Energy modernisation of municipal buildings in the City of Alsózsolca Phase 2 (Q3950941): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: fix budget)
(‎Removed claims)
Property / co-financing rate
100.0 percent
Amount100.0 percent
Unitpercent
 
Property / co-financing rate: 100.0 percent / rank
Normal rank
 
Property / budget
340,160,995.0 forint
Amount340,160,995.0 forint
Unitforint
 
Property / budget: 340,160,995.0 forint / rank
Normal rank
 
Property / budget
961,635.13 Euro
Amount961,635.13 Euro
UnitEuro
 
Property / budget: 961,635.13 Euro / rank
Preferred rank
 
Property / budget: 961,635.13 Euro / qualifier
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
 
Property / budget: 961,635.13 Euro / qualifier
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / EU contribution
340,160,995.0 forint
Amount340,160,995.0 forint
Unitforint
 
Property / EU contribution: 340,160,995.0 forint / rank
Normal rank
 
Property / EU contribution
961,635.13 Euro
Amount961,635.13 Euro
UnitEuro
 
Property / EU contribution: 961,635.13 Euro / rank
Preferred rank
 
Property / EU contribution: 961,635.13 Euro / qualifier
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
 
Property / EU contribution: 961,635.13 Euro / qualifier
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 04:05, 15 February 2022

Project Q3950941 in Hungary
Language Label Description Also known as
English
Energy modernisation of municipal buildings in the City of Alsózsolca Phase 2
Project Q3950941 in Hungary

    Statements

    0 references
    1 June 2019
    0 references
    31 March 2021
    0 references
    ALSÓZSOLCA VÁROS ÖNKORMÁNYZATA
    0 references
    0 references

