Development of Zsáka’s rainwater drainage system Stage III 2020 (Q3949430): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: fix budget)
(‎Changed an Item: Change because item Q3960153 was merged with Q3977874)
Property / beneficiaryProperty / beneficiary
Q3977874 (Deleted Item)

Revision as of 12:40, 23 May 2022

Project Q3949430 in Hungary
Language Label Description Also known as
English
Development of Zsáka’s rainwater drainage system Stage III 2020
Project Q3949430 in Hungary

    Statements

    0 references
    114,929,173.8 forint
    0 references
    324,904.77 Euro
    0.002827 Euro
    15 February 2022
    0 references
    127,699,082.0 forint
    0 references
    361,005.3 Euro
    0.002827 Euro
    15 February 2022
    0 references
    90.0 percent
    0 references
    1 August 2020
    0 references
    31 October 2022
    0 references
    ZSÁKA NAGYKÖZSÉGI ÖNKORMÁNYZAT
    0 references
    Q3977874 (Deleted Item)
    0 references

    47°7'19.20"N, 21°24'2.88"E
    0 references
    Zsáka Nagyközség belterületén a csapadékvíz és belvíz veszélyeztetettség további csökkentése Specifikus célok: A település ÉK-i részén a csapadékvíz elvezetés infrastrukturális feltételeinek javítása A csapadékvizek belterületről történő mielőbbi elvezetése a káresemények csökkentése érdekében II. Projekt részletes tartalma: Zsáka egy belvízveszélyes, csatornahálózattal sűrűn ellátott terület közepén fekszik, és a belterületről a csapadékvizet levezető Zsáka-Furta határcsatorna a településen halad át. Víztározásra gazdasági és műszaki okokból jelen ütemben nincs lehetőség, így a projekt a fő problémára, azaz az időszakosan megjelenő jelentős víztöbblet gyors és hatékony elvezetésére koncentrál. A projekt keretében csatornák és kapcsolódó műtárgyak építése és rekonstrukciója történik úgy, hogy az elvezetett belvíz káresemény mentesen tudjon a befogadó csatornán eltávozni. Zsáka a belvíz elvezetését a már korábbi ütemekhez igazodóan kívánja megoldani, a befogadótól visszafelé történő kiépítés elvet is figyelembe véve, így jelen ütemben a település ÉK-i részének kiépítése történik. A település központi részének a jelen III. ütemben történő csapadékvíz-védelmi fejlesztése az alábbi utcák infrastrukturális beavatkozásait foglalja magában: 1) D-1 lecsapoló csatorna (Bessenyei utca), 110 m burkolt medrű nyílt csatorna kiépítése történik, befogadója a Zsáka-Furta határcsatorna. 2) D-2 lecsapoló csatorna (Bezerédi utca, Bessenyei utca), 480 m csatorna kiépítése történik, ebből 425 m burkolt medrű nyílt csatorna, 55 m zárt csatorna az épület és töltés közelsége miatt, befogadója a Zsáka-Furta határcsatorna. 3) E lecsapoló csatorna (Arany János utca), 340 m burkolt medrű nyílt csatorna kiépítése történik, befogadója a Zsáka-Furta határcsatorna. 4) E-1 lecsapoló csatorna (Arany János utca), 275 m burkolt medrű nyílt csatorna kiépítése történik, befogadója az E lecsapoló csatorna. 5) E-2 lecsapoló csatorna (Máté János utca), 40 m burkolt medrű nyílt csatorna kiépítése történik, befogadója a Zsáka-Furta határcsatorna. 6) F lecsapoló csatorna (Jókai Mór utca), 350 m burkolt medrű nyílt csatorna kiépítése történik, befogadója a Zsáka-Furta határcsatorna. 7) F-1 lecsapoló csatorna (Jókai Mór utca), 210 m burkolt medrű nyílt csatorna kiépítése történik, befogadója az F lecsapoló csatorna. 8) F-1-1 lecsapoló csatorna (Jókai Mór utca), 50 m burkolt medrű nyílt csatorna kiépítése történik, befogadója az F-1 lecsapoló csatorna.9) 8. sz. főgyűjtő csatorna 0+030-0+226. szelvényben (Táncsics M. utca), 196 m burkolt medrű nyílt csatorna kiépítése történik, befogadója a 8. sz. főgyűjtő. A projekt keretében kiépítésre kerül összesen 2051 m burkolt csatorna (ebből 1996 m nyílt, 55 m fedett), át- vagy kiépítésre kerül 8 db áteresz, illetve 88 db kapubejáró vagy villanyoszlop bevédés. A III. ütem fejlesztései vízjogi létesítési engedélyes tervdokumentációval rendelkeznek. A vízjogi létesítési engedély száma 6974/6/2013., amely 35900/8304-9/2015.Ált. számon meghosszabbításra került. Jelen projekt keretében tervezett szemléletformáló akció a vízzel való gazdálkodáshoz, a víz, mint érték tudatosításához kötődik. Megvalósul még kötelező nyilvánosság és projektmenedzsment tevékenység. (Hungarian)
