Modernisation of the railway line Sofia — Dragoman-Serbian border: railway section Voluyak — Dragoman — Phase 1 (Q4292691): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Attach the beneficiary based on the string) |
(Changed an Item: Attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Property / beneficiary: Q4376572 / rank | |||
Normal rank |
Revision as of 11:53, 22 June 2022
Project Q4292691 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of the railway line Sofia — Dragoman-Serbian border: railway section Voluyak — Dragoman — Phase 1 |
Project Q4292691 in Bulgaria |
Statements
141,276,995.0 Bulgarian lev
0 references
72,051,267.45 Euro
0 references
254,659,072.34 Bulgarian lev
0 references
129,876,126.89 Euro
0 references
55.48 percent
0 references
20 May 2019
0 references
31 December 2023
0 references
ДП Национална компания "Железопътна инфраструктура"
0 references
Настоящото проектно предложение е реализация на проект "Модернизация на железопътна линия София–Драгоман-сръбска граница: жп участък Волуяк–Драгоман" (фаза 1). Проектът включва частично удвояване и модернизация на елементите на железопътната инфраструктура на жп участък Волуяк-Драгоман с дължина 33,34 км, съгласно изискванията на ТСОС и на Регламент 1315/2013 за скорост 160 км/ч за пътнически влакове и 120 км/ч за товари влакове. Обхватът на Фаза 1 е подробно разписан в Приложение 1, т. Б.3.1. Настоящето проектно предложение за модернизация на жп участък Волуяк-Драгоман (фаза 1) включва следните основни дейности: Дейност 1: Проектиране - Проектиране на ПУП и изготвяне на работен проект за елементите на железопътната инфраструктура Дейност 2: Закупуване на земя Дейност 3: Строителство: 1. Строително монтажни дейности и доставки на материали и оборудване за жп участък от Волуяк-Драгоман (РП Алдомировци запад): - модернизация на елементите на съществуващата инфраструктура и реконструкция на всички пресичания на жп инфраструктурата със съоръжения на други инфраструктури и др. - надграждане на SCADA - изграждане на нови елементи на железопътната инфраструктура по протежение на жп участъка - жп път (удвояване); спирка Костинброд; нови РП Алдомировци запад и РП Алдомировци изток; съоръжения, и др. за целия жп участък. 2. Въвеждане в експлоатация Дейност 4: Техническа помощ - 1.Управление на проекта и 2.Теренни проучвания и археологическо наблюдение Дейност 5: Публичност Дейност 6: Надзор по време на строителството - 1.Оценка на съответствието по ЗУТ, 2.Оценка на съответствието с ТСОС и 3.Авторски надзор Началната дата на проекта е 20.05.2019 г. (стартира подготовката на тръжна документация за обществена поръчка за строителство). Крайната дата е 31.12.2023 г. Общият срок за изпълнение е 55 месеца. (Bulgarian)
0 references
The present project proposal is the implementation of the project "Modernisation of the railway line Sofia-Dragoman-Serbian border: Voluyak-Dragoman railway section" (phase 1). The project involves partial doubling and modernisation of the railway infrastructure elements of the Voluyak-Dragoman railway section with a length of 33.34 km, as required by the TSI and Regulation 1315/2013 for a speed of 160 km/h for passenger trains and 120 km/h for freight trains. The scope of Phase 1 is detailed in Annex 1, item B.3.1. This project proposal for modernisation of the Voluyak-Dragoman railway section (phase 1) includes the following main activities: Activity 1: Design — Design of the DUP and preparation of a working project for the elements of the railway infrastructure Activity 2: Purchase of land Activity 3: Construction: 1. Construction works and supplies of materials and equipment for the railway section of Voluyak-Dragoman (IP Aldomirovtsi West): — modernisation of the elements of existing infrastructure and reconstruction of all crossings of railway infrastructure with facilities of other infrastructure, etc. — upgrading of SCADA — construction of new elements of railway infrastructure along the railway section — railway (doubling); Kostinbrod stop; new RP Aldomirovtsi west and RP Aldomirovtsi east; facilities, etc. for the entire railway section. 2. Commissioning Activity 4: Technical Assistance — 1. Project Management and 2.Terrain Studies and Archaeological Surveillance Activity 5: Publicity Activity 6: Supervision during construction — 1.Conformity assessment under the ZUT, 2.Assessment of compliance with the TSI and 3.Authoristic supervision The start date of the project is 20.05.2019 (the preparation of tender documentation for a public works contract starts). The final date is 31.12.2023. The total deadline for implementation is 55 months. (English)
30 May 2022
0 references
София-Област
0 references
Identifiers
BG16M1OP001-1.001-0006
0 references