Installation of a solar system on the site of Sikér Sütőipari and Kereskedelmi Kft._x000D_ (Q3934631): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: fix budget) |
(Removed claims) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 55.0 percent / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 13,840,375.0 forint / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 39,126.74 Euro / rank | |||||||||||||||
Property / budget: 39,126.74 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 39,126.74 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 7,612,206.0 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 21,519.71 Euro / rank | |||||||||||||||
Property / EU contribution: 21,519.71 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 21,519.71 Euro / qualifier | |||||||||||||||
|
Revision as of 22:43, 14 February 2022
Project Q3934631 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of a solar system on the site of Sikér Sütőipari and Kereskedelmi Kft._x000D_ |
Project Q3934631 in Hungary |
Statements
31 March 2020
0 references
31 March 2022
0 references
"SIKÉR" Sütőipari és Kereskedelmi Korlátolt Felelősségű Társaság
0 references
A beruházás keretében 175 db 285 Wp teljesítményű napelem panel, összesen 49,875 kWp névleges teljesítményben a tetőre kerülnek elhelyezésre. A hálózathoz való csatlakozás az ABB TRIO TM 50.0-400 inverteren keresztül történik. A 175 db 285W-os napelem névleges teljesítménye 49 875 W, amihez szükséges az 1 db ABB TRIO-TM-50.0-400-as inverter. Az inverter 3 munkapontos és így bárminemű hiba esetén csak kis mértékű visszaesés történik a hiba elhárításáig. Az inverter kiválasztásánál figyeltünk, hogy kompakt kialakításúak legyenek, így az inverterbe beépítve van az AC és DC kapcsoló és az AC és DC túlfeszültség védelem, így a gyors és biztonságos telepítés kivitelezhető. Az előkészítő tevékenységben megtörtént az épület energetikai felmérése és ezt alapul véve a napelemes rendszer megtervezése, melyet mellékletben csatolva küldünk. A kivitelező árajánlata és a megvalósítási terv rendelkezésünkre áll. A projektben az engedélyek megléte után fel kell telepíteni a napelemes tartószerkezetet a tetőre. Az AC és DC kábelezést el kell végezni, az invertert és szerelvényeit el kell helyezni. Fel kell szerelni a napelem táblákat és összekötni DC kábelekkel az inverterrel. A napelemes rendszert üzemképes állapotba kell helyezni a szükséges programozásokkal. A szükséges méréseket és ellenőrzéseket meg kell valósítani. Végül, de nem utolsósorban a rendszerfigyelő elemeket az internetre kell kötni és folyamatos nyomon követéssel biztosítani kell a rendszer hatékonyságát. PEIMAR - 285W polikristályos panelek kerülnek beépítésre a hatékonyság érdekében. A technológia első osztályú, megfelel az elfogadott napelemek színvonalának, vonatkozó szabványoknak. A projekt megvalósításban egy külsős menedzsment cég nyújt szakmai segítséget, akik már az előző EU-s programozási ciklus kezdete óta vesznek részt energetikai projektek megvalósításában, több tucat sikeresen lezárt projekttel a hátuk mögött. (Hungarian)
0 references
As part of the investment, 175 solar panels with a power of 285 Wp will be installed on the roof at a total rated power of 49.875 kWp. Connection to the network is done through the ABB TRIO TM 50.0-400 inverter. The rated power of 175 pcs 285 W solar panel is 49875 W, for which the 1 pcs ABB TRIO-TM-50.0-400 inverter is required. The inverter is 3 working point and therefore, in case of any error, only a slight downturn occurs until the problem is resolved. When choosing the inverter, we paid attention to their compact design, so the inverter incorporates AC and DC switch and AC and DC overvoltage protection, so fast and safe installation is possible. In the preparatory activity, the building’s energy assessment was carried out and based on this the design of the solar panel system has been carried out, which is attached in an annex. The contractor’s quotation and implementation plan are at our disposal. After having the permits, the solar panel support structure must be installed on the roof. The AC and DC cabling shall be performed, the inverter and its fittings shall be placed. Install solar panel boards and connect DC cables to the inverter. The solar system shall be put into service with the necessary programming. The necessary measurements and checks shall be carried out. Last but not least, the system monitoring elements should be linked to the Internet and the effectiveness of the system should be ensured through continuous monitoring. PEIMAR — 285 W polycrystalline panels are installed for efficiency. The technology is first class, meets the standards of accepted solar panels and relevant standards. The project is implemented by an external management company, who have been involved in the implementation of energy projects since the beginning of the previous EU programming cycle, with dozens of successfully completed projects behind their backs. (English)
8 February 2022
0 references
Dans le cadre de l’investissement, 175 panneaux solaires d’une puissance de 285 Wp seront installés sur le toit pour une puissance nominale totale de 49.875 kWp. La connexion au réseau se fait via l’onduleur ABB TRIO TM 50.0-400. La puissance nominale du panneau solaire 175 pcs 285 W est de 49875 W, pour laquelle l’onduleur ABB TRIO-TM-50.0-400 est requis. L’onduleur est 3 point de travail et donc, en cas d’erreur, seulement un léger ralentissement se produit jusqu’à ce que le problème soit résolu. Lors du choix de l’onduleur, nous avons prêté attention à leur conception compacte, de sorte que l’onduleur intègre l’interrupteur AC et DC et la protection contre les surtensions AC et DC, donc une installation rapide et sûre est possible. Dans le cadre de l’activité préparatoire, l’évaluation énergétique du bâtiment a été effectuée et, sur cette base, la conception du système de panneaux solaires a été réalisée, qui est jointe en annexe. Le devis et le plan de mise en œuvre du contractant sont à notre disposition. Après avoir obtenu les permis, la structure de support du panneau solaire doit être installée sur le toit. Le câblage en courant alternatif et en courant continu doit être exécuté, l’onduleur et ses raccords doivent être placés. Installez des panneaux solaires et connectez les câbles CC à l’onduleur. Le système solaire doit être mis en service avec la programmation nécessaire. Les mesures et contrôles nécessaires sont effectués. Enfin, les éléments de surveillance du système devraient être liés à l’internet et l’efficacité du système devrait être assurée par un suivi continu. Peimar — 285 W panneaux polycristallins sont installés pour l’efficacité. La technologie est de première classe, répond aux normes des panneaux solaires acceptés et aux normes pertinentes. Le projet est mis en œuvre par une société de gestion externe, qui participe à la mise en œuvre de projets énergétiques depuis le début du précédent cycle de programmation de l’UE, avec des dizaines de projets achevés avec succès dans le dos. (French)
10 February 2022
0 references
Gyomaendrőd, Békés
0 references
Identifiers
GINOP-4.1.4-19-2020-01391
0 references