Investment aimed at increasing energy efficiency at PLATT 2003 Kft.'s site in uppertárkányi (2410.hrsz) (Q3934633): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: fix budget) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
55.0 percent
| |||||||||||||||
Property / co-financing rate: 55.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
10,236,849.0 forint
| |||||||||||||||
Property / budget: 10,236,849.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
28,939.57 Euro
| |||||||||||||||
Property / budget: 28,939.57 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 28,939.57 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / budget: 28,939.57 Euro / qualifier | |||||||||||||||
point in time: 13 February 2022
| |||||||||||||||
Property / EU contribution | |||||||||||||||
5,630,266.0 forint
| |||||||||||||||
Property / EU contribution: 5,630,266.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
15,916.76 Euro
| |||||||||||||||
Property / EU contribution: 15,916.76 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 15,916.76 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / EU contribution: 15,916.76 Euro / qualifier | |||||||||||||||
point in time: 13 February 2022
|
Revision as of 11:23, 13 February 2022
Project Q3934633 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Investment aimed at increasing energy efficiency at PLATT 2003 Kft.'s site in uppertárkányi (2410.hrsz) |
Project Q3934633 in Hungary |
Statements
5,630,266.0 forint
0 references
10,236,849.0 forint
0 references
55.0 percent
0 references
1 April 2020
0 references
31 March 2022
0 references
PLATT 2003. Fémszerkezet Gyártó,Szerelő és Szolgáltató Korlátolt Felelősségű Társaság
0 references
A beadott pályázat eredményes elfogadása esetében Platt 2003 Kft. fejleszteni tervezi épületének energiahatékonyságát, csökkentve annak energiafogyasztását, csökkentve a fosszilis energiahordozók alkalmazásával előálló légköri emissziót és egyéb környezeti terhelést, valamint megújuló energia alkalmazásával tovább csökkenti a különféle közműhálózatokból vásárolt energiafogyasztás mennyiségét. Az épület jelenlegi éves primer villamos energia felhasználásunk 212 860 kWh/év, mely a fejlesztést követően 585,92 GJ/év értékre csökken. A fejlesztés eredményeképp a következő további eredményeket érjük el: Az üvegházhatású gázok becsült éves csökkenése (t/év): 16,12 Energiahatékonysági fejlesztések által elért primer energia felhasználás csökkenés (GJ/év): 130,38 Üvegházhatást okozó gázok éves csökkenésének aránya a fejlesztés előtti kibocsátáshoz képest (%/év): 35,46 Fejlesztés részletei: A telepítendő 10,26 kw teljesítményű napelemes rendszer éves termelése 11 337 kWh, így az energiaigény 78,10%-ban kerül fedezésre megújuló energiából. A 36 db VSUN VSUN285-60P 285W Poly napelem panelt 1 db Growatt 10000 TL3-S inverterrel kötjük össze Kondenzációs gázkazán radiátoros fűtési rendszer telepítése valósul meg. Gázüzemű fűtő készülék elhelyezését, víz- és gázoldali bekötését szakember végzi. Viessmann Vitodens 200-W Gázüzemű kondenzációs falikazán, nemesacél fűtőfelülettel, névleges teljesítmény: 80 kW. A világításkorszerűsítés úgy valósul meg, hogy a meglévő korszerűtlen világítótestek és fényforrások a korszerűsítés eredményeként, a szabvány szerint előírt megvilágítási érték elérése mellett, jelentős villamos energia megtakarítást produkál. A lámpákat a meglévő világítási vezetékhálózat megtartásával, a meglévő lámpák helyére szerelik föl, lámpatest csere történik. Összesen 34 ledes világítóest kerül beépítésre. Előkészítési tevékenységek: • Építési tevékenység nem építési engedély köteles, melyről nyilatkoztunk, a kivitelező megtette nyilatkozatát a megkezdésre vonatkozóan. • A felújításhoz szükséges tervezési dokumentumok a kivitelező által elkészültek. • Az épületet energetikus felmérte és elkészítette a jelenlegi valamint tervezett állapotra vonatkozó energetikai tanúsítványokat, energetikai számításokat, illetve összefoglalta fejlesztési javaslatait. • Épületgépész megvizsgálta az épületet és megállapította, hogy a műszaki kritériumoknak a tervezett hőszivattyús rendszer megfelel. • Műszaki ellenőrrel egyeztetés, árajánlatkérés (Hungarian)
0 references
