SMART FACTORY (Q2032120): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): THE INTENTION IS TO INCLUDE IN THE PRODUCTION PROCESS A SMART TORNIO THAT CAN INTERACT WITH THE MAN AND OTHER MACHINES THROUGH SPECIFIC SOFTWARE PROGRAMMES IN ORDER TO OPTIMISE PRODUCTION., Adding English summary) |
(Created claim: summary (P836): THE INTENTION IS TO INCLUDE IN THE PRODUCTION PROCESS A SMART TORNIO THAT CAN INTERACT WITH THE MAN AND OTHER MACHINES THROUGH SPECIFIC SOFTWARE PROGRAMMES IN ORDER TO OPTIMISE PRODUCTION., Adding English summary) |
||
Property / summary | |||
THE INTENTION IS TO INCLUDE IN THE PRODUCTION PROCESS A SMART TORNIO THAT CAN INTERACT WITH THE MAN AND OTHER MACHINES THROUGH SPECIFIC SOFTWARE PROGRAMMES IN ORDER TO OPTIMISE PRODUCTION. (English) | |||
Property / summary: THE INTENTION IS TO INCLUDE IN THE PRODUCTION PROCESS A SMART TORNIO THAT CAN INTERACT WITH THE MAN AND OTHER MACHINES THROUGH SPECIFIC SOFTWARE PROGRAMMES IN ORDER TO OPTIMISE PRODUCTION. (English) / rank | |||
Normal rank |
Revision as of 07:27, 24 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | SMART FACTORY |
Project in Italy financed by DG Regio |
Statements
26,601.0 Euro
0 references
53,202.0 Euro
0 references
50.0 percent
0 references
23 August 2016
0 references
13 April 2017
0 references
30 June 2017
0 references
CAMA SRL
0 references
SI INTENDE INSERIRE NEL PROCESSO PRODUTTIVO UN TORNIO INTELLIGENTE IN GRADO DI INTERAGIRE CON L'UOMO E CON LE ALTRE MACCHINE ATTRAVERSO SPECIFICI PROGRAMMI SOFTWARE AL FINE DI OTTIMIZZARE LA PRODUZIONE (Italian)
0 references
THE INTENTION IS TO INCLUDE IN THE PRODUCTION PROCESS A SMART TORNIO THAT CAN INTERACT WITH THE MAN AND OTHER MACHINES THROUGH SPECIFIC SOFTWARE PROGRAMMES IN ORDER TO OPTIMISE PRODUCTION. (English)
0 references
THE INTENTION IS TO INCLUDE IN THE PRODUCTION PROCESS A SMART TORNIO THAT CAN INTERACT WITH THE MAN AND OTHER MACHINES THROUGH SPECIFIC SOFTWARE PROGRAMMES IN ORDER TO OPTIMISE PRODUCTION. (English)
0 references
Identifiers
E31E17000210007
0 references