Development of an industrial area in Archbishop’s wild garden, Phase II (Q3946766): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item: fix budget)
Property / co-financing rate
 
89.0 percent
Amount89.0 percent
Unitpercent
Property / co-financing rate: 89.0 percent / rank
 
Normal rank
Property / budget
 
147,345,806.0 forint
Amount147,345,806.0 forint
Unitforint
Property / budget: 147,345,806.0 forint / rank
 
Normal rank
Property / budget
 
416,546.59 Euro
Amount416,546.59 Euro
UnitEuro
Property / budget: 416,546.59 Euro / rank
 
Preferred rank
Property / budget: 416,546.59 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / budget: 416,546.59 Euro / qualifier
 
point in time: 15 February 2022
Timestamp+2022-02-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / EU contribution
 
131,137,767.34 forint
Amount131,137,767.34 forint
Unitforint
Property / EU contribution: 131,137,767.34 forint / rank
 
Normal rank
Property / EU contribution
 
370,726.47 Euro
Amount370,726.47 Euro
UnitEuro
Property / EU contribution: 370,726.47 Euro / rank
 
Preferred rank
Property / EU contribution: 370,726.47 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / EU contribution: 370,726.47 Euro / qualifier
 
point in time: 15 February 2022
Timestamp+2022-02-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 02:36, 15 February 2022

Project Q3946766 in Hungary
Language Label Description Also known as
English
Development of an industrial area in Archbishop’s wild garden, Phase II
Project Q3946766 in Hungary

    Statements

    0 references
    131,137,767.34 forint
    0 references
    370,726.47 Euro
    0.002827 Euro
    15 February 2022
    0 references
    147,345,806.0 forint
    0 references
    416,546.59 Euro
    0.002827 Euro
    15 February 2022
    0 references
    89.0 percent
    0 references
    2 January 2019
    0 references
    30 September 2021
    0 references
    ÉRSEKVADKERT KÖZSÉG ÖNKORMÁNYZATA
    0 references
    0 references

