NIF Zrt. preparation of railway infrastructure development projects (Q3943037): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: fix budget)
(‎Removed claims)
Property / co-financing rate
78.74 percent
Amount78.74 percent
Unitpercent
 
Property / co-financing rate: 78.74 percent / rank
Normal rank
 
Property / budget
5,792,470,000.0 forint
Amount5,792,470,000.0 forint
Unitforint
 
Property / budget: 5,792,470,000.0 forint / rank
Normal rank
 
Property / budget
16,375,312.69 Euro
Amount16,375,312.69 Euro
UnitEuro
 
Property / budget: 16,375,312.69 Euro / rank
Preferred rank
 
Property / budget: 16,375,312.69 Euro / qualifier
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
 
Property / budget: 16,375,312.69 Euro / qualifier
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / EU contribution
4,561,000,000.0 forint
Amount4,561,000,000.0 forint
Unitforint
 
Property / EU contribution: 4,561,000,000.0 forint / rank
Normal rank
 
Property / EU contribution
12,893,947.0 Euro
Amount12,893,947.0 Euro
UnitEuro
 
Property / EU contribution: 12,893,947.0 Euro / rank
Preferred rank
 
Property / EU contribution: 12,893,947.0 Euro / qualifier
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
 
Property / EU contribution: 12,893,947.0 Euro / qualifier
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 01:53, 15 February 2022

Project Q3943037 in Hungary
Language Label Description Also known as
English
NIF Zrt. preparation of railway infrastructure development projects
Project Q3943037 in Hungary

    Statements

    0 references
    18 June 2020
    0 references
    31 December 2023
    0 references
    NIF Nemzeti Infrastruktúra Fejlesztő zártkörűen működő Részvénytársaság
    0 references
    0 references

