Property / co-financing rate | |||||||||||||||
55.0 percent
| |||||||||||||||
Property / co-financing rate: 55.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
16,787,100.0 forint
| |||||||||||||||
Property / budget: 16,787,100.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
47,457.13 Euro
| |||||||||||||||
Property / budget: 47,457.13 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 47,457.13 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / budget: 47,457.13 Euro / qualifier | |||||||||||||||
point in time: 14 February 2022
| |||||||||||||||
Property / EU contribution | |||||||||||||||
9,232,905.0 forint
| |||||||||||||||
Property / EU contribution: 9,232,905.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
26,101.42 Euro
| |||||||||||||||
Property / EU contribution: 26,101.42 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 26,101.42 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / EU contribution: 26,101.42 Euro / qualifier | |||||||||||||||
point in time: 14 February 2022
|
Revision as of 22:56, 14 February 2022
Project Q3935206 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of solar system at Dancsi & Partner Ltd. Industrial Park site |
Project Q3935206 in Hungary |
Statements
9,232,905.0 forint
0 references
16,787,100.0 forint
0 references
55.0 percent
0 references
1 July 2020
0 references
30 June 2022
0 references
Dancsi & Társa Általános Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
0 references
A fejlesztés keretében a Társaság a makói telephelyén található iroda-kamionmosó épületére szeretne napelemes rendszert telepíteni. A beruházás kivitelezését a Vállalkozás 2020.07.01-2022.06.30. közötti időtartamban kívánja megvalósítani. A beruházási tevékenység nem engedélyköteles, a tervrajzok, a műszaki leírás rendelkezésre áll. A projekt keretében 49,83 kWp teljesítményű napelemes rendszer telepítése történik meg. A rendszer 1 db háromfázisú, 50 kW névleges teljesítményű Kaco Blueplanet 50.0 TL3 inverterből, továbbá 151 db, 330 Wp névleges teljesítményű, Risen RSM 120-6-330M típusú, monokristályos napelem modulból épül fel, felületük összesen 252,17 m2. A rendszer egyedi kialakítású, lapostetőre telepíthető alumínium tartószerkezetre kerül elhelyezésre, nagy szélterhelésnek is ellenálló rögzítéssel, ideális, déli tájolással és ~30°-os dőlésszöggel. A rendszer részét képezik továbbá kábelek/vezetékek elektromos szereléséhez szükséges anyagok. A projekt összköltsége 16.787.100,- Ft, amelyből a támogatás mértéke 9.232.905,- Ft, az önerő nagysága pedig 7.554.195,- Ft. Az önerő a Vállalkozás rendelkezésére áll. (Hungarian)
0 references
As part of the development, the Company would like to install a solar system on the building of the office-kamion washer located at its mako site. The Company intends to carry out the project between 01.07.2020-2022.06.30. The investment activity is not subject to authorisation, the drawings and technical specifications are available. The project involves the installation of a 49,83 kWp solar panel system. The system consists of 1 Kaco blueplanet 50.0 TL3 inverter of three-phase, 50 kW rated power, and 151 monocrystalline solar modules of type Risen RSM 120-6-330M with a nominal power of 330 Wp with a total surface area of 252.17 m². The system is placed on an aluminium support structure, which can be installed on a flat roof, with high wind load fastening, ideal south orientation and ~30° inclination. The system also includes materials for the electrical installation of cables/wires. The total cost of the project is HUF 16 787 100, of which the aid rate is HUF 9.232 905 and the amount of own resources is HUF 7.554.195. Own resources are at the disposal of the Company. (English)
8 February 2022
0 references
Dans le cadre du développement, la Société souhaite installer un système solaire sur le bâtiment de la laveuse de bureau-Kamion située sur son site de mako. La Société a l’intention de réaliser le projet entre le 01.07.2020-2022.06.30. L’activité d’investissement n’est pas soumise à autorisation, les plans et les spécifications techniques sont disponibles. Le projet implique l’installation d’un système de panneaux solaires de 49,83 kWp. Le système se compose de 1 onduleur Kaco blueplanet 50.0 TL3 de puissance nominale triphasée, de 50 kW et de 151 modules solaires monocristallins de type Risen RSM 120-6-330M avec une puissance nominale de 330 Wp avec une surface totale de 252,17 m². Le système est placé sur une structure de support en aluminium, qui peut être installée sur un toit plat, avec une forte résistance au vent, une orientation idéale vers le sud et une inclinaison d’environ 30°. Le système comprend également des matériaux pour l’installation électrique de câbles/fils. Le coût total du projet s’élève à 16 787 100 HUF, dont le taux d’aide est de 9 232 905 HUF et le montant des ressources propres de 7 554,195 HUF. Les ressources propres sont à la disposition de la Société. (French)
10 February 2022
0 references
Makó, Csongrád-Csanád
0 references
Identifiers
GINOP-4.1.4-19-2020-02202
0 references