    48°4'24.17"N, 20°54'27.50"E
    0 references
    a.)A projekt célja az önkormányzati intézmények hatékonyabb energiahasználatának, racionálisabb energiagazdálkodásának elősegítése, amelyen belül alcélként jelenik meg: - Többségi önkormányzati és/vagy Többségi önkormányzati tulajdonú gazdasági társaság(ok) tulajdonában lévő épületek illetve infrastrukturális létesítmények energiahatékonyságot célzó felújítása és fejlesztése, amennyiben az egyes beruházások a fosszilis energiahordozókból származó üvegházhatású gázok (ÜHG) kibocsátásának csökkentését szolgálják; - a hazai megújuló energiaforrások fokozottabb használata, mivel az elmarad az EU átlagtól, ugyanakkor Magyarország ilyen jellegű potenciálja több területen is kimagasló. Ezért további cél a projektek keretein belül a megújuló energiaforrások elérhetőbbé tétele, használatának ösztönzése, népszerűsítése. b.) A projekt szakmai-műszaki tartalma a választott önállóan támogatható tevékenységek körének a bemutatásával együtt: Felhívás3.1.1.pontja alapján tervezett beruházási költségek, az alábbi tevékenységeket érintik: a), e), d), b) c.) A Felhívás 3.1.2.1. Kötelezően megvalósítandó, önállóan nem támogatható tevékenységek pontja alapján: a.) Akadálymentesítés. c)Felhívás 3.4.1.2 pontjában előírt feltételek teljesülése:Pályázó vállalja,hogy a projekt megvalósításával hozzájárul az alacsonyCO2kibocsátású gazdaság céljának eléréséhez,valamint a támogatás visszafizetése terhe mellett vállalják a projekt fenntartását. Projektgazda vállalja a vonatkozó környezetvédelmi és esélyegyenlőségi jogszabályok betartását.A projekt által érintett területen a védett természeti és kulturális értékeket megőrzi,a fennálló vagy a beruházás során keletkezett környezeti kárt és az esélyegyenlőség szempontjából jogszabályba ütköző nem-megfelelőséget legkésőbb a projekt megvalósítása során megszünteti.Fejlesztéshez kapcsolódó nyilvános eseményeken,kommunikációjában és viselkedésében esélytudatosságot fejez ki,nem közvetít szegregációt,csökkenti a csoportokra vonatkozó meglévő előítéleteket.A beruházás nem kirekesztő egyetlen társadalmi csoport számára sem.Mérlegelésre került,hogy a projekt megvalósítását vagy eredményét veszélyezteti-e extrém időjárási esemény vagy más időjárási kockázat.A projektnek nincs előre látható klímakockázata.A támogatást igénylő a projekt pénzügyi befejezésétől számított5évig vállalja,hogy a projekt megfelel az1303/2013/EU Rendelet71.cikkében foglaltaknak. d) Felhívás tartalmi értékelési szempontok pontjában előírt feltételek teljesülése:A tervezett projekt illeszkedik a NemzetiEnergiastratégia2030,MagyarországII.NemzetiEnergiahatékonysági CselekvésiTerv, ill.NemzetiÉpületenergetikaiStratégiában megfogalmazottakhoz.A fejlesztés összhangban van aFelhívás céljaival,aFelhívásban szereplő célokat teljesíti,azokhoz hozzájárul.A projektben foglalt tevékenységek hozzájárulnak az önkormányzatok által működtetett intézmények primerenergia-fogyasztásának csökkentéséhez.A tervezett beruházás hozzájárul az önkormányzatok által működtetett intézményekÜHG-kibocsátásának csökkentéséhez.A támogatást igénylő és a támogatási kérelem tárgya nem tartozik a Felhívás 4.2.pontja,valamint azÁÚFdokumentum2.pontja alatt meghatározott kizáró okok alá.A beavatkozás tárgyát képező épületek tulajdonviszonyai bemutatásra kerültek a Projekt Tervben. A fejlesztési elképzelés bemutatásában mérlegelésre került,hogy milyen valós kockázati tényezők veszélyeztetik a fejlesztés megvalósulását és azok milyen valószínűséggel következhetnek be,milyen hatást gyakorolnak a fejlesztésre,a kockázati tényezők kivédésére javaslattétel történt.A támogatást igénylő az ágazatiOP-k projektjeihez,illetve a TOP más intézkedéseihez, projektjeihez való kapcsolódást,a tervezett fejlesztések egymáshoz való illeszkedését,szinergikus hatását bemutatta a ProjektTervben e) Műszaki-szakmai eredmények: A Pályázó a középületek energetikai korszerűsítését kívánja megvalósítani : Közösségi ház épülete - Alsózsolca Görgey utca 1., 847/8 hrsz: Közösségi Ház épület homlokzatát hőszigeteljük15cm vastagEPShőszigeteléssel,lábazatát10cm vastagságúXPS-vel.Zárófödémet20cm vastagRockwoolFixrock kőzetgyapottal.Tetőtéri és ferde síkokat10cmesRockwoolFixrock kőzetgyapottal szigeteljük gipszkartonos elburkolással.Külső nyílászáróit cseréljük korszerű műanyag nyílászárókra.Gépészeti rendszert felújítjuk,új korszerű kazánt kap,vezetékeit hőszigeteléssel látjuk el.Hőleadókat cseréljük.Megújuló energia:visszatáplált rendszert a tetősíkra helyezünk.A fényforrásokat minden érintett épületnél cseréljük ledesre,az elektromos rendszereket felújítjuk.Fekete István Óvoda - Alsózsolca Fekete István utca 7., 182 hrsz és Alsózsolcai 2. sz. Óvoda - Alsózsolca Kossuth Lajos út 168., 1020/2 hrsz : Határoló szerkezet hőszigetelése, illetve nyílászáró csere. Emellett hőszivattyú rendszer telepítése és beüzemeltetése és a fűtési és HMV rendszer korszerűsítése. Napelemes rendszer telepítése. (Hungarian)