    0 references
    Further reduction of the risk of rainwater and inland water in the inner area of Zsáka Municipality Specific objectives: Improvement of the infrastructure conditions for rainwater drainage in the north of the settlement The rapid discharge of rainwater from the internal area in order to reduce damage events Detailed content of the project: Zsáka lies in the middle of an inland water-threatening area with a dense sewer network, and the Zsáka-Furta border canal which drains the rainwater from the inner area passes through the settlement. For economic and technical reasons, water reservoirs are not possible at the present pace, so the project focuses on the main problem, i.e. the rapid and efficient draining of significant water surpluses that appear periodically. As part of the project, canals and related artefacts are constructed and reconstructed in such a way that the drained inland water can leave the receiving channel free of damage. Zsáka intends to solve the drainage of the inland water in line with the previous phases, taking into account the principle of backward construction from the host, so the construction of the SPA part of the settlement is being carried out at this stage. The development of the central part of the settlement for the protection of rainwater during this phase III includes the infrastructural interventions of the following streets: 1) D-1 drainage channel (Bessenyei street), 110 m covered open channel is built, hosted by the Zsáka-Furta border channel. 2) D-2 drainage channel (Bezerédi street, Bessenyei street), 480 m canal is built, of which 425 m covered open channel, 55 m closed channel due to the proximity of the building and embankment, hosted by the Zsáka-Furta border canal. 3) This drainage channel (Goldany János Street), 340 m paved open channel is being built, hosted by the Zsáka-Furta border canal. 4) E-1 drainage channel (Goldany János street), 275 m covered open channel is built, hosted by the E drainage channel. 5) E-2 drainage channel (Máté János utca), 40 m covered open channel is being built, hosted by the Zsáka-Furta border canal. 6) F drainage channel (Jókai Mór street), 350 m covered open channel is built, hosted by the Zsáka-Furta border channel. 7) F-1 drainage channel (Jókai Mór street), 210 m covered open channel is built, receiving the F drainage channel. 8) F-1-1 drainage channel (Jókai Mór utca), 50 m covered open channel is built, hosted by the F-1 drainage channel.9) Main collection channel No. 8 in section 0+ 030-0+ 226. (Táncsics M. street), 196 m covered open channel is built, receiving the 8th main collector. As part of the project, a total of 2 051 m of paved sewers will be built (of which 1 996 m open, 55 m covered), 8 perimeters or 88 gateway or electric poles will be protected. The development of Stage III has a planning documentation with a permit for the establishment of water rights. Water rights permit No 6974/6/2013, which was extended under No 35900/8304-9/2015. The awareness-raising action planned in the framework of this project is linked to the management of water and the awareness of water as a value. Mandatory publicity and project management activities will be implemented. (English)
