ECOCASTIONESE (Q2034574): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): THE AIM OF THE PROJECT IS TO OPTIMISE THE PRODUCTION PROCESS FOR THE BUILDINGS PRODUCED OR MAINTAINED BY THE BUILDINGS OF THE CASTIONESE S.R.L. THROUGH THE REDUCTION OF THE FACTORS AND PRODUCTION RESOURCES, AS WELL AS A REDUCTION OF THE “ENVIRONMENTAL COST”, WHICH COULD HAVE A POSITIVE IMPACT ON THE “COST” OF THE BUILDING., Adding English summary)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 18:30, 8 June 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
ECOCASTIONESE
Project in Italy financed by DG Regio

    Statements

    0 references
    14,754.84 Euro
    0 references
    29,509.68 Euro
    0 references
    50.0 percent
    0 references
    23 March 2018
    0 references
    31 May 2020
    0 references
    EDILE CASTIONESE S.R.L.
    0 references
    0 references
    IL PROGETTO SI PROPONE L'OBIETTIVO DI OTTIMIZZARE IL PROCESSO PRODUTTIVO DI COSTRUZIONE DEGLI IMMOBILI PRODOTTI O MANUTENUTI DALLA EDILE CASTIONESE S.R.L., MEDIANTE LA RIDUZIONE DEI FATTORI E DELLE RISORSE DI PRODUZIONE, OLTRE AD UNA RIDUZIONE DEL "COSTO AMBIENTALE", IN GRADO DI INCIDERE POSITIVAMENTE SUL "COSTO" DELL'EDIFICIO REALIZZATO. (Italian)
    0 references
    THE AIM OF THE PROJECT IS TO OPTIMISE THE PRODUCTION PROCESS FOR THE BUILDINGS PRODUCED OR MAINTAINED BY THE BUILDINGS OF THE CASTIONESE S.R.L. THROUGH THE REDUCTION OF THE FACTORS AND PRODUCTION RESOURCES, AS WELL AS A REDUCTION OF THE “ENVIRONMENTAL COST”, WHICH COULD HAVE A POSITIVE IMPACT ON THE “COST” OF THE BUILDING. (English)
    0 references

    Identifiers

    C55G19000060007
    0 references