HYDRAULIC SHELTER FOR SURFACE LANDSLIDE MOVEMENTS IN THE PUBLIC BAND, UPSTREAM AND DOWNSTREAM, OF THE UPSTREAM AND DOWNSTREAM OF MONTERVERGINE-ACQUA OF THE VEINS — BENEFICIARY OF THE COMMUNITIES OF THE PARTENO AND VALLO DI LAURO (Q2023241): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 16:16, 8 June 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
HYDRAULIC SHELTER FOR SURFACE LANDSLIDE MOVEMENTS IN THE PUBLIC BAND, UPSTREAM AND DOWNSTREAM, OF THE UPSTREAM AND DOWNSTREAM OF MONTERVERGINE-ACQUA OF THE VEINS — BENEFICIARY OF THE COMMUNITIES OF THE PARTENO AND VALLO DI LAURO
Project in Italy financed by DG Regio

    Statements

    0 references
    2,084,039.65 Euro
    0 references
    2,778,719.54 Euro
    0 references
    75.0 percent
    0 references
    16 December 2010
    0 references
    2 January 2019
    0 references
    10 January 2019
    0 references
    COMUNITA' MONTANA PARTENIO - VALLO DI LAURO
    0 references
    0 references

    40°55'12.58"N, 14°44'19.00"E
    0 references
    PROGETTO FINALIZZATO AL RIPRISTINO, ALLA RIQUALIFICAZIONE ED ALLA MESSA IN SICUREZZA DELLA STRADA PRINCIPALE (DORSALE MONTEVERGINE - ACQUA DELLE VENE) E DI ALCUNE DELLE PRINCIPALI PISTE AIB CHE SI COLLEGANO ALLA SUDDETTA DORSALE. PREVEDE LA RIFUNZIONALIZZAZIONE E MESSA IN SICUREZZA DELLA CARREGGIATA DELLA STRADA TRAMITE IL PARZIALE RIFACIMENTO DELLA MASSICCIATA E RELATIVA REALIZZAZIONE EX NOVO DEL CONGLOMERATO BITUMINOSO DI USURA, RIPRISTINO DI POZZETTI E TOMBINI ESISTENTI E NUOVE TUBAZIONI ADEGUATE AI MOVIMENTI FRANOSI, RIPRISTINO ZANELLE E CANALIZZAZIONI ACQUE METEORICHE, FORNITURA E POSA IN OPERA DI BARRIERA STRADALE DI SICUREZZA MISTO METALLO-LEGNO, OPERE DI INGEGNERIA NATURALISTICA, RIPRISTINO MURATURE IN PIETRA, REALIZZAZIONE DI GABBIONATE E DI STRUTTURA DI SOSTEGNO IN TERRA RINFORZATA. (Italian)
    0 references
    PROJECT AIMING AT REHABILITATION, UPGRADING AND SECURING OF THE MAIN ROAD (MONTVERINE — WATER OF THE VEINS) AND SOME OF THE MAJOR AIB RUNWAYS WHICH CONNECT TO THE ABOVE BACKBONE. PROVIDES FOR THE RE-FUNCTIONING AND SAFETY OF THE CARRIAGEWAY OF THE ROAD THROUGH THE PARTIAL REFURBISHMENT OF THE OLD BALLAST AND THE CORRESPONDING NEW CONSTRUCTION OF THE ASPHALT CONCRETE, THE RESTORATION OF EXISTING MANHOLES AND DRAINS, AND NEW PIPES ADAPTED TO THE FRINGE MOVEMENTS, REHABILITATION OF ZELLE AND STORM WATER, SUPPLY AND LAYING DOWN A MIXED SAFETY ROAD BARRIER WITH METALS, BUILDING NATURAL ENGINEERING, CONSTRUCTION OF WALLS AND SUPPORT STRUCTURES IN REINFORCED GROUND. (English)
    0 references

    Identifiers

    F53J14000000006
    0 references