    9 February 2022
    0 references
    Poursuite de la réduction du risque d’eau de pluie et d’eau intérieure dans la zone intérieure de la municipalité de Zsáka Objectifs spécifiques: Amélioration des conditions d’infrastructure pour le drainage des eaux de pluie dans le nord de la colonie Le rejet rapide de l’eau de pluie de l’aire intérieure afin de réduire les dommages Contenu détaillé du projet: Zsáka se trouve au milieu d’une zone intérieure mettant en danger les eaux avec un réseau d’égouts dense, et le canal frontalier de Zsáka-Furta qui draine l’eau de pluie de la zone intérieure passe par la colonie. Pour des raisons économiques et techniques, les réservoirs d’eau ne sont pas possibles au rythme actuel, de sorte que le projet se concentre sur le principal problème, c’est-à-dire le drainage rapide et efficace des excédents d’eau importants qui apparaissent périodiquement. Dans le cadre du projet, des canaux et des objets connexes sont construits et reconstruits de manière à ce que les eaux intérieures drainées puissent laisser le canal récepteur exempt de dommages. Zsáka a l’intention de résoudre le drainage des eaux intérieures conformément aux phases précédentes, en tenant compte du principe de la construction en arrière à partir de l’hôte, de sorte que la construction de la partie ZPS de la colonie est en cours de réalisation à ce stade. Le développement de la partie centrale de l’agglomération pour la protection de l’eau de pluie au cours de cette phase III comprend les interventions infrastructurelles des rues suivantes: 1) canal de drainage D-1 (rue Bessenyei), 110 m couvert canal ouvert est construit, hébergé par le canal frontière Zsáka-Furta. 2) canal de drainage D-2 (rue Bezerédi, rue Bessenyei), un canal de 480 m est construit, dont 425 m couvert canal ouvert, 55 m canal fermé en raison de la proximité du bâtiment et du remblai, hébergé par le canal frontalier Zsáka-Furta. 3) Ce canal de drainage (rue Goldany János), un canal ouvert pavé de 340 m est en construction, hébergé par le canal frontalier de Zsáka-Furta. 4) E-1 canal de drainage (rue Goldany János), 275 m couvert canal ouvert est construit, hébergé par le canal de drainage E. 5) canal de drainage E-2 (Máté János utca), un canal ouvert couvert de 40 m est en construction, hébergé par le canal frontalier de Zsáka-Furta. 6) F canal de drainage (rue Jókai Mór), 350 m couvert canal ouvert est construit, hébergé par le canal de la frontière Zsáka-Furta. 7) canal de drainage F-1 (rue Jókai Mór), 210 m couvert canal ouvert est construit, recevant le canal de drainage F. 8) canal de drainage F-1-1 (Jókai Mór utca), 50 m couvert canal ouvert est construit, hébergé par le canal de drainage F-1.9) canal principal de collecte no 8 dans la section 0+ 030-0+ 226. (rue Táncsics M.), 196 m de chenal ouvert couvert est construit, recevant le 8ème collecteur principal. Dans le cadre du projet, un total de 2 051 m d’égouts pavés seront construits (dont 1 996 m ouverts, 55 m couverts), 8 périmètres ou 88 passerelles ou poteaux électriques seront protégés. L’élaboration de l’étape III dispose d’une documentation de planification assortie d’un permis pour l’établissement de droits d’eau. Permis d’accès à l’eau no 6974/6/2013, qui a été prorogé sous le no 35900/8304-9/2015. L’action de sensibilisation prévue dans le cadre de ce projet est liée à la gestion de l’eau et à la sensibilisation à l’eau en tant que valeur. Des activités obligatoires de publicité et de gestion de projet seront mises en œuvre. (French)
    10 February 2022
    0 references
    Zsáka, Hajdú-Bihar
    0 references

    Identifiers

    TOP-2.1.3-16-HB1-2019-00003
    0 references