Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 100.0 percent / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 100,861,664.0 forint / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 285,135.92 Euro / rank | |||||||||||||||
Property / budget: 285,135.92 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 285,135.92 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 100,861,664.0 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 285,135.92 Euro / rank | |||||||||||||||
Property / EU contribution: 285,135.92 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 285,135.92 Euro / qualifier | |||||||||||||||
|
Revision as of 03:53, 15 February 2022
Project Q3950360 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy modernisation of the buildings of the Health House, the Mayor’s Office and the Library in Jászalsószentgyörgy |
Project Q3950360 in Hungary |
Statements
1 April 2017
0 references
30 November 2018
0 references
JÁSZALSÓSZENTGYÖRGY KÖZSÉGI ÖNKORMÁNYZAT
0 references
a.) A projekt célja : a 100%-ban önkormányzati tulajdonban lévő polgármesteri hivatal, egészségház és könyvtár épületeinek energiahatékonyságot célzó felújítása és fejlesztése, amely a fosszilis energiahordozókból származó üvegházhatású gázok (ÜHG) kibocsátásának csökkentését szolgálja, valamint ezen épületek működtetési és fenntartási költségeit jelentősen csökkenti. A fejlesztés összetett beruházásnak minősül a pályázati felhívás alapján. b.) A projekt szakmai-műszaki tartalma: I. A Könyvtár épületének energetikai korszerűsítése: Fűtéskorszerűsítés (Felhívás 3.1.1.b) pont): Az épület fűtésére az eddig használt gázkonvektorok teljes egészében elbontásra kerülnek, helyükre 1 db Viessmann Vitodens Gázüzemű kondenzációs földgáz tüzelésű, 26 kW névleges egységteljesítményű kombi kazán kerül elhelyezésre, amellyel a melegvíz termelés is megoldódik. Az új radiátorok új termotestes, állítható termofejjel (6-30 c-ig) rendelkező szelepekkel lesznek kialakítva. Építészeti beavatkozások (Felhívás 3.1.1.a) pont): Az épület fűtött teret határoló falainak belső oldali hőszigetelése; Zárófödém hőszigetelése a megfelelő értékre; Az épület külső nyílászáróinak energia-megtakarítást eredményező felújítása, szükség szerinti cseréje eredeti méretekben, kialakítással, profilokkal Akadálymentesítés: Megvalósul az épület projektarányos akadálymentesítése: az épület bejáratának és a mellékhelyiségének az elérési útvonal biztosításával történő, valamennyi fogyatékossági csoportra kiterjedő komplex (fizikai és info-kommunikációs) akadálymentesítése. II. A Polgármesteri Hivatal épületének energetikai korszerűsítése: Fűtéskorszerűsítés (3.1.2.h) pont): Az épület fűtésére az eddig használt gázkazánok elbontásra kerülnek, 1 db Viessmann Vitodens Gázüzemű kondenzációs földgáztüzelésű, 45 kW névleges egységteljesítményű kazán kerül elhelyezésre. A kazán külső időjárásfüggő vezérlésére szabályozó és kiegészítő berendezések kerülnek beépítésére. További építészeti munkálatok (3.1.1.a) pont): Az épület valamennyi homlokzatának meglévő hőszigetelésének bővítése; Zárófödém (lapostető) hőszigetelése a megfelelő értékre; Pincefödém alsó hőszigetelése; Az épület külső nyílászáróinak energia-megtakarítást eredményező felújítása, cseréje eredeti méretekben, kialakítással. III. Az Egészségház épületének energetikai korszerűsítése: Fűtéskorszerűsítés (3.1.1.e) pont): Az eddig használt gázkazán teljes egészében elbontásra kerül, helyére egységenként 1 db ecoFOREST ecoGEO HP1 inverteres hőszivattyú kerül elhelyezésre. A hőszivattyú külső időjárásfüggő vezérlésére szabályozó és kiegészítő berendezések kerülnek beépítésére. Az épület HMV ellátását a tervezett állapotban a hőszivattyú biztosítja majd. b.) A további építészeti munkálatok (3.1.1.a) pont): Az épület valamennyi homlokzatának meglévő hőszigetelésének bővítése; Zárófödém hőszigetelése a megfelelő értékre; Az épület külső nyílászáróinak energia-megtakarítást eredményező felújítása, üvegezésének cseréje eredeti méretekben, kialakítással. c) a felhívás 3.2 