RENOVATION OF THE ENERGY HOUSE OF THE COTISA EP ASSOCIATIONS. 108 CC CERTOSA (Q2022823): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 16:12, 8 June 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
RENOVATION OF THE ENERGY HOUSE OF THE COTISA EP ASSOCIATIONS. 108 CC CERTOSA
Project in Italy financed by DG Regio

    Statements

    0 references
    318,537.5 Euro
    0 references
    749,500.0 Euro
    0 references
    42.5 percent
    0 references
    17 November 2015
    0 references
    31 March 2019
    0 references
    COMUNE DI SENALES
    0 references
    0 references
    0 references

    46°43'39.79"N, 10°51'45.94"E
    0 references
    IL PRESENTE PROGETTO SI TRATTA DEL RISANAMENTO ENERGETICO DELLA CASA DELLE ASSOCIAZIONI A CERTOSA. LA CASA DELLE ASSOCIAZIONI ACCOGLIE UNA GRANDE SALA PER RIUNIONI, LOCALI PER GLI ASSOCIAZIONI COME I VIGILI VOLONTARI, I CACCIATORI E LA CAPPELLA, INOLTRE Ê ALLOGGIATO L¿ASILO E UN APPARTAMENTO PER IL CUSTODE.\NIL RISANAMENTO ENERGETICO CONTIENE L¿ISOLAMENTO TERMICO DELLE FACCIATE E DEL TETTO. INOLTRE VIENE SOSTITUITO LA CENTRALE TERMICA AD GASOLIO ESISTENTE CON UN NUOVO IMPIANTO AD PELLET LEGNOSO CON ADEGUAMENTO DELLA POTENZA NOMINALE ALLA NUOVA SITUAZIONE DEL INVOLUCRO. NELL¿ASILO VIENE INSTALLATO UN IMPIANTO DI VENTILAZIONE CONTROLLATA AD ALTO RENDIMENTO DI RECUPERO CALORE PER GARANTIRE LA QUALITà DELL¿ARIA AMBIENTE E PER LA RIDUZIONE DELLE PERDITE DI VENTILAZIONE. (Italian)
    0 references
    THIS PROJECT CONCERNS THE ENERGY EFFICIENCY OF THE ASSOCIATIONS AT CERTOSA. THE ASSOCIATIONS HOUSE HOLDS A LARGE ROOM FOR MEETINGS, LOCAL ASSOCIATIONS SUCH AS THE VOLUNTARY SERVICE, HUNTERS AND CAPPELLA, AND EVEN IF THEY ARE ACCOMMODATED WITHIN THE CRÈCHE AND A FLAT FOR THE CUSTODIAN.\ NATIVE ENERGY RECOVERY CONTAINS LITTLE HEAT INSULATION OF THE FACADES AND ROOF. IN ADDITION, THE EXISTING DIESEL THERMAL POWER PLANT WITH A NEW WOOD PELLET PLANT IS BEING REPLACED BY ADAPTING THE NOMINAL POWER TO THE NEW HOUSING SITUATION. IN THE AREA OF ASYLUM, A CONTROLLED HIGH-YIELD CONTROLLED VENTILATION SYSTEM SHALL BE INSTALLED IN ORDER TO ENSURE THE QUALITY OF AMBIENT AIR AND THE REDUCTION OF VENTILATION LOSSES. (English)
    0 references

    Identifiers

    I76J17000000001
    0 references