    0 references
    a.)The aim of the project is to promote more efficient energy use and rational energy management of municipal institutions, within which it is presented as a sub-target: — Renovation and development of buildings or infrastructure facilities owned by majority municipal and/or majority municipal companies for energy efficiency, provided that each investment is intended to reduce greenhouse gas (GHG) emissions from fossil fuels; — the increased use of domestic renewable energy sources is below the EU average, but Hungary’s potential is outstanding in many areas. The technical and technical content of the project, together with a description of the scope of the selected self-eligible activities, is therefore further aimed at making renewable energy sources more accessible, encouraging and promoting the use of renewable energy sources. The investment costs planned under point 3.1.1 of the call concern the following activities: (a), (e), (d), (b) (c) The Call 3.1.2.1. Based on the point of mandatory non-eligible activities to be carried out separately: a.) Accessibility. c)Conditions set out in point 3.4.1.2 of the call teljesülése:Pályázó undertakes to contribute to the achievement of the objective of a low-CO2 emission economy by implementing the project and to undertake to maintain the project on pain of repayment of the aid. Project promoter undertakes to comply with relevant environmental and equal opportunities legislation.In the area covered by the project, it preserves protected natural and cultural values,reduces existing or created environmental damage and eliminates legal non-conformity in terms of equal opportunities at the latest during the implementation of the project.Development-related public events, communication and behaviour expresses a sense of chance,not convey segregation,reduces segregation,reduces existing biases.The investment does not exclude any social group.The investment is not excluded by any social group.It was applied to causes of extremist weather event or other weather risk.The project does not include the project’s intentions to implement the project.In addition to the project’s intentions, it is designed by the institutions of the project.Equity is not exclusive to any social group.The project was added to the grounds of implementation or the outcome of the project-the reasons for the extreme weather event or other weather risk.The project does not include the provisions of the project’s intentions to implement the project.Equivalent to the project, it is designed to implement the project’s objectives.Equivalent to the project is designed by the institutions of the project.In the case of the project, it is not possible to exclude any social group.Investallation has not been incorporated into the grounds of extreme weather event or other weather risk.The project does not implement the project as intended by the entities set out in the terms and conditions of the project.Equity is designed by the entities set out in the project.Equity is not exclusive to any social group.Equity has been addressed to the extreme weather event or other weather risk.The project does not implement the project’s intended objectives.Equity is designed by the entities set forth in the project. In the presentation of the development concept, it was considered which real risk factors threaten the realisation of the development and how likely they could occur, what impact on the development,the risk factors were proposed.The connection to the projects of the sectoralOPs and the other measures and projects of the TOP, the synergistic effect of the planned developments were presented in the project plan e) Technical and professional results: The Applicant intends to implement energy modernisation of public buildings: Building of the community house — Alsózsolca Görgey street 1, 847/8 We insulate the facade of a community house building with 15 cm thickEPS thermal insulation, footing with 10 cm thickXPS.Zatrophy oedema20 cm thickRockwoolFixrock stone wool.Petting and oblique planes are insulated with 10cmesRockwoolFixrock stone wool with plasterboard covering.Our external doors are replaced with modern plastic windows. it receives a new modern boiler, its pipes are supplied with thermal insulation. We replace the heat-leaders.Renewable energia:visszatáplált system is placed on the roof plane.The light sources are replaced by leds, the electrical systems are refurbished in each of the buildings concerned.F black István Kindergarten — Alsózsolca Fekete István utca 7, 182 hrsz and Alsózsolcai No. 2 Kindergarten — Alsózsolca Kossuth Lajos út 168., 1020/2hrsz: Thermal insulation of a delimitation device or replacement of doors and windows. In addition, installing and installing a heat pump system and upgrading the heating and HMV system. Installation of solar system. (English)
