Energy modernisation of the plant hall “GENERÁLÉP-3” Kft. (Q3934579): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: fix budget) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
55.0 percent
| |||||||||||||||
Property / co-financing rate: 55.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
70,706,000.0 forint
| |||||||||||||||
Property / budget: 70,706,000.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
199,885.86 Euro
| |||||||||||||||
Property / budget: 199,885.86 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 199,885.86 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / budget: 199,885.86 Euro / qualifier | |||||||||||||||
point in time: 14 February 2022
| |||||||||||||||
Property / EU contribution | |||||||||||||||
38,888,300.0 forint
| |||||||||||||||
Property / EU contribution: 38,888,300.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
109,937.22 Euro
| |||||||||||||||
Property / EU contribution: 109,937.22 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 109,937.22 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / EU contribution: 109,937.22 Euro / qualifier | |||||||||||||||
point in time: 14 February 2022
|
Revision as of 22:42, 14 February 2022
Project Q3934579 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy modernisation of the plant hall “GENERÁLÉP-3” Kft. |
Project Q3934579 in Hungary |
Statements
38,888,300.0 forint
0 references
70,706,000.0 forint
0 references
55.0 percent
0 references
2 March 2020
0 references
28 February 2022
0 references
"GENERÁLÉP- 3 " Fa- Fém és Épitőipari Korlátolt Felelősségü Társaság
0 references
AA projekt keretében az előkészítő tevékenyégként elkészültek az energetikai tanúsítványok, mind a meglévő, a köztes és a tervezett állapotra vonatkozóan, elkészült az kivitelezési tevékenységhez kapcsolódó tervdokumentum, a tervdokumentumok alapján tételes költségvetés került elkészítésre, egyeztetés történt az energetikussal, tervezővel, kivitelezőkkel a projekt sikeres megvalósítása érdekében. A projekt keretében történő fejlesztés nem engedély köteles beruházás, így az építési hatósággal történő egyeztetés nem volt szükséges. A projekt keretében az előkészítő tevékenységekre a Kft támogatást nem igényel, ezen költségeket saját forrásból finanszírozza. Pozitív támogatói döntést követően a Kedvezményezett szerződést köt a kivitelezési tevékenységekre vonatkozóan a legkedvezőbb ajánlatot adó vállalkozóval. Kiválasztásra kerül műszaki ellenőr a beruházás sikeres és szabályszerű megvalósítása érdekében. A projekt keretében kizárólag csak az kivitelezési tevékenységek kerülnek elszámolásra, melyekhez 55 % támogatást kívánunk igényelni. A kivitelező kiválasztásában, szakmai beszámoló és pénzügyi kifizetési kérelem elkészítésében projektmenedzser segítségét vesszük igénybe, aki több, mint 10 éves szakmai tapasztalattal rendelkezik Európai Uniós támogatások menedzsmentje terén. A kivitelezés folyamatában olyan műszaki ellenőrt kívánunk megbízni aki, számos Európai Uniós projekt megvalósításában vett részt, így megfelelő tapasztalattal rendelkezik. A projektmenedzser és a műszaki ellenőr tevékenységét a projekt keretében nem kívánjuk elszámolni. A projekt keretében a következő célterületekre kívánunk támogatást igényelni: - Hőszivattyú rendszerek alkalmazása fűtésre és/vagy hűtésre és/vagy használati melegvíz-termelésre és/vagy fűtésrásegítésre: A fűtési rendszer fejlesztése során LEVEGŐ/VÍZ hőszivattyú kerül telepítésre - Fűtött és fűtetlen teret elválasztó, nem nyílászáró szerkezetnek minősülő épülethatároló szerkezetek hőszigetelése: Elbontásra kerülnek a jelenlegi kapuk és a személyi bejáró, ezután az acél tartószerkezetet átalakítják a homlokzati síkok és az újonnan elhelyezésre kerülő Hörmann hőszigetelt kapuk miatt. Az új Hörmann kapuk 450*450 méretben (3db) készülnek elektromos mozgatással, a személybejáró hőszigetelt Hörmann ajtóból készül. A déli homlokzaton új homlokzati műanyag nyílászáró készül a 1-6 keretállások között 4,50m parapet magassággal raszterenként 6m szélességben 1m magasságban. Az ablakok a tetőbevilágítók elbontásából eredő fényszükségletet pótolják elkerülve ezzel a nappali mesterséges világítás folyamatos működését mely egyben energia megtakarítást is jelent. Karakterkorlát miatt nyilatkozat csatolásra került jelen pont kiegészítésére. (Hungarian)
0 references
In the framework of the project, the energy certificates were completed as preparatory activities, both in relation to the existing, intermediate and planned state, the planning document related to the construction activity was prepared, an itemised budget was prepared on the basis of the planning documents, and an agreement was made with the energetician, the designer and the contractors for the successful implementation of the project. Development in the framework of the project is not an investment subject to authorisation, so consultation with the building authority was not necessary. Within the framework of the project, the Ltd does not apply for funding for preparatory activities, and it finances these costs from its own resources. Following a positive donor decision, the Beneficiary enters into a contract with the contractor offering the most favourable offer for the