Building a green city in Balkans (Q3948829): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: fix budget)
(‎Removed claims)
Property / co-financing rate
100.0 percent
Amount100.0 percent
Unitpercent
 
Property / co-financing rate: 100.0 percent / rank
Normal rank
 
Property / budget
300,000,000.0 forint
Amount300,000,000.0 forint
Unitforint
 
Property / budget: 300,000,000.0 forint / rank
Normal rank
 
Property / budget
848,100.0 Euro
Amount848,100.0 Euro
UnitEuro
 
Property / budget: 848,100.0 Euro / rank
Preferred rank
 
Property / budget: 848,100.0 Euro / qualifier
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
 
Property / budget: 848,100.0 Euro / qualifier
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / EU contribution
300,000,000.0 forint
Amount300,000,000.0 forint
Unitforint
 
Property / EU contribution: 300,000,000.0 forint / rank
Normal rank
 
Property / EU contribution
848,100.0 Euro
Amount848,100.0 Euro
UnitEuro
 
Property / EU contribution: 848,100.0 Euro / rank
Preferred rank
 
Property / EU contribution: 848,100.0 Euro / qualifier
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
 
Property / EU contribution: 848,100.0 Euro / qualifier
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 03:20, 15 February 2022

Project Q3948829 in Hungary
Language Label Description Also known as
English
Building a green city in Balkans
Project Q3948829 in Hungary

    Statements

    0 references
    1 January 2019
    0 references
    30 June 2021
    0 references
    BALKÁNY VÁROS ÖNKORMÁNYZATA
    0 references
    0 references