pontjában előírt feltételek teljesülése: A támogatást igénylő vállalja a Felhívás 3.2 és 3.4. pontjában meghatározott előírások teljesítését. A Felhívás 3.2 pontjában szereplő esélyegyenlőségi és környezetvédelmi előírásoknak a projekt megfelel. A projektnek előrelátható klímakockázata nincs. A projektnek a vizek állapotára nincs hatása, vízjogi létesítési engedély nem szükséges. A műszaki tervdokumentáció elkészítése és a teljes projekt előkészítés a fejezetben bemutatott projekt kidolgozására vonatkozó feltételek alapján készült. d) a felhívás tartalmi értékelési szempontok pontjában előírt feltételek teljesülése: A projekt az 1.1-1.7, 2.2, 2.3, 3.2, 3.3, 3.4, 4.1-4.4, 5.1, 10.1-10.6 értékelési szempontok mindegyikének megfelel. A tervezett projekt illeszkedik a TOP céljaihoz, szakmai indokoltság igény és kihasználtság megfelelő. A projekt megalapozottsága megfelelő. Az esetleges kockázatok elemzésre kerültek. Műemléki vagy helyi védelem alatt álló épület felújítására nem kerül sor. A fenntarthatósági kritériumoknak megfelel a projekt. A projekt illeszkedik más OP-k projektjeihez. A beruházás nem kirekesztő egyetlen társadalmi csoport számára sem. e) standard eljárás esetén a projekt terület-specifikus értékelési szempontok általi minősítése: A megvalósuló fejlesztés beavatkozási szinten illeszkedik a hatályos Jász-Nagykun-Szolnok Megyei Területfejlesztési Programhoz (6.1 intézkedés). A beavatkozások során az épületek energiahatékonyságának növelése fontos elemként jelenik meg. A fejlesztéssel érintett ingatlanok energetikai korszerűsítésére 5 éven belül került sor (napelem). Településünk a kedvezményezett járások besorolásáról szóló 290/2014. (XI.26.) számú Korm. rendelet alapján a komplex programmal fejlesztendő Jászapáti járásban található. A fejlesztés eredményeként elért energiamegtak. mértéke az elmúlt 3 év átlagához viszonyítva 20% felett van (50%). A fejlesztéshez nem kapcsolódik élőmunka igény. (Hungarian)
0 references
a.) The aim of the project is to: refurbishment and development of the buildings of the mayor’s office, health centre and library, which is 100 % municipally owned, to reduce greenhouse gas (GHG) emissions from fossil fuels and significantly reduce the cost of operating and maintaining these buildings. The development is considered to be a complex investment on the basis of the call for proposals. B.) The technical and technical content of the project: I. Energy modernisation of the Library building: Heating modernisation (Call 3.1.1(b)): For heating the building, the gas convectors used so far will be completely dismantled and replaced by one Viessmann Vitodens Gas-fired condensing natural gas boiler with a nominal capacity of 26 kW. The new radiators will be equipped with new thermostatic valves with adjustable thermo-heads (up to 6-30 c). Architectural interventions (Call 3.1.1(a)): Inner-side thermal insulation of the walls of the building’s heated space boundary; Thermal insulation of the closing slab to the appropriate value; Refurbishment of the external doors and windows of the building with energy savings, replacement, if necessary, in original sizes, with designs and profiles Accessibility: The accessibility of the building in proportion to the project will be achieved: the complex (physical and info-communication) accessibility of the building’s entrance and toilet by providing access paths for all disability groups. II. Energy modernisation of the Mayor’s Office building: Heating upgrade (point 3.1.2(h)): For heating the building, the gas boilers used so far will be dismantled, 1 Viessmann Vitodens Gas-fired condensed natural gas boiler with a nominal unit output of 45 kW will be installed. Regulating and auxiliary equipment for external weather-dependent control of the boiler is installed. Additional architectural works (point 3.1.1(a)): Extension of the existing thermal insulation of all facades of the building; Thermal insulation of the closing slab (flat roof) to the appropriate value; Lower thermal insulation of basement