PORT OF TERMS IMERESE — DREDGING WORK OF THE PORT AT ALTITUDE — 10.00 L (Q2017475): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): FOLLOWING THE DREDGING OF THE SEABED IN THE PORT OF TERMS OF THE HARBOUR OF THE PORT OF IMERESE TO THE ALTITUDE OF — 10.00 M ASL, THE FIRST STEP IN THE DREDGING PROCESS, THE REMOVAL OF UNSUITABLE MATERIAL FOR SEAWATER AT SEA, WHILE IN THE SECOND PHASE THE DREDGING OF THE REMAINING QUALITY CLASS A2 AND A1E WILL BE CARRIED OUT BY THE RESULTING VERSAMENTOEL LAYING SITE. FOR THE CONTAMINATED PART, THE METHOD OF DREDGING WILL BE SELECTIVE IN A SELECT...) |
(Changed an Item) |
||
Property / programme | |||
Property / programme: Infrastructures and Networks - IT - ERDF / rank | |||
Normal rank |
Revision as of 03:48, 24 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | PORT OF TERMS IMERESE — DREDGING WORK OF THE PORT AT ALTITUDE — 10.00 L |
Project in Italy financed by DG Regio |
Statements
26,250,000.0 Euro
0 references
35,000,000.0 Euro
0 references
75.0 percent
0 references
1 January 2016
0 references
31 March 2022
0 references
ADSP DEL MARE DI SICILIA OCCIDENTALE
0 references
L'INTERVENTO DI DRAGAGGIO PREVEDE LA REALIZZAZIONE DELL'ESCAVO DEI FONDALI DEL PORTO PORTO DI TERMINI IMERESE FINO ALLA QUOTA DI - 10,00 M S.L.M.M. LA PRIMA FASE DEL DRAGAGGIO RIGUERDERà LA RIMOZIONE DEL MATERIALE NON IDONEO ALL'IMMERSIONE IN MARE, MENTRE NELLA SECONDA FASE SARà ESEGUITO IL DRAGAGGIO DELLA RESTANTE PARTE CARATTERIZZATA DA CLASSE DI QUALITà A2 E A1E IL CONSEGUENTE VERSAMENTONEL SITO DI DEPOSIZIONE. PER LA PARTE CONTAMINATA, LE MODALITà DI DRAGAGGIO SARANNO DI TIPO SELETTIVO ESEGUITO TRAMITE BENNA ECOLOGICA. IL DRAGAGGIO DELLA RESTANT PARTE, DA ESEGUIRE AL TERMINE DELL'ESCAVO DEI SEDIMENTI NON IDONEI ALL'IMMERSIONE IN MARE, Ê PREVISTO MEDIANTE L'UTILIZZO DI UNA DRAGA A STRASCICO ASPIRANTE SEMOVENTE CON POZZO DI CARICO, TIPO TRAILING SUCTION HOPPER DREDGER (Italian)
0 references
FOLLOWING THE DREDGING OF THE SEABED IN THE PORT OF TERMS OF THE HARBOUR OF THE PORT OF IMERESE TO THE ALTITUDE OF — 10.00 M ASL, THE FIRST STEP IN THE DREDGING PROCESS, THE REMOVAL OF UNSUITABLE MATERIAL FOR SEAWATER AT SEA, WHILE IN THE SECOND PHASE THE DREDGING OF THE REMAINING QUALITY CLASS A2 AND A1E WILL BE CARRIED OUT BY THE RESULTING VERSAMENTOEL LAYING SITE. FOR THE CONTAMINATED PART, THE METHOD OF DREDGING WILL BE SELECTIVE IN A SELECTIVE WAY. THE DREDGING OF THE RELUCTANT PARTY, TO BE CARRIED OUT AFTER THE END OF THE NON-IMMERSIVE SEDIMENTS AT SEA, ENFORCED BY THE USE OF A SELF-PROPELLED TRAWLING DREDGER WITH A RIDE-ON LOAD, TYPE OF OPERATION HOPFOR DRDGER (English)
0 references
Identifiers
I69B19000000006
0 references