Support for the energy supply of Vince Szabó’s site with solar-powered renewable energy generation system (Q3934910): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: fix budget) |
(Removed claims) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 55.0 percent / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 13,749,559.0 forint / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 38,870.0 Euro / rank | |||||||||||||||
Property / budget: 38,870.0 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 38,870.0 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 7,562,257.0 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 21,378.5 Euro / rank | |||||||||||||||
Property / EU contribution: 21,378.5 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 21,378.5 Euro / qualifier | |||||||||||||||
|
Revision as of 22:50, 14 February 2022
Project Q3934910 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Support for the energy supply of Vince Szabó’s site with solar-powered renewable energy generation system |
Project Q3934910 in Hungary |
Statements
1 October 2020
0 references
31 December 2021
0 references
Szabó Vince
0 references
A fejlesztés eredményeként létrejön egy 40,8 kWp teljesítményű napelem rendszer, mely 136 db Canadiansolar CS3k 300 W napelemből, 2 db Fronius Symo 20.0-3-M inverterből és a szükséges kiegészítőkből (tartószerkezetek; oldali túlfeszültség védelem, kábelezés) áll. A kettő darab inverter esővédő tető alatt kerül elhelyezésre a legmegfelelőbb biztonság érdekében. A napelemek telepítése során összesen 8 db string kerül elhelyezésre, stringenként 17-17 db napelem elhelyezésével, így kerül telepítésre, ezzel a kiosztással összesen 136 db napelemes modul. A projekt keretében 1 célterületen kerül megvalósításra a fejlesztés, mégpedig a napelemes rendszer telepítése hálózati villamosenergia-termelés céljából. A rendszer telepítésével éves szinten megtermelhető villamos energia mennyisége a projekt megvalósítási helyszínére vetítve 44.880 kWh, mely az éves 47.155 kWh villamos energia igény 95,18 %-a. Ez a megtakarítás jelentős mértékű és jelentős mértékben mutatkozik a vállalkozás kiadásainak megtakarítása során is. A projekt megvalósítása révén az üvegházhatású gázok becsült éves csökkenése 33,76 t/év. Az energiahatékonysági fejlesztések által elért primer energia felhasználás csökkenés 242,35 GJ/év. Projekt lépései: I. előkészítés: megtörtént az épület tetőszerkezetének statikai felülvizsgálata a napelemes rendszer elhelyezése miatt, melyet mellékeltünk támogatási kérelmünkkel együtt. Napelemes rendszerek telepítésével foglalkozó vállalkozás felmérte a projekt tárgyát képező beruházás elemeit és megtette ajánlatát. Energetikai szakértő megvizsgálta a projektet és kiállította a szakértői nyilatkozatot. II. támogatási kérelem benyújtása: a támogatási kérelem benyújtása megtörtént. III. projekt megvalósítása. Ebben a fázisban történik a kivitelező kiválasztása, majd szerződéskötés a kivitelezővel és a műszaki ellenőrrel. Ebben a fázisban kerül kiépítésre a napelemes rendszer. IV. Projekt zárása. A kivitelezés megvalósítása után megtörténik az átadás-átvétel, a szükséges dokumentáció elvégzése, majd azt követően a támogatás elszámolása. A vállalkozás és annak menedzsmentje jelentős tapasztalattal rendelkezik az EU és a Magyarország kormánya társfinanszírozásában megvalósuló projektek megvalósításában. A vállalkozás rendelkezik több mint 13 év tapasztalattal rendelkező projektmenedzser külső szolgáltatóval, akinek közreműködésével bonyolítja le, valósítotja meg sikeresen projektjét, amennyiben támogatásra ítélik jelen projektet. A napelem modulok leadott teljesítménye a jól prognosztizálható a meteorológiai megfigyelések, működésmód ismeretében a megtérülés és a haszon előre kiszámolható. A mostani árakon számolva minőségi anyagokból összeszerelt rendszer megtérülése 4-5 év. A rendszer a mellékelt helyszínrajz szerint kerül kiépítésre. A kiépítendő napelemes rendszer kizárólag a használatunkban lévő fejlesztéssel érintett telephely energetikai rendszerét fogja ellátni. Az épület tetőszerkezete megfelelő állékonyságú, a napcellák elhelyezésére alkalmas. Az elhelyezésre szánt épület fő tartószerkezeti elemei a tömbalapokba befogott, HH szelvényű acél oszlopok 3-4 m-enkénti állástávolságonként, és a kéttámaszú HH szelvényekből hegesztett és csavaros kötésekkel összeállított acél rácsos főtartók, nyeregtetős tetőidommal (tetőhajlás ~ 30%), ereszmagasság ~ 6.0 m. Másodlagos teherviselő szerkezetek többtámaszú gerendák 1.0-1.40 m tengelytávolságú HH szelvényekből, a főtartók felső övéhez hegesztett szelementartó bakokhoz csavaros kapcsolattal rögzítve. (Hungarian)
0 references
The development will result in the creation of a 40,8 kWp solar system consisting of 136 Canadiansolar CS3k 300 W solar panels, 2 Fronius SYMO 20.0-3-M inverters and the necessary accessories (support structures; side overvoltage protection, cabling). The two inverters are placed under a rain protection roof for the most appropriate safety. During the installation of solar panels, a total of 8 strings will be placed, with the placement of 17-17 solar panels per string, so it will be installed, with this allocation a total of 136 solar modules will be installed. Within the framework of the project, the development will be carried out in 1 target area, namely the installation of the solar system for the production of electricity in the grid. The annual amount of electricity generated by the installation of the system is 44.880 kWh per project implementation site, which is 95.18 % of the annual electricity demand of 47.155 kWh. This saving is significant and significantly reflected in the savings of the company’s expenses. The estimated annual reduction of greenhouse gases through the implementation of the project is 33.76 tons/year. The reduction in primary energy consumption achieved by energy efficiency improvements is 242.35 GJ/year. Project steps: I. preparation: a static review of the roof structure of the building has been carried