floor; Refurbishing and replacing the exterior doors and windows of the building in original sizes with design. III. Energy modernisation of the Health House building: Heating upgrade (point 3.1.1(e)): The gas boiler used so far is completely dismantled and replaced by one ecoFOREST ecoGEO HP1 inverter heat pump per unit. Regulating and auxiliary equipment for external weather-dependent control of the heat pump is installed. The HMV will be supplied to the building in the planned condition by the heat pump. (b) Additional architectural works (point 3.1.1(a)): Extension of the existing thermal insulation of all facades of the building; Thermal insulation of the closing slab to the appropriate value; Refurbishment of the exterior doors and windows of the building with energy savings, replacement of glazing in original sizes with design. compliance with the conditions set out in point 3.2 of the notice: The applicant undertakes to comply with the requirements set out in points 3.2 and 3.4 of the Call. The project complies with the equal opportunities and environmental standards set out in point 3.2 of the Call. The project has no foreseeable climate risk. The project has no impact on the status of the water, and no water rights permit is required. The preparation of the technical design documentation and the preparation of the complete project were based on the criteria for the development of the project described in this chapter. D) compliance with the conditions laid down in the substantive assessment criteria of the call: The project meets all evaluation criteria 1.1-1.7, 2.2, 2.3, 3.2, 3.3, 3.4, 4.1 to 4.4, 5.1, 10.1-10.6 The planned project fits the objectives of the TOP, and the need for professional justification and utilisation is appropriate. The project is well founded. Potential risks have been analysed. No renovation of a monumental or locally protected building will take place. The project meets the sustainability criteria. The project fits with projects of other OPs. Investment is not exclusionary for any social group. in the case of a standard procedure, the qualification of the project by area-specific assessment criteria: The resulting development is in line with the current Jász-Nagykun-Szolnok County Regional Development Programme (measure 6.1) at the level of intervention. Increasing the energy efficiency of buildings is an important element in interventions. The energy modernisation of the properties affected by the development took place within 5 years (solar panel). Our settlement is 290/2014 on the classification of the beneficiary districts. It is located in the district of Jászapáti, which is to be developed with the complex programme, on the basis of Government Decree (XI.26.) (XI.26.). The energy consumption achieved as a result of the development is above 20 % (50 %) compared to the average over the last 3 years. There is no need for... (English)
9 February 2022
0 references
a) Le but du projet est de: rénovation et aménagement des bâtiments du bureau du maire, du centre de santé et de la bibliothèque, propriété à 100 % municipale, afin de réduire les émissions de gaz à effet de serre (GES) provenant des combustibles fossiles et de réduire considérablement les coûts d’exploitation et d’entretien de ces bâtiments. Le développement est considéré comme un investissement complexe sur la base de l’appel à propositions. B.) Le contenu technique et technique du projet: I. Modernisation énergétique du bâtiment de la Bibliothèque: Modernisation du chauffage (appel 3.1.1 b)): Pour le chauffage du bâtiment, les convecteurs de gaz utilisés jusqu’à présent seront complètement démontés et remplacés par une chaudière à condensation au gaz de Viessmann Vitodens d’une puissance nominale de 26 kW. Les nouveaux radiateurs seront équipés de nouvelles vannes thermostatiques à têtes thermo-ajustables (jusqu’à 6-30 c). Interventions architecturales (appel 3.1.1 a)): Isolation thermique intérieure des murs de la limite de l’espace chauffé du bâtiment; Isolation