(‎Created claim: summary (P836): ACTION 1: A CONDENSING BOILER INSTALLATION THE ENERGY UPGRADING INTERVENTION OF THE OFFICE OF ‘ASTRA DI ESTRA’) IN ASTRA SPA PROVIDES FOR THE COMPLETE REFURBISHMENT OF THE THERMAL POWER STATION THAT CAN BE ACHIEVED BY FULL REPLACEMENT OF THE CENTRAL COMPONENTS. THE CURRENT GENERATOR 3900-350 (UPGRADE TO THE FIREPLACE OF A POWER OF 449 KW, A USEFUL FUNCTION OF 405 KW), FUELLED BY METHANE, PRODUCES THERMAL ENERGY FOR THE HEATING OF THE SEAT AND DO...)
Property / summary
 
ACTION 1: A CONDENSING BOILER INSTALLATION THE ENERGY UPGRADING INTERVENTION OF THE OFFICE OF ‘ASTRA DI ESTRA’) IN ASTRA SPA PROVIDES FOR THE COMPLETE REFURBISHMENT OF THE THERMAL POWER STATION THAT CAN BE ACHIEVED BY FULL REPLACEMENT OF THE CENTRAL COMPONENTS. THE CURRENT GENERATOR 3900-350 (UPGRADE TO THE FIREPLACE OF A POWER OF 449 KW, A USEFUL FUNCTION OF 405 KW), FUELLED BY METHANE, PRODUCES THERMAL ENERGY FOR THE HEATING OF THE SEAT AND DOMESTIC HOT WATER. INTERVENTION 1 PROVIDES FOR THE REPLACEMENT OF THE GENERATOR BY MEANS OF A CONDENSATION (ENHANCED FUNCTION ON THE FIRE SERVICE OF 349 KW), A USEFUL FUNCTION OF 344.1 KW, WHICH HAS ALWAYS BEEN FUELLED BY METHANE. THE NEW GENERATOR WILL PRODUCE HEAT USED FOR THE HEATING OF THE SEAT, ALLOWING SAVINGS IN PRIMARY ENERGY TERMS THAT CAN BE ASSESSED ON THE FUEL USED FOR HEATING THE BUILDING. DURING THE SUMMER PERIOD, THE AIR CONDITIONING OF THE BUILDING WILL BE CARRIED OUT USING THE COLD GROUPS (English)
Property / summary: ACTION 1: A CONDENSING BOILER INSTALLATION THE ENERGY UPGRADING INTERVENTION OF THE OFFICE OF ‘ASTRA DI ESTRA’) IN ASTRA SPA PROVIDES FOR THE COMPLETE REFURBISHMENT OF THE THERMAL POWER STATION THAT CAN BE ACHIEVED BY FULL REPLACEMENT OF THE CENTRAL COMPONENTS. THE CURRENT GENERATOR 3900-350 (UPGRADE TO THE FIREPLACE OF A POWER OF 449 KW, A USEFUL FUNCTION OF 405 KW), FUELLED BY METHANE, PRODUCES THERMAL ENERGY FOR THE HEATING OF THE SEAT AND DOMESTIC HOT WATER. INTERVENTION 1 PROVIDES FOR THE REPLACEMENT OF THE GENERATOR BY MEANS OF A CONDENSATION (ENHANCED FUNCTION ON THE FIRE SERVICE OF 349 KW), A USEFUL FUNCTION OF 344.1 KW, WHICH HAS ALWAYS BEEN FUELLED BY METHANE. THE NEW GENERATOR WILL PRODUCE HEAT USED FOR THE HEATING OF THE SEAT, ALLOWING SAVINGS IN PRIMARY ENERGY TERMS THAT CAN BE ASSESSED ON THE FUEL USED FOR HEATING THE BUILDING. DURING THE SUMMER PERIOD, THE AIR CONDITIONING OF THE BUILDING WILL BE CARRIED OUT USING THE COLD GROUPS (English) / rank
 