    47°45'10.44"N, 21°50'6.79"E
    0 references
    Jelen támogatási kérelem a Felhívás Területspecifikus melléklet 1.2 pontjában szereplő elkülönített földrajzi célterületi keretek közül a Minden megyei szereplő számára elkülönített indikatív keretösszeg, összes elszámolható költség alapon elnevezésű keretre irányul. Balkány Város Önkormányzata a 2014-2020-as tervezési időszakra elkészítette Integrált Településfejlesztési Stratégiáját. Fejlesztési dokumentumban megfogalmazott cél a fenntartható városfejlesztésen, a helyi gazdaság erősítésén, vonzó, élhető város megteremtésén keresztül a város népességmegtartó erejének növelése. Projektben megvalósuló fejlesztések az ITS tematikus és területi céljaihoz egyaránt hozzájárulnak. Fejlesztés keretében megvalósuló beavatkozások a város négy tematikus céljának eléréséhez hozzájárulnak. A létrehozott zöldfelületek (pihenő parkok, játszótér, szabadtéri kondipálya), valamint a piac fejlesztése kiemelten hozzájárulnak a város „Vonzó városi és táji környezet” (T3) tematikus céljának megvalósulásához. Fejlesztések közvetlenül két (Városközpont városrészi cél: A városközpont központi funkcióinak erősítése, a városi közszolgáltatások fenntartható fejlesztése, vonzó, zöld városközpont kialakítása. (V1); Északnyugati városrészi cél: Fejlett, vonzó lakókörnyezet kialakítása a város népességmegtartó erejének növelése érdekében. (V2)) megvalósulásához járulnak hozzá. Fejlesztésekkel érintett Zöld város akcióterületen a város lakosságának közel 1/5-e él. Az akcióterület korcsoportos megoszlása a városi értékekhez viszonyítva kedvezőtlenebb. A Zöld város akcióterület döntően aktív korú és képzettebb lakosságot tömörít. A felsőfokú végzettséggel rendelkezők aránya a városi érték kétszerese. Akcióterület foglalkoztatottsági jellemzőit vizsgálva megállapíthatjuk, hogy rendszeres munkajövedelemmel nem rendelkezők aránya a városi átlagtól ugyan alacsonyabb. A 2011-es adatok alapján a munkanélküliség az akcióterületet kevésbé sújtja, mint a város egyéb területeit. Felhívás keretében tervezett beavatkozások a város Integrált Településfejlesztési Stratégiájában kijelölt Zöld város akcióterületen valósulnak meg. A fejlesztésekkel érintett akcióterület a város középső területeit foglalja magában. Az akcióterületen megtalálhatók a közigazgatási, közösségi, valamint a gazdasági funkciókat ellátó intézmények, valamint kertvárosias és falusias jellegű lakóövezetek. Akcióterület építészeti örökségekben gazdag (helyi és két országos jelentőségű műemlék található a területen). Megvalósuló fejlesztések: Felhívás 3.1.1 önállóan támogatható tevékenységek A/ Főtevékenység – zöld város kialakítása a) növényfelület, élőhelyek és biodiverzitás növelése, a zöldfelület növényállományának rekonstrukciója, egyszeri beavatkozásként gyomirtás/beteg fák eltávolítása, valamint ápolási munkák – Kossuth kert, kondi park, játszótér füvesítése d) városi aktív rekreációs zöldterületek (városi tanösvény, tanpálya, futópálya, kutyafuttató, játszótér, szabadtéri tornapálya stb.) kialakítása – kondi park, játszótér kialakítása C/ Főtevékenység – gazdaságélénkítés a) helyi termékek számára piaci terület (városi, helyi piac, vásárcsarnok) kialakítása és az alapműködéshez szükséges tárgyi eszközbeszerzés – piac fejlesztése 3.1.2 önállóan nem támogatható tevékenységek a) zöld infrastruktúra hálózat rekonstrukcióját, kialakítását megalapozó települési zöld infrastruktúra hálózat felmérése, térképezése, fejlesztési- és fenntartási akcióterv készítése – akcióterv elkészítése g) teljes rétegrendjében vízáteresztő burkolatú (pl.: gyöngykavics, murva, mulcs-borítású, stb.) sétautak nyomvonal rekonstrukciója, felújítása (murva, stabilizált zúzottkő vagy mulcsborítással, egyéb vízáteresztő burkolatokkal), teljes rétegrendjében vízáteresztő burkolatú sétautak létesítése, kialakítása nem vízáteresztő burkolat cseréje vagy kiváltása céljából, burkolatjavítás - térkövezés i) a terület rendeltetésszerű használathoz szükséges eszközbeszerzés (környezetbe illő, minőségi utcabútorok elhelyezése stb.) – utcabútorok kihelyezése 5. Önkormányzati tulajdonú vagy tulajdonba kerülő, korszerű, energiatakarékos közvilágítás kialakítása, korszerűsítése, elektromos hálózat és távközlési légvezetékek rendezett terepszint alá helyezése az akcióterületi zöldterület megújítása vonatkozásában. – kandalláberek 7. A közbiztonság javítását, a fejlesztés eredményeinek megőrzését, fenntartását szolgáló infrastrukturális fejlesztések. – kamerarendszer 3.1.3 Önállóan nem támogatható, kötelezően megvalósítandó tevékenységek a) Energiahatékonysági intézkedések – energiatakarékos közvilágítás b) Szórt azbeszt mentesítése – nem releváns c) Akadálymentesítés – minden fejlesztés akadálymentesen kerül kialakításra d) Nyilvánosság biztosítása – kötelező nyilvánosság Széchenyi 2020 KTK szerint e) Partnerségi tervezés – lakossági workshop, tervpályázat f) Infrastrukturális, beruházás jellegű fejlesztéseket kiegészítő „soft” elemek – Zöld város nap lebonyolítása, környezettudatosság (Hungarian)
    0 references