    46°15'16.67"N, 20°8'54.96"E
    0 references
    Szeged - Makó vasúti elővárosi közlekedés fejlesztésének előkészítése A Szeged (Újszeged) – Makó vasútvonali kapcsolat jelenleg kedvezőtlen, melynek egyik fő oka az egykor létező szegedi vasúti Tisza-híd hiánya. Ezen felül a vonalszakasz utolsó korszerűsítése több évtizeddel ezelőtt történt, az infrastruktúra mára teljesen leromlott állapotú, a teljes szakaszon sebességkorlátozás van érvényben. Az egykori híd megépítésével a 121. számú vasútvonal csatlakoztatható a központi szerepű Szeged vasútállomáshoz, emellett a vasútvonal korszerűsítésével és az elővárosi vasúti közlekedés fejlesztésével a vonal hálózati szerepe felértékelődik. Az új Tisza-híd és vasúti kapcsolat létesítése mellett tervezetten megszűnne Újszeged állomás és az oda vezető vonalszakasz, helyette az új nyomvonalon új megállóhely létesülne. A beruházással párhuzamosan tervezetten kiépülne a Bécsi körút és a Temesvári körút közvetlen közúti kapcsolata. A szegedi belterületi gyűrűs-sugaras főúthálózat új eleme pedig közvetlen átjárási lehetőséget biztosítana majd az eddig kvázi elvágott településrészek között. A tervezett vasúti és buszközlekedést kiszolgáló, P+R parkolót is magában foglaló forgalmi csomópont célja javítani a Szeged várost érintő helyközi, távolsági közösségi közlekedési szolgáltatások együttműködését és színvonalát. A fejlesztés hatására a Szeged és Makó közötti forgalom jelentős részben a környezetbarát, gyors vasúti kapcsolatra terelhető, valamint lehetőség nyílik Makó távolsági hálózatba történő bekapcsolására is. Az autóbuszok a jövőben kiegészítő hálózati szerepet láthatnak el, a vasútvonalról nem vagy rosszul elérhető kistelepülések kiszolgálásával. A projekt cél elérése érdekében az ITM elrendelése alapján NIF Zrt. feladata az előkészítés első lépéseként MT készítése. Ezzel összefüggésben többek között a korábban Szeged megyei jogú város megbízásából elkészült MT-k felülvizsgálata, a felülvizsgálatokban foglalt műszaki tartalmi elemeknek a frissített forgalmi vizsgálatok eredményeihez való hangolása, üzemeltetési és közszolgáltatási koncepció elkészítése, figyelembe véve pl. a 2015-2020 közötti években megvalósult, valamint a jövőben tervezett gazdasági-, közlekedés-, valamint területfejlesztési projekteket, az azóta bekövetkezett forgalomfejlődési trendeket. További feladat az elkészíteni kívánt MT eredménye alapján engedélyezési tervek elkészítése, a szükséges engedélyek megszerzése, valamint a későbbi kivitelezési közbeszerzési eljárás lefolytatásához szükséges tendertervek és tenderdokumentáció összeállítása. Hatvan – Füzesabony vonal fejlesztéséhez kapcsolódó ráhordó vonalak fejlesztésének előkészítése Az ITM korábban elrendelte a NIF Zrt. részére a vasútprogram projekt-előkészítési feltételes közbeszerzési eljárások lefolytatását, figyelembe véve az ITM projektjavaslatainak a CEF 2019. évi pályázati kiírására történő benyújtásáról szóló 1059/2020. (II. 25.) Korm. határozat szerint benyújtott pályázatokat. A tárgyi előkészítési feladat által érintett projekt a Hatvan – Füzesabony vasúti vonal csatlakozó vonalszakaszainak, azaz a - Hatvan – Újszász vasútvonal - Vámosgyörk – Gyöngyös vasútvonal - Füzesabony – Eger-Felnémet vasúti vonalszakasz korszerűsítése a Budapest – Miskolc – Nyíregyháza – Záhony vasútvonal 2018-ban elkészült fejlesztési stratégiájával (Master Plan) összhangban. A VIF/105248/2019-ITM elrendelés alapján 2020. májusban elkészült MT által indikált műszaki tartalommal. Az elkészített MT eredménye alapján feladat a kiválasztott változatra az engedélyezési tervek elkészítése, a szükséges engedélyek megszerzése, valamint a későbbi kivitelezési közbeszerzési eljárás lefolytatásához szükséges tendertervek és tenderdokumentáció összeállítása, a kiviteli tervek elkészítésére vonatkozó lehetőség biztosítása mellett. Projekt keretében megvalósuló tevékenységek: Hatvan – Füzesabony: 2020.10.27: Tervező kiválasztására irányuló AF megjelenése 2021.06.30: Tervezési szerződések megkötése 2022.08.31: Környezetvédelmi engedélyek megszerzéséhez szükséges dokumentumok elkészítése (KHT, klímakockázati értékelés, hatásbecslés, Natura 2000 határozat, vízkeretirányelvre vonatkozó nyilatkozat) 2022.09.30: Engedélyezési tervek elkészítése 2022.12.31: Kivitelezés megindításához szükséges engedélyek megszerzése (Építési engedély, környezetvédelmi engedély) 2023.07.31: Tendertervek és tenderdokumentáció elkészítése Szeged – Makó projektelem: 2021.08.31: RMT és CBA felülvizsgálata 2021.11.30: Tervező kiválasztására irányuló AF megjelenése 2022.06.30: Tervezési szerződés megkötése 2022.11.30: Környezetvédelmi engedélyek megszerzéséhez szükséges dokumentumok elkészítése 2022.12.31: Engedélyezési tervek elkészítése 2023.03.31: Kivitelezés megindításához szükséges engedélyek megszerzése 2023.08.31: Tendertervek és tenderdokumentáció elkészítése 2023.12.31: Projekt fizikai befejezése A klímakockázati elemzések a környezeti hatástanulmány dokumentáció részeként készülnek el. (Hungarian)
    0 references