out due to the installation of the solar system, which we have attached together with our request for support. The company installing solar panels assessed the elements of the investment that was the subject of the project and submitted its offer. An energy expert examined the project and issued the expert statement. II. submission of aid application: the aid application has been submitted. Implementation of project III. At this stage, the contractor is selected and then contracted with the contractor and the technical inspector. In this phase, the solar system will be installed. IV. Closing the project. After the implementation of the works, the handover and the necessary documentation are carried out, and the grant is then cleared. The company and its management have considerable experience in implementing projects co-financed by the EU and the Government of Hungary. The company has a project manager with more than 13 years of experience with external service providers, with whom it manages and successfully implements its project if the present project is awarded for funding. The power output of solar modules can be well predicted by meteorological observations, and the return and profit can be calculated in advance. The return on the system assembled from quality materials at current prices is 4-5 years. The system will be installed according to the attached site plan. The solar system to be built will only supply the energy system of the site affected by the development in our use. The roof structure of the building has sufficient stability and is suitable for the installation of solar cells. The main structural elements of the building intended for installation are the HH-section steel columns in block bases per 3-4 m standing distance, and the steel main lattice brackets welded from two support HH sections and assembled with screw-jointed joints, with saddle roofing (top bending ~ 30 %), eaves height ~ 6.0 m. Secondary load-bearing structures are multi-support beams made of HH sections with a shaft spacing of 1.0-1.40 m, fastened to the top belt of the main brackets with a screw connection. (English)
8 February 2022
0 references
Le développement aboutira à la création d’un système solaire de 40,8 kWp composé de 136 panneaux solaires canadiens Solar CS3k 300 W, de 2 onduleurs Fronius SYMO 20,0-3-M et des accessoires nécessaires (structures de soutènement; protection contre les surtensions latérales, câblage). Les deux onduleurs sont placés sous un toit de protection contre la pluie pour la sécurité la plus appropriée. Lors de l’installation de panneaux solaires, un total de 8 cordes sera placé, avec le placement de 17-17 panneaux solaires par chaîne, il sera donc installé, avec cette allocation un total de 136 modules solaires seront installés. Dans le cadre du projet, le développement sera réalisé dans une zone cible, à savoir l’installation du système solaire pour la production d’électricité dans le réseau. La quantité annuelle d’électricité produite par l’installation du réseau est de 44,880 kWh par site de mise en œuvre du projet, ce qui représente 95,18 % de la demande annuelle d’électricité de 47,155 kWh. Cette économie est significative et se reflète de manière significative dans les économies de dépenses de l’entreprise. La réduction annuelle des gaz à effet de serre grâce à la mise en œuvre du projet est estimée à 33,76 tonnes/an. La réduction de la consommation d’énergie primaire obtenue par l’amélioration de l’efficacité énergétique est de 242,35 GJ/an. Étapes du projet: I. préparation: un examen statique de la structure du toit du bâtiment a été effectué en raison de l’installation du système solaire, que nous avons joint à notre demande de soutien. La société qui installe des panneaux solaires a évalué les éléments de l’investissement qui a fait l’objet du projet et a présenté son offre. Un expert de l’énergie a examiné le projet et publié une déclaration d’expert. II. présentation de la demande d’aide: la demande d’aide a été introduite. Mise en œuvre du projet III. À ce stade, l’entrepreneur est sélectionné puis engagé par contrat avec le contractant et l’inspecteur technique. Dans cette phase, le système solaire sera installé. IV. Clôture du projet. Après la mise en œuvre des travaux, le transfert et la documentation nécessaire sont effectués, et la subvention est alors apurée. L’entreprise et sa direction disposent d’une expérience considérable dans la mise en œuvre de projets cofinancés par l’UE et le gouvernement hongrois. L’entreprise a un chef de projet avec plus de 13 ans d’expérience avec des prestataires de services externes, avec qui elle gère et met en œuvre avec succès son projet si le présent projet est attribué pour un financement. La puissance des modules solaires peut être bien prédite par des observations météorologiques, et le rendement et le profit peuvent être calculés à l’avance. Le retour sur le système assemblé à partir de matériaux de qualité aux prix courants est de 4-5 ans. Le système sera installé conformément au plan de site joint. Le système solaire à construire ne fournira que le système énergétique du site concerné par le développement de notre utilisation. La structure du toit du bâtiment a une stabilité suffisante et convient à l’installation de cellules solaires. Les principaux éléments structurels du bâtiment destinés à l’installation sont les colonnes en acier de section HH dans des bases de blocs sur 3-4 m de distance debout, et les supports de treillis principaux en acier soudés à partir de deux sections de support HH et assemblés avec des joints collés par vis, avec la toiture de selle (flexion supérieure ~ 30 %), hauteur de l’avant-toit ~ 6,0 m. Les structures de charge secondaires sont des poutres multi-supports en profilés HH avec un espacement d’arbre de 1,0-1,40 m, fixés à la ceinture supérieure des supports principaux avec un raccord à vis. (French)
10 February 2022
0 references
Biharkeresztes, Hajdú-Bihar
0 references
Identifiers
GINOP-4.1.4-19-2020-01792
0 references