    The present grant application concerns the indicative allocation for all county actors, based on the total eligible costs, of the specific geographic envelopes set out in point 1.2 of the Call for Area-specific Annex. The Municipality of Balkans has prepared its Integrated Urban Development Strategy for the 2014-2020 programming period. The goal set out in the Development Paper is to increase the capacity of the city to retain its population through sustainable urban development, strengthening the local economy and creating an attractive, liveable city. Developments in the project contribute to both the thematic and territorial objectives of the ITS. Development interventions contribute to the achievement of the city’s four thematic objectives. The creation of green spaces (rest parks, playgrounds, outdoor gymnastics) as well as the development of the market contribute to the realisation of the city’s thematic objective of the “Contracting urban and landscape environment” (T3). Developments directly into two (City Centre goal: Strengthening the central functions of the city centre, the sustainable development of urban public services, and the creation of an attractive green city centre. (V1); North-West Town Target: Developing an advanced, attractive living environment to increase the city’s population retention power. (V2) contribute to its realisation. In the green city action area affected by developments, nearly 1/5 of the population of the city lives. The age group distribution of the action area is less favourable compared to urban values. The Green City action area consists of a predominantly active and more educated population. The share of tertiary graduates is twice the urban value. Looking at the employment characteristics of the action area, it can be concluded that the share of people without regular work income is lower than the urban average. According to 2011 data, unemployment affects the action area less than other areas of the city. The interventions planned under the call will be implemented in the Green City Action Area designated by the City’s Integrated Urban Development Strategy. The action area affected by the development covers the central areas of the city. The action area includes administrative, community and economic institutions, as well as suburban and rural residential areas. The action area is rich in architectural heritage (local and two national monuments). Developments implemented: Call 3.1.1 Self-eligible activities A/Main activity — development of a green city (a) increasing the area of plants, habitats and biodiversity, reconstructing the plant stock of the green surface, removing weed control as a one-time intervention, and nursing work — Kossuth garden, gym park, playground grassland d) urban active recreational green areas (urban educational path, training track, runway, dog runway, dog runner, etc.), development of a playground, open-air gymnastics field, etc.) — gym park, playground development C/Main activity — economic recovery a) development of a market area for local products (urban, local market, market hall) and acquisition of physical equipment necessary for basic operation — development of the market 3.1.2 Ineligible activities (a) surveying and mapping of the urban green infrastructure network underpinning the reconstruction and development of a green infrastructure network, drawing up a development and maintenance action plan — preparation of action plan g) with water permeable covering (e.g.: reconstruction and refurbishment of walking paths (with Murva, stabilised crushed or mulch coverings, other permeable coverings), the construction of walking paths with permeable coverings in the whole layer, construction or replacement of non-permeable coverings, paving repairs — spatial stone i) the purchase of equipment necessary for the proper use of the area (placement of high-quality street furniture suitable for the environment, etc.) — placing of street furniture 5. Development and modernisation of state-of-the-art, energy-saving public lighting owned or acquired by local governments, and the placing of electrical networks and telecommunication overhead lines below the orderly terrain level in relation to the renewal of the green area in the action area. — candallegers 7. Infrastructural developments aimed at improving public safety, preserving and maintaining the results of the development. — camera system 3.1.3 Compulsory activities (a) Energy efficiency measures — energy-saving public lighting b) Exemption of scattered asbestos — non-relevant c) Accessibility — all developments will be seamlessly established d) Publicity — mandatory public according to Széchenyi 2020 KTK e) Partnership design — residential workshop, design contest f) “soft” elements complementing infrastructure and investment-like developments — Green City Day, environmental awareness (English)
    9 February 2022
    0 references