    48°0'4.03"N, 19°12'30.67"E
    0 references
    A fejlesztés célja Érsekvadkert Községben az ipari területen egy 680 m2 területű, multifunkcionális ipari csarnok épület fejlesztése, II. ütemként. A tervezett acél vázszerkezetű épület a változó gazdasági igények széleskörű kielégítése céljából nagyméretű (680,0 m2), a használati funkciónak (raktár, munkatér) megfelelően tovább tagolható csarnoktérből és az azt kiszolgáló kiegészítő helyiségekből áll. A fejlesztés részeként megépítjük a telken belül a csarnokhoz tartozó utakat, melyek az elvárt funkciónak megfelelően biztosítják az épült bejáratainak megközelítését, gépjármű és gyalogos forgalom számára egyaránt. Az ingatlanon a tervezett ipari, szolgáltató funkcióhoz a megfelelő számú parkolóhely az épületek melletti területen és a belső utak mentén kerül kialakításra, melyből 1 db akadálymentesen készül. Az épület megközelítése és használata során az akadálymentességi követelmények komplex teljesítése tervezett. Az épület gépészeti és villamos rendszerei megújuló energiaforrások felhasználásával is üzemelő kialakításban tervezettek. A tervezett tevékenységek a pályázati felhívás 3.1. pontjában található megbontás szerint az alábbiak: B) Iparterületek kialakítása és meglévők fejlesztése, barnamezős, illetve zöldmezős beruházások A főtevékenységen belül támogatható: a) Az iparterületek telekhatáron belüli alapinfrastruktúrájának (gáz, víz, csatorna, út, iparvágány, parkoló, elektromos vezetékrendszer, energia hálózat, távközlési és kommunikációs hálózat, hulladékkezelő létesítmények) kiépítése, átalakítása, felújítása, bővítése, korszerűsítése, közlekedőfelület kialakítása, illetve telekhatáron kívüli alapinfrastrukturális beruházás a Felhívás 3.4. pontja szerint. b) A termelő és szolgáltató tevékenységekhez kapcsolódó új épület építése, létesítése, a szükséges épületgépészeti beruházások végrehajtása. Kötelezően megvalósítandó, önállóan nem támogatható tevékenységek a 3.1.2.1. pont alapján: a) Akadálymentesítés c) Energiahatékonysági intézkedések d) Nyilvánosság biztosítása Elektromos járművek használatához szükséges alapvető töltő-infrastruktúra kiépítése a beruházás környezetében azért nem releváns, mert az I. ütemben megvalósításra kerül. A fejlesztés célja összhangban van a pályázati felhívás célkitűzéseivel, egyértelmű a gazdaságélénkítő és foglalkoztatás-ösztönző térségi és helyi hatása, hiszen a megépülő csarnoképület kiadásával termelő vállalkozás betelepítése a cél, mely munkahelyeket teremt a településen. Az üzleti infrastruktúrát igénybe vevő vállalkozások számának növekedésével javul a gazdasági aktivitás, illetve nő a versenyképesség a magasabb minőségű és szélesebb körű szolgáltatások által. A projekt megfelel a pályázati felhívás 3.4. pontjában foglalt feltételeknek: A fejlesztés során legalább egy önállóan támogatható tevékenységet valósítunk meg. A beruházás zöldmezős, melyet az indokol, hogy az I. ütemben kialakított ipari terület továbbfejlesztésére ad lehetőséget jelen projekt, a megépített csarnokkal könnyebben lehetővé válik az ipari terület benépesítése, a betelepülni szándékozó vállalkozások vonzása, ami által fellendül a település gazdasági élete, mely további pozitív gazdasági hatással jár. Az új épület építését is ugyanez indokolja, az ipari terület továbbfejlesztésének legjobb, leghatékonyabb módja egyelőre nyilvánvalóan nem a terület bővítése, hanem a terület mielőbbi teljes hasznosítása, melyet nagyban elősegít a csarnok építése. Mindezen okok mellett az is igaz, hogy a településen nem áll rendelkezésre olyan épület, melyből megfelelő ipari csarnokot lehetne építeni. Az épület gépészeti és villamos rendszerei megújuló energiaforrások felhasználásával is üzemelő kialakításban tervezettek. Az első kifizetési kérelemig igazoljuk, hogy a termőföldnek minősülő terület rendelkezik a termőföld végleges más célú hasznosítására vonatkozó jogerős ingatlanügyi hatósági engedéllyel. A terület az Önkormányzat tulajdonában van, nem a már betelepült vállalkozások területének fejlesztése valósul meg. A projekt telekhatáron kívüli fejlesztést nem tartalmaz. A felhívás tartalmi értékelési szempontok pontjában előírt feltételek projektre vonatkozó teljesülését karakterkorlát miatt jelent pontban nem tudjuk bemutatni, azt az üzleti terv 3.2. pontjában fejtjük ki. (Hungarian)
    0 references
    The aim of the development is to develop a 680 m² multifunctional industrial hall building in the industrial area in the village of Archbishop. The planned steel frame building consists of a large hall space (680.0 m²) which can be further subdivided according to the function of use (warehouse, workspace) and the auxiliary rooms serving it. As part of the development, we will build the roads belonging to the hall within the plot, which ensure access to the built entrances according to the expected function, both for motor vehicles and pedestrian traffic. The appropriate number of parking spaces in the area next to the buildings and along the inner roads for the planned industrial and service function on the property, 1 of which is made unobstructed. Complex accessibility requirements are planned for access and use of the building. The building’s mechanical and electrical systems are designed in the construction of renewable energy sources. The planned activities, as broken down in point 3.1 of the call for proposals, are as follows: B) development of industrial areas and development of existing areas, brownfield and greenfield investments The main activity is eligible for: a) Construction, conversion, renovation, extension, modernisation of the basic infrastructure of industrial areas (gas, water, sewerage, road, siding, parking, electric wiring system, energy network, telecommunications and communication network, waste treatment facilities) within the boundary, as well as investment in basic infrastructure outside the boundary in accordance with point 3.4 of the call. B) Construction and construction of new buildings related to production and service activities and carrying out necessary technical building investments. Mandatory ineligible activities under point 3.1.2.1: a) Accessibility c) Energy efficiency measures (d) Providing publicity for basic charging infrastructure for the use of electric vehicles is not relevant in the environment of the investment because it will be implemented in Phase I. The aim of the development is in line with the objectives of the call for proposals, and the regional and local impact of economic and employment promotion is clear, since the goal is to set up a production company with the construction of a hall building, which will create jobs in the settlement. Increasing the