(A19_075_2015_0750063_1046) EXAMINATION (Q2065926): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): THE ENERGY UPGRADING PROJECT OF THE DISTRIBUTION CENTRE FOR RESISTANCE NO 139, IN ITS PREMISES? BADESES IN MONTERIGGIONI IS DIVIDED INTO TWO INTERVENTIONS. THE FIRST CONSISTS OF THE REDESIGN OF THE PRODUCTION FACILITIES, THE SECOND, THE INSULATION OF THE COLD STORES. ACTION 1: DO YOU HAVE CARRIED OUT AN ASSESSMENT OF THE ENERGY NEEDS OF THE REFRIGERATION SECTOR? CONCLUDED WITH L? IDENTIFICATION OF THE NEED? TO SEGMENT THE COLD PRODUCTION PROCESS...)
(‎Changed an Item)
Property / programme
 
Property / programme: Toscana - ERDF / rank
 
Normal rank

Revision as of 16:14, 24 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
(A19_075_2015_0750063_1046) EXAMINATION
Project in Italy financed by DG Regio

    Statements

    0 references
    77,308.5 Euro
    0 references
    154,617.0 Euro
    0 references
    50.0 percent
    0 references
    14 March 2015
    0 references
    13 December 2018
    0 references
    14 March 2017
    0 references
    ETRURIA SOCIETA' COOPERATIVA
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    IL PROGETTO DI RIQUALIFICAZIONE ENERGETICA DEL CENTRO DI DISTRIBUZIONE DI VIA DELLA RESISTENZA N. 139, IN LOCALIT? BADESSE A MONTERIGGIONI SI ARTICOLA IN DUE INTERVENTI. IL PRIMO CONSISTE NELLA RIPROGETTAZIONE DEGLI IMPIANTI PRODUTTIVI, IL SECONDO LA COIBENTAZIONE DEI MAGAZZINI FRIGORIFERI. INTERVENTO 1: INTERVENTO SUL SETTORE PRODUTTIVO DELLA REFRIGERAZIONE L?AZIENDA HA REALIZZATO UNA VALUTAZIONE DEI FABBISOGNI ENERGETICI DEL COMPARTO REFRIGERAZIONE CHE SI ? CONCLUSA CON L?INDIVIDUAZIONE DELLA NECESSIT? DI SEGMENTARE IL PROCESSO DI PRODUZIONE DEL FREDDO SCEGLIENDO DEI CAMPI DI LAVORO OMOGENEI. SEPARANDO IL FABBISOGNO DELLE CELLE CARNI DA QUELLO DEI LATTICINI SI RIDUCONO I CONSUMI ELETTRICI GRAZIE AL FATTO CHE PER OGNI GRADO IN PI? DI EVAPORAZIONE SI HA UNA RIDUZIONE DEGLI ASSORBIMENTI DOVUTA ALL?INCREMENTO DEL COP. INTERVENTO 2: COIBENTAZIONE DEI MAGAZZINI FRIGORIFERI IL SECONDO INTERVENTO CONSISTE NELLA COIBENTAZIONE DEI MAGAZZINI FRIGORIFERI MEDIANTE L?ISTALLAZIONE DI PANNELLI ALLE (Italian)
    0 references
    THE ENERGY UPGRADING PROJECT OF THE DISTRIBUTION CENTRE FOR RESISTANCE NO 139, IN ITS PREMISES? BADESES IN MONTERIGGIONI IS DIVIDED INTO TWO INTERVENTIONS. THE FIRST CONSISTS OF THE REDESIGN OF THE PRODUCTION FACILITIES, THE SECOND, THE INSULATION OF THE COLD STORES. ACTION 1: DO YOU HAVE CARRIED OUT AN ASSESSMENT OF THE ENERGY NEEDS OF THE REFRIGERATION SECTOR? CONCLUDED WITH L? IDENTIFICATION OF THE NEED? TO SEGMENT THE COLD PRODUCTION PROCESS BY CHOOSING HOMOGENEOUS FIELDS OF WORK. SEPARATING OUT THE NEEDS OF MEAT CELLS FROM THAT OF DAIRY PRODUCTS, REDUCES ELECTRICITY CONSUMPTION DUE TO THE FACT THAT FOR EACH GRADE IN PI? OF EVAPORATION IS THE REDUCTION OF REMOVALS DUE TO THE INCREASE OF THE COP. ACTION 2: THE SECOND MEASURE TO INSULATE COLD STORES CONSISTS OF THE INSULATION OF THE COLD STORES VIA THE INSTALLATION OF A PANEL. (English)
    0 references

    Identifiers