    Szeged — Makó railway transport development preparation Szeged (Újszeged) — Makó railway line connection is currently unfavourable, one of the main reasons for which is the lack of a former Szeged railway Tisza bridge. In addition, the last upgrade of the line section took place several decades ago, the infrastructure is now completely degraded and there is a speed limit on the entire section. With the construction of the former bridge, railway line 121 can be connected to the central Szeged railway station. In addition, the upgrading of the railway line and the development of suburban railway transport will enhance the network role of the line. In addition to the establishment of the new Tisza-bridge and railway link, Újszeged station and the line section leading to it would be abolished, instead a new stop point would be created on the new route. In parallel with the investment, the direct road connection between the Vienna boulevard and Timișoara boulevard would be established. The new element of the Szeged inland ring-jet main road network would provide direct access between the parts of the settlements that have been quasi-cut. The aim of the traffic node, including P+R car park, serving the planned rail and bus transport is to improve the cooperation and quality of interurban, long-distance public transport services affecting the city of Szeged. Due to the development, traffic between Szeged and Makó can be shifted to a significant part of the environmentally friendly, fast railway connection, as well as the possibility to connect Makó to the long-distance network. Buses can play an additional network role in the future by serving small settlements that are not or are poorly accessible from the railway line. In order to achieve the project objective, NIF Zrt.'s task is to prepare MT as the first step of the preparation on the basis of the order of the ITM. In this context, the revision of the MTs previously commissioned by the City of Szeged county law, the alignment of the technical elements contained in the reviews with the results of the updated traffic tests, the preparation of an operating and public service concept, taking into account e.g. the economic, transport and land development projects planned in the years 2015-2020, and the traffic development trends that have occurred since then, are among others. Another task is to draw up licensing plans based on the results of the planned MT, to obtain the necessary permits, and to compile tender plans and tender documentation necessary for the conduct of the subsequent implementation procurement procedure. 60 — Preparation of the development of load lines related to the development of the Füzesabony line The ITM ordered NIF Zrt. to carry out conditional public procurement procedures for project preparation of the railway programme, taking into account the submission of ITM project proposals for the 2019 CEF call for proposals 1059/2020. (II. 25.) Applications submitted in accordance with Government Decision. The project concerned by the technical preparation task is the upgrading of the connecting line sections of the Hatvan — Füzesabony railway line, i.e. the — Hatvan — Újszász railway line — Vámosgyörk — Gyöngyös railway line — Füzesabony — Eger-FelGerman railway line in line with the Master Plan of the Budapest — Miskolc — Nyíregyháza — Záhony railway line. Based on order VIF/105248/2019-ITM, the technical content indicated by MT was completed in May 2020. Based on the result of the prepared MT, the task for the selected version is to prepare the permit plans, obtain the necessary permits and compile the tender plans and tender documentation necessary for the subsequent implementation procurement procedure, while providing the possibility to prepare the construction plans. Project activities: Sixty — Füzesabony: 2020.10.27: Appearance of AF for the selection of designer 30/06/2021: Conclusion of planning contracts 31/08/2022: Preparation of documents for obtaining environmental permits (EIA, Climate Risk Assessment, Impact Assessment, Natura 2000 Decision, Water Framework Directive Declaration) 30/09/2010: Preparation of authorisation plans 31.12.2022: Obtaining the necessary permits to initiate works (Building permit, environmental permit) 31.7. 2023: Preparation of tender plans and tender documentation Szeged — Makó project element: 2021.08.31: Review of RMT and CBA 30.11.2021: Appearance of AF for the selection of designer 30 June 2022: Conclusion of a planning contract 30.11.2022: Preparation of documents for obtaining environmental permits 31.12.2022: Preparation of authorisation plans 31.03.23: Obtaining the necessary permits to start works 31 August 2023: Preparation of tender plans and tender documentation 31.12. 2023: Physical completion of the project Climate risk analyses are carried out as part of the environmental impact assessment documentation. (English)
    9 February 2022
    0 references
