ECOCASTIONESE (Q2034574): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): THE AIM OF THE PROJECT IS TO OPTIMISE THE PRODUCTION PROCESS FOR THE BUILDINGS PRODUCED OR MAINTAINED BY THE BUILDINGS OF THE CASTIONESE S.R.L. THROUGH THE REDUCTION OF THE FACTORS AND PRODUCTION RESOURCES, AS WELL AS A REDUCTION OF THE “ENVIRONMENTAL COST”, WHICH COULD HAVE A POSITIVE IMPACT ON THE “COST” OF THE BUILDING., Adding English summary) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 18:30, 8 June 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | ECOCASTIONESE |
Project in Italy financed by DG Regio |
Statements
14,754.84 Euro
0 references
29,509.68 Euro
0 references
50.0 percent
0 references
23 March 2018
0 references
31 May 2020
0 references
EDILE CASTIONESE S.R.L.
0 references
IL PROGETTO SI PROPONE L'OBIETTIVO DI OTTIMIZZARE IL PROCESSO PRODUTTIVO DI COSTRUZIONE DEGLI IMMOBILI PRODOTTI O MANUTENUTI DALLA EDILE CASTIONESE S.R.L., MEDIANTE LA RIDUZIONE DEI FATTORI E DELLE RISORSE DI PRODUZIONE, OLTRE AD UNA RIDUZIONE DEL "COSTO AMBIENTALE", IN GRADO DI INCIDERE POSITIVAMENTE SUL "COSTO" DELL'EDIFICIO REALIZZATO. (Italian)
0 references
THE AIM OF THE PROJECT IS TO OPTIMISE THE PRODUCTION PROCESS FOR THE BUILDINGS PRODUCED OR MAINTAINED BY THE BUILDINGS OF THE CASTIONESE S.R.L. THROUGH THE REDUCTION OF THE FACTORS AND PRODUCTION RESOURCES, AS WELL AS A REDUCTION OF THE “ENVIRONMENTAL COST”, WHICH COULD HAVE A POSITIVE IMPACT ON THE “COST” OF THE BUILDING. (English)
0 references
Identifiers
C55G19000060007
0 references