thermique de la dalle de fermeture à la valeur appropriée; Rénovation des portes extérieures et des fenêtres du bâtiment avec des économies d’énergie, remplacement, si nécessaire, dans des tailles originales, avec des conceptions et des profils Accessibilité: L’accessibilité du bâtiment en proportion du projet sera atteinte: L’accessibilité complexe (physique et info-communication) de l’entrée et des toilettes du bâtiment en fournissant des chemins d’accès à tous les groupes de personnes handicapées. II. Modernisation énergétique du bâtiment du bureau du maire: Mise à niveau du chauffage (point 3.1.2 h)): Pour le chauffage du bâtiment, les chaudières à gaz utilisées jusqu’à présent seront démontées, 1 Viessmann Vitodens chaudière au gaz naturel condensé à gaz d’une puissance nominale de 45 kW sera installée. Des équipements de régulation et auxiliaires pour la commande externe dépendante des intempéries de la chaudière sont installés. Travaux architecturaux supplémentaires (point 3.1.1 a)): Extension de l’isolation thermique existante de toutes les façades du bâtiment; Isolation thermique de la dalle de fermeture (toit plat) à la valeur appropriée; Isolation thermique inférieure du plancher sous-sol; Rénovation et remplacement des portes et fenêtres extérieures du bâtiment dans des tailles originales avec un design. III. Modernisation énergétique du bâtiment Health House: Mise à niveau du chauffage (point 3.1.1 e)): La chaudière à gaz utilisée jusqu’à présent est complètement démontée et remplacée par une pompe à chaleur écoGEO HP1 Ecoforest par unité. Des équipements de régulation et auxiliaires pour le contrôle externe dépendant des intempéries de la pompe à chaleur sont installés. Le HMV sera livré au bâtiment dans l’état prévu par la pompe à chaleur. b) Travaux architecturaux supplémentaires (point 3.1.1 a)): Extension de l’isolation thermique existante de toutes les façades du bâtiment; Isolation thermique de la dalle de fermeture à la valeur appropriée; Rénovation des portes extérieures et des fenêtres du bâtiment avec des économies d’énergie, remplacement des vitrages dans les tailles originales avec design. respect des conditions énoncées au point 3.2 de l’avis: Le demandeur s’engage à respecter les exigences énoncées aux points 3.2 et 3.4 de l’appel. Le projet est conforme aux normes en matière d’égalité des chances et d’environnement énoncées au point 3.2 de l’appel. Le projet ne présente aucun risque climatique prévisible. Le projet n’a pas d’incidence sur l’état de l’eau et aucun permis d’accès à l’eau n’est requis. La préparation de la documentation de conception technique et la préparation du projet complet ont été fondées sur les critères d’élaboration du projet décrits dans le présent chapitre. D) le respect des conditions fixées dans les critères d’évaluation de fond de l’appel: Le projet répond à tous les critères d’évaluation 1.1-1,7, 2.2, 2.3, 3.2, 3.3, 3.4, 4.1 à 4.4, 5.1, 10,1-10,6 Le projet prévu correspond aux objectifs du TOP, et la nécessité d’une justification et d’une utilisation professionnelles est appropriée. Le projet est bien fondé. Les risques potentiels ont été analysés. Aucune rénovation d’un bâtiment monumental ou protégé localement n’aura lieu. Le projet répond aux critères de durabilité. Le projet s’inscrit dans le cadre des projets d’autres PO. L’investissement n’est pas exclu pour aucun groupe social. dans le cas d’une procédure standard, la qualification du projet selon les critères d’évaluation spécifiques à la zone: Le développement qui en résulte est conforme à l’actuel programme de développement régional du comté de Jász-Nagykun-Szolnok (mesure 6.1) au niveau de l’intervention. L’amélioration de l’efficacité énergétique des bâtiments est un élément important des interventions. La modernisation énergétique des propriétés concernées par le développement a eu lieu dans un délai de 5 ans ... (French)
10 February 2022
0 references
Jászalsószentgyörgy, Jász-Nagykun-Szolnok
0 references
Identifiers
TOP-3.2.1-15-JN1-2016-00066