
 
The substantive scope of the project provides: 1. Drilling of the directional operating hole “Stargard GT-8” to a depth of approx. 2 800 m (measured vertically), allowing the abstraction of thermal water in the amount of 200-250 m³/h at a temperature of approx. 90 OC. 2. Drilling of the directional injection hole “Stargard GT-9” to a depth of approx. 2 800 m, capable of injecting thermal water in the amount of 200-250 m³/h at a temperature of approx. 40 OC. 3. Laying down the required technological connections on parcels Nos 34, 4/28 and 4/102 owned by the applicant: — discharge pipelines of geothermal water, — power cables, medium and low voltage (0.4 and 15 kV), — telecommunication fiber optic, 4. Execution of works related to the installation of two heat pumps (planned — one absorbent pump and one compressor pump) with a total power of approx. 20 MW. 5. Functional combination of heat pumps with existing geothermal technological system. 6. Construction of heat pumps through the creation of a new building in the area of Dz. no. 34, owned by the investor. (English)
Property / summary: The substantive scope of the project provides: 1. Drilling of the directional operating hole “Stargard GT-8” to a depth of approx. 2 800 m (measured vertically), allowing the abstraction of thermal water in the amount of 200-250 m³/h at a temperature of approx. 90 OC. 2. Drilling of the directional injection hole “Stargard GT-9” to a depth of approx. 2 800 m, capable of injecting thermal water in the amount of 200-250 m³/h at a temperature of approx. 40 OC. 3. Laying down the required technological connections on parcels Nos 34, 4/28 and 4/102 owned by the applicant: — discharge pipelines of geothermal water, — power cables, medium and low voltage (0.4 and 15 kV), — telecommunication fiber optic, 4. Execution of works related to the installation of two heat pumps (planned — one absorbent pump and one compressor pump) with a total power of approx. 20 MW. 5. Functional combination of heat pumps with existing geothermal technological system. 6. Construction of heat pumps through the creation of a new building in the area of Dz. no. 34, owned by the investor. (English) / rank
 
Normal rank
Property / summary: The substantive scope of the project provides: 1. Drilling of the directional operating hole “Stargard GT-8” to a depth of approx. 2 800 m (measured vertically), allowing the abstraction of thermal water in the amount of 200-250 m³/h at a temperature of approx. 90 OC. 2. Drilling of the directional injection hole “Stargard GT-9” to a depth of approx. 2 800 m, capable of injecting thermal water in the amount of 200-250 m³/h at a temperature of approx. 40 OC. 3. Laying down the required technological connections on parcels Nos 34, 4/28 and 4/102 owned by the applicant: — discharge pipelines of geothermal water, — power cables, medium and low voltage (0.4 and 15 kV), — telecommunication fiber optic, 4. Execution of works related to the installation of two heat pumps (planned — one absorbent pump and one compressor pump) with a total power of approx. 20 MW. 5. Functional combination of heat pumps with existing geothermal technological system. 6. Construction of heat pumps through the creation of a new building in the area of Dz. no. 34, owned by the investor. (English) / qualifier
 
point in time: 21 October 2022
Timestamp+2022-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:35, 21 October 2022

Project Q4416211 in Poland
Language Label Description Also known as
English
Performance of geothermal wells in Stargard — stage II
Project Q4416211 in Poland

    Statements

    0 references
    31,740,000.0 zloty
    0 references
    7,055,802.0 Euro
    0 references
    60,900,000.0 zloty
    0 references
    13,538,070.0 Euro
    0 references
    52.12 percent
    0 references
    1 January 2021
    0 references
    30 June 2023
    0 references
    "G-TERM ENERGY" SPÓŁKA Z OGRANICZONA ODPOWIEDZIALNOSCIA
    0 references
    0 references
    0 references
    Zakres rzeczowy projektu przewiduje: 1. Odwiercenie kierunkowego otworu eksploatacyjnego „Stargard GT-8” do głębokości ok. 2800 m (mierzonej w pionie), umożliwiającego pobór wody termalnej w ilości 200-250 m3/h o temperaturze ok. 90 OC. 2. Odwiercenie kierunkowego otworu zatłaczającego „Stargard GT-9” do głębokości ok. 2800 m, umożliwiającego zatłaczanie wody termalnej w ilości 200-250 m3/h o temperaturze ok. 40 OC. 3. Ułożenie wymaganych połączeń technologicznych na działkach o numerze 34, 4/28 oraz 4/102 będących własnością wnioskodawcy: - rurociągów tłocznych wody geotermalnej, - kabli energetycznych, średniego i niskiego napięcia (0,4 i 15 kV), - światłowodów telekomunikacyjnych, 4. Wykonanie prac związanych z instalacją dwóch pomp ciepła (planowane – jedna pompa absorbcyjna i jedna pompa sprężarkowa) o łącznej mocy ok. 20 MW. 5. Funkcjonalne połączenie pomp ciepła z istniejącym układem technologicznym geotermii. 6. Zabudowa pomp ciepła poprzez powstanie nowego budynku na terenie dz. nr 34, będącej własnością inwestora. (Polish)
    0 references
    The substantive scope of the project provides: 1. Drilling of the directional operating hole “Stargard GT-8” to a depth of approx. 2 800 m (measured vertically), allowing the abstraction of thermal water in the amount of 200-250 m³/h at a temperature of approx. 90 OC. 2. Drilling of the directional injection hole “Stargard GT-9” to a depth of approx. 2 800 m, capable of injecting thermal water in the amount of 200-250 m³/h at a temperature of approx. 40 OC. 3. Laying down the required technological connections on parcels Nos 34, 4/28 and 4/102 owned by the applicant: — discharge pipelines of geothermal water, — power cables, medium and low voltage (0.4 and 15 kV), — telecommunication fiber optic, 4. Execution of works related to the installation of two heat pumps (planned — one absorbent pump and one compressor pump) with a total power of approx. 20 MW. 5. Functional combination of heat pumps with existing geothermal technological system. 6. Construction of heat pumps through the creation of a new building in the area of Dz. no. 34, owned by the investor. (English)
    21 October 2022
    0 references
    WOJ.: ZACHODNIOPOMORSKIE, POW.: stargardzki
    0 references

    Identifiers

    POIS.01.01.01-00-0019/19
    0 references