Copy — energy modernisation of a workshop building at American Legends Ltd. (Q3934791): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item: fix budget)
Property / co-financing rate
 
55.0 percent
Amount55.0 percent
Unitpercent
Property / co-financing rate: 55.0 percent / rank
 
Normal rank
Property / budget
 
60,250,375.0 forint
Amount60,250,375.0 forint
Unitforint
Property / budget: 60,250,375.0 forint / rank
 
Normal rank
Property / budget
 
170,327.81 Euro
Amount170,327.81 Euro
UnitEuro
Property / budget: 170,327.81 Euro / rank
 
Preferred rank
Property / budget: 170,327.81 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / budget: 170,327.81 Euro / qualifier
 
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / EU contribution
 
33,137,706.0 forint
Amount33,137,706.0 forint
Unitforint
Property / EU contribution: 33,137,706.0 forint / rank
 
Normal rank
Property / EU contribution
 
93,680.29 Euro
Amount93,680.29 Euro
UnitEuro
Property / EU contribution: 93,680.29 Euro / rank
 
Preferred rank
Property / EU contribution: 93,680.29 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / EU contribution: 93,680.29 Euro / qualifier
 
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:27, 13 February 2022

Project Q3934791 in Hungary
Language Label Description Also known as
English
Copy — energy modernisation of a workshop building at American Legends Ltd.
Project Q3934791 in Hungary

    Statements

    0 references
    33,137,706.0 forint
    0 references
    93,680.29 Euro
    0.002827 Euro
    13 February 2022
    0 references
    60,250,375.0 forint
    0 references
    170,327.81 Euro
    0.002827 Euro
    13 February 2022
    0 references
    55.0 percent
    0 references
    1 June 2020
    0 references
    25 February 2022
    0 references
    American Legends Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°26'35.27"N, 21°23'25.08"E
    0 references
    A pályázatban szereplő épület felújítása már régebbi terveink között szerepel, hiszen az épület hasznosítása régen időszerű. A motorkerékpár-építő céggel 2016 óta tárgyalunk a jövőbeni megoldásokról és fejlesztésekről, de a hiányzó forrás megléte elengedhetetlen e tekintetben. A gépészti kiviteli tervek már 2016-ban rendelkezésre álltak, felkészülve arra, hogy pályázati lehetőség nyílik számunkra. Ez a terv megfelelő paraméterekkel rendelkezik ahhoz, hogy ezen a pályázaton sikeresen szerepeljen a cég. Építési engedély nem szükséges a beruházáshoz. A projekt támogatott részén kívül természetesen az épületben különböző funkciójú helyiségeket szükséges kialakítani, a belső burkolat megépítése is szükséges, illetve a már említett hullámpala fedés is kicserélődik szendvicspanelre. Szükség van kamerarendszerre, tűzvédelmi rendszerre is. Az ehhez szükséges fedezet természetesen rendelkezésre áll. A cégünk egyik alkalmazottja fogja ellátni a projektmenedzseri feladatokat, pályázatíró és épületgépész-mérnök végzettséggel rendelkezik 15 éves építőipari tapasztalata van. A projekt során a tetőszerkezetre kerül a 200 db napelem modul, melynek darabonként 270 W a névleges teljesítménye, a rendszerhez hozzátartozik 2 db hálózatra tápláló inverter is. A fűtési rendszerben 3 db levegő-víz hőszivattyú hozzájuk tartozó hydromodulokkal fogja a szükséges fűtőközeget előállítani, a helyiségek fűtését gipszpaneles hűtő-fűtő egységekkel fogjuk ellátni. (Hungarian)
    0 references
    The refurbishment of the building included in the tender is included in our earlier plans, since the use of the building is long overdue. We have been discussing future solutions and developments with the motorcycle builder since 2016, but the lack of resources is essential in this regard. The engineering designs were already available in 2016, preparing for the possibility of a tender for us. This plan has the right parameters for the successful participation of the company in this tender. A building permit is not required for the project. In addition to the supported part of the project, it is of course necessary to create rooms with different functions in the building, the construction of the interior covering is also necessary, and the above-mentioned wave shale cover is also replaced with a sandwich panel. We need a camera system, a fire protection system. The necessary funds are of course available. One of the employees of our company will perform the tasks of project manager, have 15 years of experience in construction. During the project, 200 solar panel modules are placed on the roof structure, with a nominal output of 270 W per piece. The system also includes 2 inverters for the network. In the heating system, 3 air-to-water heat pumps will produce the necessary heating medium with their hydromodules, and the space heating will be provided with gypsum panel heating units. (English)
    8 February 2022
    0 references
    La rénovation du bâtiment inclus dans l’appel d’offres est incluse dans nos plans antérieurs, car l’utilisation du bâtiment est attendue depuis longtemps. Nous discutons des solutions et des développements futurs avec le constructeur de motos depuis 2016, mais le manque de ressources est essentiel à cet égard. Les projets d’ingénierie étaient déjà disponibles en 2016, préparant la possibilité d’un appel d’offres pour nous. Ce plan comporte les paramètres appropriés pour la participation réussie de l’entreprise au présent appel d’offres. Un permis de construire n’est pas requis pour le projet. En plus de la partie soutenue du projet, il est bien sûr nécessaire de créer des salles avec différentes fonctions dans le bâtiment, la construction de la couverture intérieure est également nécessaire, et le couvercle de schiste vague mentionné ci-dessus est également remplacé par un panneau sandwich. Nous avons besoin d’un système de caméra, d’un système de protection contre l’incendie. Les fonds nécessaires sont bien sûr disponibles. L’un des employés de notre société effectuera les tâches de chef de projet, aura 15 ans d’expérience dans la construction. Au cours du projet, 200 modules de panneaux solaires sont placés sur la structure du toit, avec une puissance nominale de 270 W par pièce. Le système comprend également 2 onduleurs pour le réseau. Dans le système de chauffage, 3 pompes à chaleur air-eau produiront le milieu de chauffage nécessaire avec leurs hydromodules, et le chauffage des locaux sera équipé d’unités de chauffage à panneaux de gypse. (French)
    10 February 2022
    0 references
    Hajdúszoboszló, Hajdú-Bihar
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-01632
    0 references