UPGRADE OF THE PRIMARY SCHOOL EDUCATION TEN. EGER (Q2073636): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): UPGRADE OF THE PRIMARY SCHOOL EDUCATION TEN. MR EGER: UPGRADE OF THE PRIMARY SCHOOL EDUCATION TEN. MR EGER: REPLACEMENT OF WINDOW FRAMES, INSULATION OF WALLS AND SOLAI, REPLACEMENT OF HEAT GENERATOR AND ADJUSTMENT OF THE TEMPERATURE CONTROL SYSTEM, Adding English summary) |
(Changed an Item) |
||
Property / programme | |||
Property / programme: Veneto - ERDF / rank | |||
Normal rank |
Revision as of 17:23, 24 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | UPGRADE OF THE PRIMARY SCHOOL EDUCATION TEN. EGER |
Project in Italy financed by DG Regio |
Statements
248,311.9 Euro
0 references
620,779.75 Euro
0 references
40.0 percent
0 references
1 September 2014
0 references
22 November 2019
0 references
30 October 2018
0 references
COMUNE DI MUSSOLENTE
0 references
RIQUALIFICAZIONE ENERGETICA SCUOLA ELEMENTARE TEN. EGER: RIQUALIFICAZIONE ENERGETICA SCUOLA ELEMENTARE TEN. EGER: SOSTITUZIONE DEI SERRAMENTI, COIBENTAZIONE DELLE PARETI E DEI SOLAI, SOSTITUZIONE DEL GENERATORE DI CALORE E REVISIONE DEL SISTEMA DI TERMOREGOLAZIONE (Italian)
0 references
UPGRADE OF THE PRIMARY SCHOOL EDUCATION TEN. MR EGER: UPGRADE OF THE PRIMARY SCHOOL EDUCATION TEN. MR EGER: REPLACEMENT OF WINDOW FRAMES, INSULATION OF WALLS AND SOLAI, REPLACEMENT OF HEAT GENERATOR AND ADJUSTMENT OF THE TEMPERATURE CONTROL SYSTEM (English)
0 references
Identifiers
D25I16000000005
0 references