THE JOINT PLACE OF GLUES SANNITA — ‘THE CLEAN-UP OF THE MUNICIPAL LANDFILL IN LOCALITING’ WATER WILL BE REMOVED.’ (Q2023822): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): THE PROJECT WILL PROVIDE FOR THE FOLLOWING ACTIVITIES: — GREEN AND WOODED GREEN COVER INCLUDING FULL ERADICATION, -REPROFILING OF THE LANDFILL BODY, — CAPPING (FINAL COVERAGE OF THE LANDFILL SITE), — RAIN WATER MANAGEMENT, — PRODUCTION WALL CONTAINMENT IN THE DOWNSTREAM SECTOR, AND THE PRODUCTION OF WELLS IN THE DOWNSTREAM WATER AND TO THE CONSTRUCTION OF A WATER BARRIER, -, AND WATER-CONDITIONING, AND PIEZOMETERS, TO RESTORE THE ENVIRONMENT., A...)
(‎Changed an Item)
Property / programme
 
Property / programme: Campania - ERDF / rank
 
Normal rank

Revision as of 04:26, 24 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
THE JOINT PLACE OF GLUES SANNITA — ‘THE CLEAN-UP OF THE MUNICIPAL LANDFILL IN LOCALITING’ WATER WILL BE REMOVED.’
Project in Italy financed by DG Regio

    Statements

    0 references
    726,458.69 Euro
    0 references
    968,611.59 Euro
    0 references
    75.0 percent
    0 references
    1 June 2012
    0 references
    14 November 2018
    0 references
    27 April 2018
    0 references
    COMUNE DI COLLE SANNITA
    0 references
    0 references
    0 references

    41°21'52.85"N, 14°49'59.63"E
    0 references
    IL PROGETTO PREVEDE LE ATTIVITà DI SEGUITO INDICATE:- RIPULITURA MANTO ERBACEO ED ARBOREO COMPRENSIVA DI ERADICAZIONE INTEGRALE,- RIPROFILATURA DEL CORPO DI DISCARICA,- CAPPING (COPERTURA DEFINITIVA DELLA DISCARICA),- REGIMAZIONE ACQUE METEORICHE,- REALIZZAZIONE MURO DI CONTENIMENTO NEL SETTORE DI VALLE,- REALIZZAZIONE POZZI DI EMUNGIMENTO DELLE ACQUE DI DISCARICA (BARRIERA IDRAULICA),- REALIZZAZIONE DIAFRAMMI IMPERMEABILI,- CONDIZIONAMENTO PIEZOMETRI,- RIPRISTINO AMBIENTALE. (Italian)
    0 references
    THE PROJECT WILL PROVIDE FOR THE FOLLOWING ACTIVITIES: — GREEN AND WOODED GREEN COVER INCLUDING FULL ERADICATION, -REPROFILING OF THE LANDFILL BODY, — CAPPING (FINAL COVERAGE OF THE LANDFILL SITE), — RAIN WATER MANAGEMENT, — PRODUCTION WALL CONTAINMENT IN THE DOWNSTREAM SECTOR, AND THE PRODUCTION OF WELLS IN THE DOWNSTREAM WATER AND TO THE CONSTRUCTION OF A WATER BARRIER, -, AND WATER-CONDITIONING, AND PIEZOMETERS, TO RESTORE THE ENVIRONMENT. (English)
    0 references

    Identifiers

    D74E13000070008
    0 references