PD SERVICE SRL (Q2074825): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 01:27, 9 June 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
PD SERVICE SRL
Project in Italy financed by DG Regio

    Statements

    0 references
    75,000.0 Euro
    0 references
    150,000.0 Euro
    0 references
    50.0 percent
    0 references
    8 June 2018
    0 references
    11 July 2019
    0 references
    14 December 2018
    0 references
    P.D. SERVICE SRL
    0 references
    0 references
    0 references

    45°37'43.21"N, 11°26'35.34"E
    0 references
    PER UN RISPARMIO DI APPROVIGIONAMENTO DI ENERGIA ELETTRICA SI INSTALLERA' UN IMPIANTO DI COGENERAZIONE A GAS METANO, CHE SODDISFA IL 100% DEI FABBISOGNI ELETTRICI DI PD SERVICE E DI GASER, CUI PD SERVICE HA AFFITTATO L - IMMOBILE E TUTTI I MACCHINARI PER I TRATTAMENTI GALVANICI, CHE COSTITUISCONO L - ATTIVITA' DELLA GASER. IL CONTRATTO DI AFFITTO PREVEDE IL SODDISFACIMENTO DI TUTTI I FABBISOGNI ENERGETICI DELLA GASER COME SERVIZIO. A GASER VENGONO FORNITI ENERGIA ELETTRICA E METANO PER LE CALDAIE AD ACQUA CALDA SURRISCALDATA; CON IL COGENERATORE LA PD SERVICE FORNIRA' DIRETTAMENTE ACQUA SURRISCALDATA. IL COGENERATORE PRODUCE 467 KW ELETTRICI NETTI, 480 KW TERMICI COME ACQUA CALDA SURRISCALDATA E CONSUMA 1.442 KW TERMICI. VERRA' INOLTRE COSTRUITO UN NUOVO FORNO INNOVATIVO PER LA TEFLONATURA A CALDO DELLA PD SERVICE, INSTALLANDO SUI FUMI DI SCARICO 4 RECUPERATORI FUMI/ARIA E INTEGRANDO NELLO STESSO, ULTERIORI 8 RECUPERI DI CALORE DA 2 DEI FORNI GIA' ESISTENTI. (Italian)
    0 references
    FOR SAVINGS IN ELECTRICITY SUPPLY SAVINGS, A METHANE GAS COGENERATION PLANT SHALL MEET 100 % OF THE ELECTRICITY NEEDS OF PD SERVICE AND GAVER, WHICH PD SERVICE HAS LEASED THE BUILDING AND ALL THE GALVANIC TREATMENT MACHINERY, WHICH ARE THE ACTIVITIES OF THE GAER. THE LEASE CONTRACT PROVIDES FOR THE FULFILMENT OF ALL GASSER ENERGY NEEDS AS A SERVICE. GASSER IS SUPPLIED WITH ELECTRICITY AND METHANE FOR SUPER-HEATED HOT-WATER BOILERS; UNDER THE COGENERATOR, THE PD SERVICE WILL DIRECTLY SUPPLY SUPER-HEATED WATER. THE CHP PRODUCES 467 KW NET POWER, 480 KW HEATING AS SUPERHEATED HOT WATER AND CONSUMES 1.442 KW HEAT. IN ADDITION, A NEW INNOVATIVE KILN FOR TEFLONDON PD SERVICE, INSTALLING THE 4 EXHAUST/AIR FLUE GAS RECOVERY FURNACE AND INTEGRATING IN THE SAME, AN ADDITIONAL 8 HEAT RECOVERY FROM EXISTING FURNACES IN 2. (English)
    0 references

    Identifiers

    B77B18000120009
    0 references