    La présente demande de subvention concerne l’allocation indicative pour tous les acteurs du comté, sur la base du total des coûts éligibles, des enveloppes géographiques spécifiques définies au point 1.2 de l’annexe relative à l’appel à propositions. La municipalité des Balkans a élaboré sa stratégie intégrée de développement urbain pour la période de programmation 2014-2020. L’objectif fixé dans le document sur le développement est d’accroître la capacité de la ville à conserver sa population grâce au développement urbain durable, au renforcement de l’économie locale et à la création d’une ville attrayante et habitable. L’évolution du projet contribue à la fois aux objectifs thématiques et territoriaux des STI. Les interventions de développement contribuent à la réalisation des quatre objectifs thématiques de la ville. La création d’espaces verts (parcs de repos, aires de jeux, gymnastique extérieure) ainsi que le développement du marché contribuent à la réalisation de l’objectif thématique de la ville de «Contrôler l’environnement urbain et paysager» (T3). Évolution directe en deux (objectif du centre-ville: Renforcer les fonctions centrales du centre-ville, le développement durable des services publics urbains et la création d’un centre-ville vert attrayant. (V1); Ville du Nord-Ouest Cible: Développer un environnement de vie avancé et attrayant pour accroître le pouvoir de rétention de la population de la ville. (V2) contribuer à sa réalisation. Dans la zone d’action de la ville verte touchée par les développements, près d’un cinquième de la population de la ville vit. La répartition par groupe d’âge de la zone d’action est moins favorable que les valeurs urbaines. La zone d’action Green City se compose d’une population majoritairement active et plus instruite. La part des diplômés de l’enseignement supérieur est deux fois supérieure à la valeur urbaine. Si l’on examine les caractéristiques de l’emploi dans la zone d’action, on peut conclure que la proportion de personnes sans revenu régulier de travail est inférieure à la moyenne urbaine. Selon les données de 2011, le chômage affecte moins la zone d’action que les autres zones de la ville. Les interventions prévues dans le cadre de l’appel seront mises en œuvre dans la zone d’action «Ville verte» désignée par la stratégie de développement urbain intégré de la ville. La zone d’action concernée par le développement couvre les zones centrales de la ville. La zone d’action comprend des institutions administratives, communautaires et économiques, ainsi que des zones résidentielles suburbaines et rurales. La zone d’action est riche en patrimoine architectural (monuments locaux et deux monuments nationaux). Développements mis en œuvre: Appel 3.1.1 Activités auto-admissibles Activité principale — développement d’une ville verte (a) augmentation de la superficie des plantes, des habitats et de la biodiversité, reconstruction du parc végétal de la surface verte, élimination de la lutte contre les mauvaises herbes à titre d’intervention ponctuelle et travail d’infirmerie — jardin Kossuth, parc de gymnase, prairie de terrain de jeux d) zones urbaines actives de loisirs verts (piste éducative urbaine, piste d’entraînement, piste de piste, piste de chien, coureur de chiens, etc.), développement d’une aire de jeux, terrain de gymnastique en plein air, etc.) — parc de gymnastique, aménagement d’une aire de jeux C/principale activité — relance économique a) développement d’une zone de marché pour les produits locaux (urbain, marché local, hall de marché) et acquisition d’équipements physiques nécessaires à l’exploitation de base — développement du marché 3.1.2 Activités inéligibles a) étude et cartographie du réseau d’infrastructures vertes urbaines qui sous-tendent la reconstruction et le développement d’un réseau d’infrastructures vertes, élaboration d’un plan d’action de développement et d’entretien — préparation d’un plan d’action g) avec couverture perméable à l’eau (par exemple: reconstruction et remise en état de sentiers pédestres (avec Murva, revêtements stabilisés broyés ou paillis, autres revêtements perméables), construction de chemins de randonnée avec revêtements perméables dans toute la couche, construction ou remplacement de revêtements non perméables, réparations de revêtements — pierre spatiale i) achat d’équipements nécessaires à la bonne utilisation de la zone (placement d’un mobilier urbain de haute qualité adapté à l’environnement, etc.) — placement de mobilier urbain 5. Le développement et la modernisation de l’éclairage public de pointe et économe en énergie appartenant ou acquis par les collectivités locales, ainsi que la mise en place de réseaux électriques et de lignes aériennes de télécommunications en dessous du niveau ordonné du terrain par rapport au renouvellement de l’espace vert dans la zone d’action. — candallegers 7. Développements infrastructurels visant à améliorer la sécurité publique, à préserver et à maintenir les résultats d... (French)
    10 February 2022
    0 references
    Balkány, Szabolcs-Szatmár-Bereg
    0 references

    Identifiers

    TOP-2.1.2-15-SB1-2017-00036
    0 references