MUNICIPALITY OF TORELLA DEI LOMBARDI (AV) — WORKS TO COMPLETE THE SEWAGE SYSTEM IN THE SERVICE OF THE MUNICIPAL AND MUNICIPAL VILLAGES — 3° LOTTO (Q2023270): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): THE PROPOSED PROJECT IS THE 3ND CONSTITUENT PART OF THE CONSTRUCTION OF THE SEWAGE SYSTEM AT THE SERVICE OF THE DISTRICT AND MUNICIPAL GATE: WITH THE OTHER TWO LOTS, DUE TO A LACK OF FINANCIAL COVER, THE OPERATION OF THE TREATMENT PLANT WAS PROVIDED FOR A NUMBER OF 600 INHABITANTS IN THE FACE OF THE PRESUMED TOTAL POPULATION OF 900 INHABITANTS AND OTHER SEWER SYSTEMS AT THE SERVICE OF THE VILLAGES OF THE PROJECT PROPOSED FOR FINANCING, ALLOWING...) |
(Changed an Item) |
||
Property / programme | |||
Property / programme: Campania - ERDF / rank | |||
Normal rank |
Revision as of 04:21, 24 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | MUNICIPALITY OF TORELLA DEI LOMBARDI (AV) — WORKS TO COMPLETE THE SEWAGE SYSTEM IN THE SERVICE OF THE MUNICIPAL AND MUNICIPAL VILLAGES — 3° LOTTO |
Project in Italy financed by DG Regio |
Statements
1,050,032.53 Euro
0 references
1,400,043.38 Euro
0 references
75.0 percent
0 references
1 September 2013
0 references
30 June 2018
0 references
COMUNE DI TORELLA DEI LOMBARDI
0 references
IL PROGETTO PROPOSTO COSTITUISCE IL 3° LOTTO FUNZIONALE DELL'INTERVENTO DI COSTRUZIONE DELLA RETE FOGNARIA A SERVIZIO DELLE CONTRADE E BORGATE COMUNALI: CON GLI ALTRI DUE LOTTI, PER CARENZA DI COPERTURA FINANZIARIA, FU PREVISTA LA REALIZZAZIONE FUNZIONALE DELL'IMPIANTO DI DEPURAZIONE PER UN NUMERO DI 600 ABITANTI A FRONTE DELLA POPOLAZIONE TOTALE PRESUNTA DI 900 ABITANTI E DI ALTRI TRATTI DI RETE FOGNARIA A SERVIZIO DELLE BORGATE COMUNALI.LE OPERE PREVISTE CON IL PROGETTO PROPOSTO A FINANZIAMENTO CONSENTONO LA REALIZZAZIONE DEI COLLETTORI DI COLLEGAMENTO ALL'ESISTENTE IMPIANTO DI DEPURAZIONE. (Italian)
0 references
THE PROPOSED PROJECT IS THE 3ND CONSTITUENT PART OF THE CONSTRUCTION OF THE SEWAGE SYSTEM AT THE SERVICE OF THE DISTRICT AND MUNICIPAL GATE: WITH THE OTHER TWO LOTS, DUE TO A LACK OF FINANCIAL COVER, THE OPERATION OF THE TREATMENT PLANT WAS PROVIDED FOR A NUMBER OF 600 INHABITANTS IN THE FACE OF THE PRESUMED TOTAL POPULATION OF 900 INHABITANTS AND OTHER SEWER SYSTEMS AT THE SERVICE OF THE VILLAGES OF THE PROJECT PROPOSED FOR FINANCING, ALLOWING THE CONNECTIONS TO THE EXISTING WATER TREATMENT PLANT TO BE CARRIED OUT. (English)
0 references
Identifiers
B53H15000000009
0 references