Normal rank

Revision as of 23:59, 24 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
(A19_093_2016_0930020_1019) EE WINDOW
Project in Italy financed by DG Regio

    Statements

    0 references
    8,907.84 Euro
    0 references
    17,815.68 Euro
    0 references
    50.0 percent
    0 references
    1 August 2016
    0 references
    3 October 2018
    0 references
    11 January 2019
    0 references
    E.S.TR.A. S.P.A. ENERGIA SERVIZI TERRITORIO AMBIENTE
    0 references
    0 references
    0 references

    43°27'46.44"N, 11°52'41.41"E
    0 references
    INTERVENTO 1: INSTALLAZIONE CALDAIA A CONDENSAZIONE L'INTERVENTO DI RIQUALIFICAZIONE ENERGETICA DELLA SEDE DI AREZZO DI ESTRA SPA PREVEDE IL RIFACIMENTO COMPLETO DELLA CENTRALE TERMICA REALIZZABILE TRAMITE LA SOSTITUZIONE INTEGRALE DELLA COMPONENTISTICA DI CENTRALE. L'ATTUALE GENERATORE RIELLO 3900-350 (POTENZIALITA AL FOCOLARE 449 KW, POTENZIALITA UTILE 405 KW), ALIMENTATO A METANO, PRODUCE L'ENERGIA TERMICA DESTINATA ALLA CLIMATIZZAZIONE INVERNALE DELLA SEDE E ALL'ACQUA CALDA SANITARIA. L'INTERVENTO 1 PREVEDE LA SOSTITUZIONE DEL GENERATORE CON UNO A CONDENSAZIONE (POTENZIALITA AL FOCOLARE 349 KW, POTENZIALITA UTILE 344,1 KW) SEMPRE ALIMENTATO A METANO. IL NUOVO GENERATORE PRODURRA ENERGIA TERMICA UTILIZZATA PER LA CLIMATIZZAZIONE INVERNALE DELLA SEDE, PERMETTENDO UN RISPARMIO IN TERMINI DI ENERGIA PRIMARIA VALUTABILE SUL COMBUSTIBILE UTILIZZATO PER IL RISCALDAMENTO DELL'EDIFICIO. DURANTE IL PERIODO ESTIVO, LA CLIMATIZZAZIONE DELL'EDIFICIO SARA REALIZZATA MEDIANTE I GRUPPI FRIGO ESIST (Italian)
    0 references
    ACTION 1: A CONDENSING BOILER INSTALLATION THE ENERGY UPGRADING INTERVENTION OF THE OFFICE OF ‘ASTRA DI ESTRA’) IN ASTRA SPA PROVIDES FOR THE COMPLETE REFURBISHMENT OF THE THERMAL POWER STATION THAT CAN BE ACHIEVED BY FULL REPLACEMENT OF THE CENTRAL COMPONENTS. THE CURRENT GENERATOR 3900-350 (UPGRADE TO THE FIREPLACE OF A POWER OF 449 KW, A USEFUL FUNCTION OF 405 KW), FUELLED BY METHANE, PRODUCES THERMAL ENERGY FOR THE HEATING OF THE SEAT AND DOMESTIC HOT WATER. INTERVENTION 1 PROVIDES FOR THE REPLACEMENT OF THE GENERATOR BY MEANS OF A CONDENSATION (ENHANCED FUNCTION ON THE FIRE SERVICE OF 349 KW), A USEFUL FUNCTION OF 344.1 KW, WHICH HAS ALWAYS BEEN FUELLED BY METHANE. THE NEW GENERATOR WILL PRODUCE HEAT USED FOR THE HEATING OF THE SEAT, ALLOWING SAVINGS IN PRIMARY ENERGY TERMS THAT CAN BE ASSESSED ON THE FUEL USED FOR HEATING THE BUILDING. DURING THE SUMMER PERIOD, THE AIR CONDITIONING OF THE BUILDING WILL BE CARRIED OUT USING THE COLD GROUPS (English)
    0 references

    Identifiers