Construction of a solar power plant with a total electrical capacity of up to 2 MW in Milejczyce (Q4416058): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Changed label, description and/or aliases in en, and other parts)
label / enlabel / en
 
Construction of a solar power plant with a total electrical capacity of up to 2 MW in Milejczyce
Property / summary
 
This project assumes the construction of a photovoltaic power plant on the ground in Milejczyce. The project corresponds to the type of operation specified in the Competition Rules, i.e. Investments in the construction of new or increased capacity of units generating electricity and heat from RES (biomass, biogas, wind, solar, water and Earth) together with connection to the distribution/transmission network. The subject of the investment is the construction of a solar power plant with a total electricity capacity of up to 2 MW producing electricity for sale to the distribution network on plots with geod number. 1142/8, 1142/10, 1142/13, district 201006_2.0010 Milejczyce, municipality Milejczyce, Siemiatycki district, Podlaskie Voivodeship. The power plant consists of solar cells placed on photovoltaic tables deposited directly on the ground at an appropriate angle relative to the solar radiation. Photovoltaic tables will be a supportive contrusion for photovoltaic modules and will consist of a metal frame, horizontal and vertical load-bearing profiles and connecting elements. They will be connected to the transformer station by means of inverters — devices enabling the conversion of DC electricity generated by photovoltaic modules into AC electricity. Detailed technical solutions are presented in the Business Plan and in the technical documentation. Designed PV installations are characterised by appropriate power and instrumentation in this type of investment. The main effect of the project will be the production of electricity from renewable energy sources (RES), entirely intended for sale. The project implementation period is 01.2022-10.2022 (the actual implementation period is: 05.2022-10.2022). (English)
Property / summary: This project assumes the construction of a photovoltaic power plant on the ground in Milejczyce. The project corresponds to the type of operation specified in the Competition Rules, i.e. Investments in the construction of new or increased capacity of units generating electricity and heat from RES (biomass, biogas, wind, solar, water and Earth) together with connection to the distribution/transmission network. The subject of the investment is the construction of a solar power plant with a total electricity capacity of up to 2 MW producing electricity for sale to the distribution network on plots with geod number. 1142/8, 1142/10, 1142/13, district 201006_2.0010 Milejczyce, municipality Milejczyce, Siemiatycki district, Podlaskie Voivodeship. The power plant consists of solar cells placed on photovoltaic tables deposited directly on the ground at an appropriate angle relative to the solar radiation. Photovoltaic tables will be a supportive contrusion for photovoltaic modules and will consist of a metal frame, horizontal and vertical load-bearing profiles and connecting elements. They will be connected to the transformer station by means of inverters — devices enabling the conversion of DC electricity generated by photovoltaic modules into AC electricity. Detailed technical solutions are presented in the Business Plan and in the technical documentation. Designed PV installations are characterised by appropriate power and instrumentation in this type of investment. The main effect of the project will be the production of electricity from renewable energy sources (RES), entirely intended for sale. The project implementation period is 01.2022-10.2022 (the actual implementation period is: 05.2022-10.2022). (English) / rank
 
Normal rank
Property / summary: This project assumes the construction of a photovoltaic power plant on the ground in Milejczyce. The project corresponds to the type of operation specified in the Competition Rules, i.e. Investments in the construction of new or increased capacity of units generating electricity and heat from RES (biomass, biogas, wind, solar, water and Earth) together with connection to the distribution/transmission network. The subject of the investment is the construction of a solar power plant with a total electricity capacity of up to 2 MW producing electricity for sale to the distribution network on plots with geod number. 1142/8, 1142/10, 1142/13, district 201006_2.0010 Milejczyce, municipality Milejczyce, Siemiatycki district, Podlaskie Voivodeship. The power plant consists of solar cells placed on photovoltaic tables deposited directly on the ground at an appropriate angle relative to the solar radiation. Photovoltaic tables will be a supportive contrusion for photovoltaic modules and will consist of a metal frame, horizontal and vertical load-bearing profiles and connecting elements. They will be connected to the transformer station by means of inverters — devices enabling the conversion of DC electricity generated by photovoltaic modules into AC electricity. Detailed technical solutions are presented in the Business Plan and in the technical documentation. Designed PV installations are characterised by appropriate power and instrumentation in this type of investment. The main effect of the project will be the production of electricity from renewable energy sources (RES), entirely intended for sale. The project implementation period is 01.2022-10.2022 (the actual implementation period is: 05.2022-10.2022). (English) / qualifier
 
point in time: 21 October 2022
Timestamp+2022-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:04, 21 October 2022