construction activities. A technical inspector will be selected for the successful and proper implementation of the investment. In the framework of the project, only construction activities are accounted for, for which we want to apply for 55 % grant. We use the help of a project manager in the selection of the contractor, the preparation of a professional report and a financial payment application, who has more than 10 years of professional experience in the field of European Union grant management. We intend to entrust a technical inspector who has been involved in the implementation of a number of European Union projects and therefore has the necessary experience in the implementation process. The activities of the project manager and the technical inspector are not to be accounted for under the project. In the framework of the project, we intend to apply for funding in the following target areas: — Use of heat pump systems for heating and/or cooling and/or domestic hot water production and/or heating: During the development of the heating system, the heat pump will be installed — Heated and unheated building envelopes, other than doors and windows: The current gates and the personal entrance are dismantled, and the steel support structure is then transformed due to the facade planes and the newly installed Hörmann heat-insulated gates. The new Hörmann gates are made in 450*450 sizes (3pcs) with electric movement, the passenger entrance is made of heat-insulated Hörmann door. On the southern facade a new plastic doors and windows are made between 1-6 frame positions with a parapet height of 4.50 m at a height of 6 m per raster at 1 m height. The windows replace the light requirements resulting from the removal of roof lights, thus avoiding the continuous operation of daytime artificial lighting, which also saves energy. Due to a character limitation, a statement has been added to this point. (English)
8 February 2022
0 references
Dans le cadre du projet, les certificats énergétiques ont été achevés en tant qu’activités préparatoires, tant en ce qui concerne l’état actuel, intermédiaire que prévu, le document de planification relatif à l’activité de construction a été préparé, un budget détaillé a été établi sur la base des documents de planification et un accord a été conclu avec l’énergétique, le concepteur et les contractants pour la bonne exécution du projet. Le développement dans le cadre du projet n’est pas un investissement soumis à autorisation, de sorte que la consultation de l’autorité immobilière n’a pas été nécessaire. Dans le cadre du projet, la société ne demande pas de financement pour des activités préparatoires et elle finance ces coûts sur ses propres ressources. À la suite d’une décision positive du donateur, le bénéficiaire conclut un contrat avec l’entrepreneur offrant l’offre la plus favorable pour les activités de construction. Un inspecteur technique sera sélectionné pour la bonne mise en œuvre de l’investissement. Dans le cadre du projet, seules les activités de construction sont comptabilisées, pour lesquelles nous voulons demander une subvention de 55 %. Nous utilisons l’aide d’un chef de projet pour la sélection du contractant, la préparation d’un rapport professionnel et une demande de paiement financier, qui possède plus de 10 ans d’expérience professionnelle dans le domaine de la gestion des subventions de l’Union européenne. Nous avons l’intention de confier à un inspecteur technique qui a participé à la mise en œuvre d’un certain nombre de projets de l’Union européenne et qui possède donc l’expérience nécessaire dans le processus de mise en œuvre. Les activités du gestionnaire de projet et de l’inspecteur technique ne doivent pas être prises en compte dans le cadre du projet. Dans le cadre du projet, nous avons l’intention de demander un financement dans les domaines cibles suivants: — Utilisation de systèmes de pompe à chaleur pour le chauffage et/ou le refroidissement et/ou la production d’eau chaude domestique et/ou le chauffage: Lors du développement du système de chauffage, la pompe à chaleur sera installée — enveloppes chauffantes et non chauffées du bâtiment, autres que les portes et les fenêtres: Les portes actuelles et l’entrée personnelle sont démontées, et la structure de support en acier est ensuite transformée en raison des plans de façade et des portes à isolation thermique Hörmann nouvellement installées. Les nouvelles portes Hörmann sont fabriquées en 450 * 450 dimensions (3pcs) avec mouvement électrique, l’entrée passager est faite de porte Hörmann isolée thermiquement. Sur la façade sud, de nouvelles portes et fenêtres en plastique sont réalisées entre 1-6 positions de cadre avec une hauteur de parapet de 4,50 m à une hauteur de 6 m par raster à 1 m de hauteur. Les fenêtres remplacent les exigences en matière de lumière résultant de la suppression des lumières de toit, évitant ainsi le fonctionnement continu de l’éclairage artificiel diurne, ce qui permet également d’économiser de l’énergie. En raison d’une limitation de caractère, une déclaration a été ajoutée à ce point. (French)
10 February 2022
0 references
Derecske, Hajdú-Bihar
0 references
Identifiers
GINOP-4.1.4-19-2020-01313
0 references