DIRECTOR FOR THE CASE OF MR VALELLIOLI (Q2021720): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 16:00, 8 June 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | DIRECTOR FOR THE CASE OF MR VALELLIOLI |
Project in Italy financed by DG Regio |
Statements
9,814,543.08 Euro
0 references
13,285,166.46 Euro
0 references
73.88 percent
0 references
31 August 2017
0 references
24 July 2020
0 references
TERNA - RETE ELETTRICA NAZIONALE
0 references
IL PRESENTE PROGETTO CONCERNE LA MESSA IN OPERA DI N° 1 LINEA IN CAVO 150 KV, CHE COLLEGHERà LA FUTURA S.E. TERNA 'VALLE' CON LA STAZIONE TERNA ESISTENTE DENOMINATA 'PISCIOLI' LE STAZIONI SONO UBICATE, RISPETTIVAMENTE, NEL COMUNE DI ASCOLI SATRIANO (FG) E CANDELA (FG). I COLLEGAMENTI SOPRA DESCRITTI SARANNO REALIZZATI MEDIANTE L'INSTALLAZIONE DI CAVO ALTA TENSIONE XLPE 150 KV, TIPO ARE4H1H5E - 1X 1X1600 MM2 E AVRANNO LUNGHEZZE GEOMETRICHE DI TRACCIATO PARI A 10.400 M CA.E' PREVISTA L'INSTALLAZIONE DI UN SISTEMA DI MONITORAGGIO E GESTIONE DELLA LINEA , BASATO SULL'ACQUISIZIONE DELLA TEMPERATURA DEL CONDUTTORE DELLA LINEA STESSA DENOMINATO DTS (DISTRIBUTED TEMPERATURE SENSING). L'ACQUISIZIONE AVVIENE ATTRAVERSO L'UTILIZZO DI UN SENSORE DISTRIBUITO (FIBRA OTTICA) ED IL SISTEMA REGISTRA, NEL LUNGO PERIODO, LE CONDIZIONI D'UTILIZZO E DI FUNZIONAMENTO DELLA LINEA ELETTRICA IN CAVO INTERRATO, DETERMINANDO LA DURATA DI POSSIBILI SOVRACCARICHI E GENERANDO ALLARMI IN CASO DI COMPORTAMENTO CRI (Italian)
0 references
THE PRESENT PROJECT CONCERNS THE IMPLEMENTATION OF N° 1 LINE OF CABLE 150 KV, WHICH COLLEGERIS THE FUTURE S.E. TERNA ‘VALLEY’ WITH THE EXISTING TERNA STATION ‘PIPSCIOLI’ THE STATIONS ARE LOCATED RESPECTIVELY IN THE MUNICIPALITY OF ASCOLI SATRIANO (FG) AND CANDLE (FG). THE ABOVE LINKS WILL BE ACHIEVED BY INSTALLING THE XLPE 150 KV AC VOLTAGE, TYPE AR4H1H5E — 1X 1X1600 MM2 AND WILL HAVE A GEOMETRICAL WIDTH OF 10.400 M CA.THE INSTALLATION OF A SYSTEM FOR MONITORING AND MANAGING THE LINE, BASED ON THE ACQUISITION OF THE TEMPERATURE OF THE LINE HOLDER OF THE LINE CALLED DTS (DISTRIBUTED TEMPERATURES). THE ACQUISITION IS THROUGH THE USE OF A DISTRIBUTED SENSOR (OPTICAL FIBRE) AND THE SYSTEM RECORDS, IN THE LONG TERM, THE CONDITIONS FOR THE USE AND OPERATION OF THE UNDERGROUND CABLE, DETERMINING THE DURATION OF POSSIBLE OVERLOAD AND GENERATING WARNINGS IN THE CASE OF CRI CONDUCT. (English)
0 references
Identifiers
G63G17001390007
0 references