Energy efficiency renovation of Timpa Bt.'s new site using renewable energy (Q3925041): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: fix budget) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
50.0 percent
| |||||||||||||||
Property / co-financing rate: 50.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
199,993,026.0 forint
| |||||||||||||||
Property / budget: 199,993,026.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
565,380.28 Euro
| |||||||||||||||
Property / budget: 565,380.28 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 565,380.28 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / budget: 565,380.28 Euro / qualifier | |||||||||||||||
point in time: 14 February 2022
| |||||||||||||||
Property / EU contribution | |||||||||||||||
99,996,513.0 forint
| |||||||||||||||
Property / EU contribution: 99,996,513.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
282,690.14 Euro
| |||||||||||||||
Property / EU contribution: 282,690.14 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 282,690.14 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / EU contribution: 282,690.14 Euro / qualifier | |||||||||||||||
point in time: 14 February 2022
|
Revision as of 21:45, 14 February 2022
Project Q3925041 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy efficiency renovation of Timpa Bt.'s new site using renewable energy |
Project Q3925041 in Hungary |
Statements
99,996,513.0 forint
0 references
199,993,026.0 forint
0 references
50.0 percent
0 references
5 June 2019
0 references
28 September 2020
0 references
TIMPA Faipari Kereskedelmi és Szolgáltató Betéti Társaság
0 references
A beruházás célja az Timpa Bt üzemcsarnokának és irodaépületének energetikai korszerűsítése. A korszerűsítés magában foglalja a felülvilágítók korszerűsítését, az összes nyílászáró cseréjét, a homlokzati falak utólagos ETICS rendszerrel történő hőszigetelését, az iroda-szociális épület lapostető felújítását, hőszigeteléssel, csapadékvíz szigeteléssel valamint napelemes rendszer telepítését. A napelemes rendszer 50 kW összteljesítményű 30 fokos dőlésszögű déli tájolású lesz. Az ETICS rendszer 15 cm vastagságú EPS hőszigeteléssel készül. A lapostető felújítás 20 cm vastagságú EPS hőszigeteléssel és PVC csapadékvíz szigeteléssel készül. A cserélt nyílászárók korszerű, hőszigetelő üvegezésű műanyag szerkezetek lesznek. Az építmény tervezésekor alkalmazott műszaki megoldások az OTÉK 50. § (3) bekezdésében meghatározott követelményeknek, rendeltetési célja szerinti alapvető követelményeinek, és a tervezési programban részletezett elvárásoknak megfelelnek.A napelemes rendszer telepítéséhez a statikus hozzájárult, az épületek állékonysága stabil. A projekt nem építési engedélyköteles beruházás. A felújítás során az üzem működése zavartalan lesz. (Hungarian)
0 references
The aim of the investment is the energy modernisation of Timpa Bt’s plant hall and office building. The modernisation includes the modernisation of the overlighters, the replacement of all doors and windows, the thermal insulation of facade walls with the ETICS system, the renovation of the flat roof of the office-social building, thermal insulation, rainwater insulation and the installation of a solar panel system. The solar panel system will have a southern orientation with 50 kW total power 30 degrees inclination. The ETICS system is made with 15 cm thick EPS thermal insulation. The flat roof renovation is made with 20 cm thick EPS thermal insulation and PVC rainwater insulation. The replaced doors and windows will be modern, thermally insulated plastic structures. The technical solutions used when designing the building meet the requirements set out in Section 50(3) of the OTÉK, the essential requirements according to its intended purpose and the requirements detailed in the design programme. The static contributed to the installation of the solar panel system and the stability of the buildings is stable. The project is not a project subject to construction permit. During the renovation, the operation of the plant will be uninterrupted. (English)
8 February 2022
0 references
L’objectif de l’investissement est la modernisation énergétique du hall d’usine et du bâtiment de bureaux de Timpa Bt. La modernisation comprend la modernisation des briquets, le remplacement de toutes les portes et fenêtres, l’isolation thermique des murs de façade avec le système ETICS, la rénovation du toit plat du bâtiment social-bureau, l’isolation thermique, l’isolation de l’eau de pluie et l’installation d’un système de panneaux solaires. Le système de panneaux solaires aura une orientation sud avec une puissance totale de 50 kW inclinaison de 30 degrés. Le système ETICS est fabriqué avec une isolation thermique EPS de 15 cm d’épaisseur. La rénovation du toit plat est réalisée avec une isolation thermique EPS de 20 cm d’épaisseur et une isolation de l’eau de pluie en PVC. Les portes et fenêtres remplacées seront des structures en plastique modernes et isolées thermiquement. Les solutions techniques utilisées lors de la conception du bâtiment répondent aux exigences de l’article 50(3) de l’OTÉK, aux exigences essentielles en fonction de sa destination et aux exigences détaillées dans le programme de conception. La statique a contribué à l’installation du système de panneaux solaires et la stabilité des bâtiments est stable. Le projet n’est pas soumis à un permis de construction. Pendant la rénovation, l’exploitation de l’usine sera ininterrompue. (French)
10 February 2022
0 references
Mohács, Baranya
0 references
Identifiers
GINOP-4.1.2-18-2018-00014
0 references