(A19_074_2015_0740036_1041) INDUSTRIAL WAREHOUSE COVER (Q2065824): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): THE INTERVENTION WILL CONSIST OF EXTRAORDINARY MAINTENANCE OF INDUSTRIAL WAREHOUSE COVER FOR THE PURPOSE OF CONTAINING ENERGY CONSUMPTION, THROUGH THE COMPLETE REMOVAL OF THE COVER PANELS AND THE FALSE CEILINGS IN FIBRO-CEMENT, IN THE INSTALLATION OF NEW INSULATED PANELS IN SHEET METAL AND IN THE ASSEMBLY OF NEW SUSPENDED CEILINGS IN PLASTERBOARD., Adding English summary) |
||
Property / summary | |||
THE INTERVENTION WILL CONSIST OF EXTRAORDINARY MAINTENANCE OF INDUSTRIAL WAREHOUSE COVER FOR THE PURPOSE OF CONTAINING ENERGY CONSUMPTION, THROUGH THE COMPLETE REMOVAL OF THE COVER PANELS AND THE FALSE CEILINGS IN FIBRO-CEMENT, IN THE INSTALLATION OF NEW INSULATED PANELS IN SHEET METAL AND IN THE ASSEMBLY OF NEW SUSPENDED CEILINGS IN PLASTERBOARD. (English) | |||
Property / summary: THE INTERVENTION WILL CONSIST OF EXTRAORDINARY MAINTENANCE OF INDUSTRIAL WAREHOUSE COVER FOR THE PURPOSE OF CONTAINING ENERGY CONSUMPTION, THROUGH THE COMPLETE REMOVAL OF THE COVER PANELS AND THE FALSE CEILINGS IN FIBRO-CEMENT, IN THE INSTALLATION OF NEW INSULATED PANELS IN SHEET METAL AND IN THE ASSEMBLY OF NEW SUSPENDED CEILINGS IN PLASTERBOARD. (English) / rank | |||
Normal rank |
Revision as of 16:58, 24 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | (A19_074_2015_0740036_1041) INDUSTRIAL WAREHOUSE COVER |
Project in Italy financed by DG Regio |
Statements
22,470.0 Euro
0 references
44,940.0 Euro
0 references
50.0 percent
0 references
14 March 2015
0 references
3 May 2018
0 references
14 March 2017
0 references
SO.VER. S.R.L.
0 references
L'INTERVENTO CONSISTERA NELLA MANUTENZIONE STRAORDINARIA DELLA COPERTURA DI CAPANNONE AD USO INDUSTRIALE FINALIZZATA AL CONTENIMENTO DEI CONSUMI ENERGETICI, MEDIANTE RIMOZIONE COMPLETA DEI PANNELLI DI COPERTURA E DELLE LASTRE IN CONTROSOFFITTATURA IN FIBRO-CEMENTO, NELL'INSTALLAZIONE DI NUOVI PANNELLI CURVI COIBENTATI RIVESTITI IN LAMIERA E NEL MONTAGGIO DI NUOVO CONTROSOFFITTO IN CARTONGESSO. (Italian)
0 references
THE INTERVENTION WILL CONSIST OF EXTRAORDINARY MAINTENANCE OF INDUSTRIAL WAREHOUSE COVER FOR THE PURPOSE OF CONTAINING ENERGY CONSUMPTION, THROUGH THE COMPLETE REMOVAL OF THE COVER PANELS AND THE FALSE CEILINGS IN FIBRO-CEMENT, IN THE INSTALLATION OF NEW INSULATED PANELS IN SHEET METAL AND IN THE ASSEMBLY OF NEW SUSPENDED CEILINGS IN PLASTERBOARD. (English)
0 references
Identifiers
D58I15001810009
0 references