Project Q4416058 in Poland
Language Label Description Also known as
English
Construction of a solar power plant with a total electrical capacity of up to 2 MW in Milejczyce
Project Q4416058 in Poland

    Statements

    0 references
    5,834,783.35 zloty
    0 references
    1,297,072.34 Euro
    0 references
    8,974,799.0 zloty
    0 references
    1,995,097.82 Euro
    0 references
    65.01 percent
    0 references
    8 March 2022
    0 references
    31 October 2022
    0 references
    KARAD SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    W ramach niniejszego projektu zakłada się budowę elektrowni fotowoltaicznej na gruncie w miejscowości Milejczyce. Projekt odpowiada typowi operacji określonemu w Regulaminie konkursu, tj. Inwestycje z zakresu budowy nowych lub zwiększenia mocy jednostek wytwarzania energii elektrycznej i ciepła z OZE (biomasy, biogazu, energii wiatru, słońca, wody oraz Ziemi) wraz z podłączeniem do sieci dystrybucyjnej/przesyłowej. Przedmiotem inwestycji jest budowa elektrowni słonecznej o łącznej mocy elektrycznej do 2 MW produkującej energię elektryczną na sprzedaż do sieci dystrybucyjnej na działkach o nr geod. 1142/8, 1142/10, 1142/13, obręb 201006_2.0010 Milejczyce, gmina Milejczyce, powiat siemiatycki, województwo podlaskie. Elektrownia składa się z ogniw słonecznych umieszczanych na stołach fotowoltaicznych osadzanych bezpośrednio na gruncie pod odpowiednim kątem w stosunku do promieniowania słonecznego. Stoły fotowoltaiczne będą stanowić kontrukcję wsporczą dla modułów fotowoltaicznych i składać się będą z metalowej ramy, poziomych i pionowych profili nośnych oraz elementów łączących. Połączone one będą ze stacją transformatorową za pomocą inwerterów – urządzeń umożliwiających przetwarzanie energii elektrycznej DC wytwaorzonej przez moduły fotowoltaiczne na energię elektryczną AC. Szczegółowe rozwiazania techniczne przedstawiono w Biznes planie oraz w dokumentacji technicznej. Zaprojektowane instalacje PV charakteryzują się odpowiednią mocą oraz oprzyrządowaniem w tego typu inwestycjach. Głownym efektem realizacji przedsięwzięcia będzie produkcja energii elektrycznej, pochodzącej z odnawialnych źródeł energii (OZE), w całości przeznaczona na sprzedaż. Okres realizacji projektu to 01.2022 - 10.2022 (okres rzeczowej realizacji to: 05.2022 - 10.2022). (Polish)
    0 references
    This project assumes the construction of a photovoltaic power plant on the ground in Milejczyce. The project corresponds to the type of operation specified in the Competition Rules, i.e. Investments in the construction of new or increased capacity of units generating electricity and heat from RES (biomass, biogas, wind, solar, water and Earth) together with connection to the distribution/transmission network. The subject of the investment is the construction of a solar power plant with a total electricity capacity of up to 2 MW producing electricity for sale to the distribution network on plots with geod number. 1142/8, 1142/10, 1142/13, district 201006_2.0010 Milejczyce, municipality Milejczyce, Siemiatycki district, Podlaskie Voivodeship. The power plant consists of solar cells placed on photovoltaic tables deposited directly on the ground at an appropriate angle relative to the solar radiation. Photovoltaic tables will be a supportive contrusion for photovoltaic modules and will consist of a metal frame, horizontal and vertical load-bearing profiles and connecting elements. They will be connected to the transformer station by means of inverters — devices enabling the conversion of DC electricity generated by photovoltaic modules into AC electricity. Detailed technical solutions are presented in the Business Plan and in the technical documentation. Designed PV installations are characterised by appropriate power and instrumentation in this type of investment. The main effect of the project will be the production of electricity from renewable energy sources (RES), entirely intended for sale. The project implementation period is 01.2022-10.2022 (the actual implementation period is: 05.2022-10.2022). (English)
    21 October 2022
    0 references
    WOJ.: PODLASKIE, POW.: siemiatycki
    0 references

    Identifiers

    RPPD.11.01.00-20-0015/21
    0 references