In the event of the successful acceptance of the submitted tender, Platt 2003 Kft. plans to improve the energy efficiency of its building, reducing its energy consumption, reducing the atmospheric emissions and other environmental pressures generated by the use of fossil fuels, and by using renewable energy further reduces the amount of energy consumption purchased from various utilities networks. The building’s current annual primary electricity consumption is 212 860 kWh/year, which decreases to 585.92 GJ/year after the development. As a result of the development, the following results will be achieved: Estimated annual reduction of greenhouse gases (t/year): 16.12 Reduction of primary energy consumption achieved by energy efficiency improvements (GJ/year): 130,38 Rate of annual reductions of greenhouse gases compared to pre-development emissions (%/year): 35,46 Development details: The solar system to be installed has an annual production of 11 337 kWh of 10,26 kw, so the energy demand is covered by 78.10 % of renewable energy. The 36-pcs VSUN VSUN285-60P 285 W Poly solar panel is connected to 1 pcs Growatt 10000 TL3-S inverter to install a condensed gas boiler radiator heating system. The installation of a gas-fuelled heating device is carried out by a specialist. Viessmann Vitodens 200-W Gas-based condensation galvan with stainless steel heating surface, rated output: 80 kW. The modernisation of lighting is achieved in such a way that existing illumination and light sources generate significant electricity savings as a result of the modernisation, while achieving the illumination value required in accordance with the standard. The lamps are installed in place of existing lamps by maintaining the existing lighting wiring network, replacement of luminaires takes place. A total of 34 led lights will be installed. Preparatory activities: • Construction activities are not subject to a building permit, which we have declared, the contractor has made his declaration of commencement. • The design documents required for the refurbishment have been completed by the contractor. • The building was energeticly assessed and prepared energy certifications, energy calculations, and a summary of its development proposals for the current and planned state. • A building engineer examined the building and concluded that the technical criteria were met by the planned heat pump system. • Consultation with the technical inspector, request for quotation (English)
8 February 2022
0 references
En cas d’acceptation de l’offre soumise, Platt 2003 Kft. prévoit d’améliorer l’efficacité énergétique de son bâtiment, de réduire sa consommation d’énergie, de réduire les émissions atmosphériques et d’autres pressions environnementales générées par l’utilisation de combustibles fossiles, et en utilisant les énergies renouvelables, de réduire encore la consommation d’énergie achetée auprès de divers réseaux de services publics. La consommation annuelle d’électricité primaire actuelle du bâtiment est de 212 860 kWh/an, ce qui diminue à 585,92 GJ/an après le développement. Grâce à cette évolution, les résultats suivants seront atteints: Réduction annuelle estimée des gaz à effet de serre (t/an): 16.12 Réduction de la consommation d’énergie primaire grâce à l’amélioration de l’efficacité énergétique (GJ/an): 130,38 Taux de réduction annuelle des gaz à effet de serre par rapport aux émissions antérieures au développement (%/an): 35,46 Détails sur le développement: Le système solaire à installer a une production annuelle de 11 337 kWh de 10,26 kW, de sorte que la demande d’énergie est couverte par 78,10 % des énergies renouvelables. Le 36-pcs VSUN VSUN285-60P 285 W panneau solaire poly est connecté à 1 pcs Growatt 10000 TL3-S inverseur pour installer un système de chauffage de radiateur de chaudière à gaz condensé. L’installation d’un dispositif de chauffage au gaz est effectuée par un spécialiste. Viessmann Vitodens 200-W galvan de condensation à base de gaz avec surface chauffante en acier inoxydable, puissance nominale: 80 kW. La modernisation de l’éclairage est réalisée de telle sorte que l’éclairage et les sources lumineuses existantes génèrent d’importantes économies d’électricité grâce à la modernisation, tout en atteignant la valeur d’éclairage requise conformément à la norme. Les lampes sont installées à la place des lampes existantes en maintenant le réseau de câblage d’éclairage existant, le remplacement des luminaires a lieu. Un total de 34 lumières LED seront installées. Activités préparatoires: • Les activités de construction ne sont pas soumises à un permis de construire, que nous avons déclaré, le contractant a fait sa déclaration de début. • Les documents de conception requis pour la rénovation ont été complétés par le contractant. • Le bâtiment a été évalué avec énergie et préparé des certifications énergétiques, des calculs énergétiques et un résumé de ses propositions de développement pour l’état actuel et prévu. • Un ingénieur du bâtiment a examiné le bâtiment et a conclu que les critères techniques étaient remplis par le système de pompe à chaleur prévu. • Consultation de l’inspecteur technique, demande de devis (French)
10 February 2022
0 references
Felsőtárkány, Heves
0 references
Identifiers
GINOP-4.1.4-19-2020-01394
0 references