    9 February 2022
    0 references
    a)L’objectif du projet est de promouvoir une utilisation plus efficace de l’énergie et une gestion rationnelle de l’énergie des institutions municipales, dans le cadre desquelles il est présenté comme un sous-objectif: — Rénovation et développement de bâtiments ou d’infrastructures appartenant à des entreprises municipales et/ou municipales majoritaires pour l’efficacité énergétique, à condition que chaque investissement soit destiné à réduire les émissions de gaz à effet de serre (GES) provenant des combustibles fossiles; — L’utilisation accrue des sources d’énergie renouvelables domestiques est inférieure à la moyenne de l’UE, mais le potentiel de la Hongrie est remarquable dans de nombreux domaines. Le contenu technique et technique du projet, ainsi qu’une description de la portée des activités auto-éligibles sélectionnées, visent donc davantage à rendre les sources d’énergie renouvelables plus accessibles, à encourager et à promouvoir l’utilisation des sources d’énergie renouvelables. Les coûts d’investissement prévus au point 3.1.1 de l’appel concernent les activités suivantes: (a), (e), (d), (b) (c) L’appel 3.1.2.1. Sur la base du point d’activités obligatoires non éligibles devant être exercées séparément: a.) Accessibilité. c)Conditions énoncées au point 3.4.1.2 de l’appel teljesülése:Pályázó s’engage à contribuer à la réalisation de l’objectif d’une économie à faibles émissions de CO2 par la mise en œuvre du projet et à s’engager à maintenir le projet sous peine de remboursement de l’aide. Le promoteur du projet s’engage à respecter la législation pertinente en matière d’environnement et d’égalité des chances.Dans le domaine couvert par le projet, il préserve les valeurs naturelles et culturelles protégées, réduit les dommages environnementaux existants ou créés et élimine la non-conformité juridique en termes d’égalité des chances au plus tard au cours de la mise en œuvre du projet.L’investissement n’exclut aucun groupe social.L’investissement n’est pas exclu par un groupe social. Dans la présentation du concept de développement, il a été examiné quels facteurs de risque réels menacent la réalisation du développement et la probabilité qu’ils puissent se produire, quel impact sur le développement,les facteurs de risque ont été proposés.Le lien avec les projets des PO sectoriels et les autres mesures et projets du TOP, l’effet synergique des développements prévus ont été présentés dans le plan de projet e) Résultats techniques et professionnels: La requérante a l’intention de mettre en œuvre la modernisation énergétique des bâtiments publics: Construction de la maison de communauté — rue Alsózsolca Görgey 1, 847/8 Nous isolons la façade d’un bâtiment de maison communautaire avec 15 cm d’épaisseur EPS isolation thermique, pieds avec 10 cm d’épaisseurXPS.Zatrophy œdème de 20 cm d’épaisseurRockwoolFixrock laine de pierre.Les plans de fixation et obliques sont isolés avec 10cmesRockwoolFixrock laine de pierre avec revêtement en plaques de plâtre.Nos portes extérieures sont remplacées par des fenêtres en plastique modernes. il reçoit une nouvelle chaudière moderne, ses tuyaux sont fournis avec isolation thermique. Nous remplaçons les têtes de chaleur.Le système energia:visszatáplált renouvelable est placé sur le plan du toit.Les sources lumineuses sont remplacées par des leds, les systèmes électriques sont rénovés dans chacun des bâtiments concernés.F noir István maternelle — Alsózsolca Fekete István utca 7, 182 hrsz et Alsózsolcai No 2 Kindergarten — Alsózsolca Kossuth Lajos út 168., 1020/2hrsz: Isolation thermique d’un dispositif de délimitation ou remplacement des portes et fenêtres. En outre, l’installation et l’installation d’un système de pompe à chaleur et la mise à niveau du système de chauffage et HMV. Installation du système solaire. (French)
    10 February 2022
    0 references
    Alsózsolca, Borsod-Abaúj-Zemplén
    0 references

    Identifiers

    TOP-3.2.1-16-BO1-2018-00135
    0 references