Groundwater REsource managemENt for non-Potable water pUrposes, baseMent protection, and heating - Pilot application (Q4302136): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Attach the beneficiary based on the string)
(‎Changed an Item: Change because item Q4389101 was merged with Q4386341)
Property / beneficiaryProperty / beneficiary
Q4389101 (Deleted Item)

Revision as of 21:44, 24 June 2022

Project Q4302136 in Greece, Bulgaria
Language Label Description Also known as
English
Groundwater REsource managemENt for non-Potable water pUrposes, baseMent protection, and heating - Pilot application
Project Q4302136 in Greece, Bulgaria

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    766,194.23 Euro
    0 references
    901,404.98 Euro
    0 references
    85.0 percent
    0 references
    15 March 2018
    0 references
    18 July 2021
    0 references
    ARISTOTLE UNIVERSITY OF THESSALONIKI-SPECIAL ACCOUNT FOR RESEARCH FUNDS - DEPARTMENT OF PHYSICS
    0 references
    0 references
    0 references
    Q4393104 (Deleted Item)
    0 references

    41°5'27.31"N, 23°32'28.75"E
    0 references

    40°35'7.44"N, 23°2'7.76"E
    0 references

    41°24'3.35"N, 23°12'28.62"E
    0 references

    40°56'15.40"N, 24°24'46.33"E
    0 references

    40°37'50.99"N, 22°57'33.19"E
    0 references

    42°1'15.10"N, 23°5'39.62"E
    0 references
    GREEN PUMP aspires to show a novel method that can be used to reduce unnecessary public works due to high network load, decrease the environmental impact of water/energy use in public buildings and, on the long run, save money. Our approach consists of the following: 1. Elaboration of criteria for site selection (groundwater quality, aquifer depth, vicinity to prospective users, flooding risk, etc.). 2. Study of technical implementation details to existing and new buildings and cost estimation. 3. Complete study of installations of several such systems in many areas of Greece. 4. Construction of one complete pilot installation in Thessaloniki, Greece, and secondary water use ones in Blagoevgrad and Petrich, Bulgaria, and Pylaia, Greece. 5. Elaboration of monitoring program for such systems and monitoring of the pilot systems. 6. Evaluation of the environmental and social benefits. Optimization of the design per user needs. 7. Policy document on the simplification of legal procedures. (English)
    0 references

    Identifiers

    0 references