number of businesses using business infrastructure will improve economic activity and increase competitiveness through higher quality and wider services. The project complies with the conditions set out in point 3.4 of the call for proposals: During the development, we implement at least one self-eligible activity. The investment is greenfield, which is justified by the fact that the current project provides the opportunity for the development of the industrial area developed in phase I, the built hall will make it easier to populate the industrial area and attract businesses wishing to settle, thereby boosting the economic life of the settlement, which has a further positive economic impact. The same reason for the construction of the new building, the best and most effective way to develop the industrial area is obviously not the extension of the area, but the full exploitation of the site as soon as possible, which is greatly facilitated by the construction of the hall. For all these reasons, it is also true that there is no building available in the municipality from which a suitable industrial hall could be built. The building’s mechanical and electrical systems are designed in the construction of renewable energy sources. Until the first payment application, we certify that the area classified as arable land has a final real estate authority licence for the permanent use of the land for other purposes. The area is owned by the Municipality, not the development of the area of established enterprises. The project does not include any development outside the boundary. Due to the limitation of character, we are unable to demonstrate the fulfilment of the conditions set out in the section of the call’s content assessment criteria for the project, which is explained in point 3.2 of the business plan. (English)
    9 February 2022
    0 references
    L’objectif du développement est de développer un bâtiment industriel multifonctionnel de 680 m² dans la zone industrielle du village d’Archevêque. Le bâtiment à ossature en acier prévu se compose d’un grand espace de hall (680,0 m²) qui peut être subdivisé en fonction de la fonction d’utilisation (entrepôt, espace de travail) et des locaux auxiliaires qui le desservent. Dans le cadre du développement, nous allons construire les routes appartenant au hall à l’intérieur du terrain, qui assurent l’accès aux entrées construites selon la fonction prévue, tant pour les véhicules à moteur que pour la circulation piétonne. Le nombre approprié d’espaces de stationnement dans la zone adjacente aux bâtiments et le long des routes intérieures pour la fonction industrielle et de service prévue sur la propriété, dont 1 est rendu libre. Des exigences complexes en matière d’accessibilité sont prévues pour l’accès et l’utilisation du bâtiment. Les systèmes mécaniques et électriques du bâtiment sont conçus pour la construction de sources d’énergie renouvelables. Les activités prévues, telles qu’elles sont ventilées au point 3.1 de l’appel à propositions, sont les suivantes: B) développement de zones industrielles et développement de zones existantes, de friches industrielles et d’investissements dans des zones nouvelles L’activité principale est admissible à: a) Construction, transformation, rénovation, extension, modernisation des infrastructures de base des zones industrielles (gaz, eau, égouts, routes, voies d’évitement, stationnement, système de câblage électrique, réseau énergétique, réseau de télécommunications et de communication, installations de traitement des déchets) à l’intérieur de la frontière, ainsi que les investissements dans les infrastructures de base en dehors de la frontière conformément au point 3.4 de l’appel. B) Construction et construction de nouveaux bâtiments liés aux activités de production et de service et réalisation des investissements techniques nécessaires. Activités obligatoires inéligibles au titre du point 3.1.2.1: a) Accessibilité c) Mesures d’efficacité énergétique d) Faire de la publicité pour les infrastructures de recharge de base pour l’utilisation des véhicules électriques n’est pas pertinent dans l’environnement de l’investissement, car il sera mis en œuvre au cours de la phase I. L’objectif du développement est conforme aux objectifs de l’appel à propositions, et l’impact régional et local de la promotion de l’économie et de l’emploi est clair, puisque l’objectif est de créer une entreprise de production avec la construction d’un hall, ce qui créera des emplois dans l’établissement. L’augmentation du nombre d’entreprises utilisant l’infrastructure commerciale permettra d’améliorer l’activité économique et d’accroître la compétitivité grâce à des services de meilleure qualité et plus vastes. Le projet respecte les conditions énoncées au point 3.4 de l’appel à propositions: Au cours du développement, nous mettons en œuvre au moins une activité auto-éligible. L’investissement est nouveau, ce qui se justifie par le fait que le projet actuel offre la possibilité de développer la zone industrielle développée au cours de la phase I, le hall construit facilitera la population de la zone industrielle et attirera les entreprises désireuses de s’installer, stimulant ainsi la vie économique de l’établissement, qui a un impact économique positif supplémentaire. La même raison pour la construction du nouveau bâtiment, la meilleure et la plus efficace façon de développer la zone industrielle n’est évidemment pas l’extension de la zone, mais la pleine exploitation du site dès que possible, ce qui est grandement facilité par la construction du hall. Pour toutes ces raisons, il est également vrai qu’il n’y a pas de bâtiment disponible dans la commune à partir duquel un hall industriel approprié pourrait être construit. Les systèmes mécaniques et électriques du bâtiment sont conçus pour la construction de sources d’énergie renouvelables. Jusqu’à la première demande de paiement, nous attestons que la superficie classée comme terres arables possède un permis final d’autorisation immobilière pour l’utilisation permanente du bien-fonds à d’autres fins. La zone est la propriété de la municipalité, et non le développement de la zone d’entreprises établies. Le projet n’inclut aucun développement à l’extérieur de la frontière. En raison de la limitation de la nature, nous ne sommes pas en mesure de démontrer le respect des conditions énoncées dans la section des critères d’évaluation du contenu de l’appel pour le projet, qui est expliqué au point 3.2 du plan d’entreprise. (French)
    10 February 2022
    0 references
    Érsekvadkert, Nógrád
    0 references

    Identifiers

    TOP-1.1.1-16-NG1-2017-00005
    0 references