    Szeged — Makó préparation au développement du transport ferroviaire Szeged (Újszeged) — La connexion de la ligne de chemin de fer Makó est actuellement défavorable, l’une des principales raisons étant l’absence d’un ancien pont ferroviaire de Tisza. En outre, la dernière mise à niveau de la section de la ligne a eu lieu il y a plusieurs décennies, l’infrastructure est maintenant complètement dégradée et il y a une limite de vitesse sur l’ensemble du tronçon. Avec la construction de l’ancien pont, la ligne de chemin de fer 121 peut être reliée à la gare centrale de Szeged. En outre, la modernisation de la ligne de chemin de fer et le développement du transport ferroviaire suburbain renforceront le rôle de réseau de la ligne. Outre la mise en place du nouveau pont de Tisza et de la liaison ferroviaire, la gare d’Újszeged et le tronçon de ligne menant à celle-ci seraient supprimés, mais un nouveau point d’arrêt serait créé sur la nouvelle ligne. Parallèlement à l’investissement, la liaison routière directe entre le boulevard Vienne et le boulevard Timișoara serait établie. Le nouvel élément du réseau routier principal à jet interurbain de Szeged fournirait un accès direct entre les parties des colonies qui ont été quasi coupées. L’objectif du nœud de circulation, y compris le parking P+R, desservant le transport ferroviaire et par autobus prévu est d’améliorer la coopération et la qualité des services de transports publics interurbains longue distance qui touchent la ville de Szeged. En raison du développement, le trafic entre Szeged et Makó peut être déplacé vers une partie importante de la liaison ferroviaire rapide et respectueuse de l’environnement, ainsi que la possibilité de relier Makó au réseau longue distance. Les autobus peuvent jouer un rôle supplémentaire dans le réseau à l’avenir en desservant de petits établissements qui ne sont pas ou sont mal accessibles à partir de la ligne de chemin de fer. Afin d’atteindre l’objectif du projet, la mission de NIF Zrt. est de préparer MT comme première étape de la préparation sur la base de l’ordre de l’IMT. Dans ce contexte, la révision des MT précédemment commandée par la loi du comté de Szeged, l’alignement des éléments techniques contenus dans les examens sur les résultats des essais de circulation actualisés, l’élaboration d’un concept d’exploitation et de service public, en tenant compte, par exemple, des projets économiques, de transport et d’aménagement du territoire prévus pour les années 2015-2020, et des tendances de développement du trafic qui se sont produites depuis lors, sont entre autres. Une autre tâche consiste à élaborer des plans d’octroi de licences sur la base des résultats du MT prévu, à obtenir les autorisations nécessaires et à établir les plans d’appel d’offres et les documents d’appel d’offres nécessaires à la conduite de la procédure de passation de marché ultérieure. 60 — Préparation du développement des lignes de charge liées au développement de la ligne Füzesabony L’IMT a ordonné à NIF Zrt. d’effectuer des procédures de passation de marchés publics conditionnelles pour la préparation du projet du programme ferroviaire, en tenant compte de la soumission des propositions de projets ITM pour l’appel à propositions no 1059/2020 du MIE 2019. (II. 25.) Demandes présentées conformément à la décision du gouvernement. Le projet concerné par la tâche de préparation technique est la modernisation des tronçons de ligne de raccordement de la ligne de chemin de fer Hatvan — Füzesabony, c’est-à-dire la ligne de chemin de fer — Hatvan — Újszászás — Vámosgyörk — Gyöngyös — Füzesabony — ligne ferroviaire Eger-Fel German conformément au plan directeur de la ligne de chemin de fer Budapest — Miskolc — Nyíregyháza — Záhony. Sur la base de la commande VIF/105248/2019-ITM, le contenu technique indiqué par MT a été achevé en mai 2020. Sur la base des résultats du MT préparé, la tâche de la version sélectionnée est d’établir les plans d’autorisation, d’obtenir les autorisations nécessaires et de compiler les plans d’appel d’offres et les documents d’appel d’offres nécessaires à la procédure de passation de marché ultérieure, tout en offrant la possibilité d’élaborer les plans de construction. Activités du projet: Soixante — Füzesabony: 2020.10.27: Apparence de l’AF pour la sélection du designer 30/06/2021: Conclusion des contrats de planification 31/08/2022: Préparation des documents pour l’obtention de permis environnementaux (EIE, évaluation des risques climatiques, analyse d’impact, décision Natura 2000, déclaration de la directive-cadre sur l’eau) 30/09/2010: Préparation des plans d’autorisation 31.12.2022: Obtenir les permis nécessaires pour entreprendre des travaux (permis de construction, permis d’environnement) 31.7. 2023: Préparation des plans d’appel d’offres et de la documentation de l’appel d’offres Szeged — Élément de projet Makó: 2021.08.31: Examen du RMT et de l’ABC 30.11.2021: Apparition de l’AF pour la sélection du designer 30 juin ... (French)
    10 February 2022
    0 references
    Szeged, Csongrád-Csanád
    0 references

    Identifiers

    IKOP-3.2.0-15-2020-00036
    0 references