Property / co-financing rate | |||||||||||||||
50.0 percent
| |||||||||||||||
Property / co-financing rate: 50.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
50,550,066.0 forint
| |||||||||||||||
Property / budget: 50,550,066.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
142,905.04 Euro
| |||||||||||||||
Property / budget: 142,905.04 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 142,905.04 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / budget: 142,905.04 Euro / qualifier | |||||||||||||||
point in time: 13 February 2022
| |||||||||||||||
Property / EU contribution | |||||||||||||||
25,275,033.0 forint
| |||||||||||||||
Property / EU contribution: 25,275,033.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
71,452.52 Euro
| |||||||||||||||
Property / EU contribution: 71,452.52 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 71,452.52 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / EU contribution: 71,452.52 Euro / qualifier | |||||||||||||||
point in time: 13 February 2022
|
Revision as of 10:22, 13 February 2022
Project Q3925083 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Building energy development at Express Cooling Technology Ltd. |
Project Q3925083 in Hungary |
Statements
25,275,033.0 forint
0 references
50,550,066.0 forint
0 references
50.0 percent
0 references
6 February 2019
0 references
31 October 2019
0 references
Express Hűtéstechnikai Szerviz Korlátolt Felelősségű Társaság
0 references
A megvalósítási helyszín a 4100 Berettyóújfalu, Vágóhíd u. Hrsz: 2034/1 alatt található. Az ingatlanon 2 db épület helyezkedik el. Az utcafronti épület korábban iroda szociális épületként az udvaron belül nagyobb épület pedig gépjármű műszaki vizsgaállomásként üzemelt. Az Express Hűtéstechnikai Kft. 2017-ben vásárolta meg az ingatlant telephelynek, ahol a szerviz épületben szervizt és raktárépületet alakított ki. Az iroda és szociális épületen az energetikai fejlesztések előtt az épület bővítésre került magastetővel, fa ácsszerkezetű fedélszékkel, trapézlemez fedéssel, oromfalak építésével, továbbá még átalakításra kerül az épületen belül a belső térben válaszfalak bontása és új válaszfalak építése, amely nem a projekt része. Az épületek meglévő épületszerkezetei hasonlóak, amelyet tartalmaz az épületenergetikai korszerűsítési terv. Az irodaépület építési engedéllyel rendelkezik, mely tartalmazza a tervezett beruházás hőszigetelési, nyílászáró szerkezetek elhelyezését és a fűtési szerelési munkálatokat. Az engedély száma: 2914-6/2017. A napelemes rendszer elhelyezéshez külön tervlap készült. Az iroda épületen tervezett hőszigetelés, nyílászáró csere, fűtés korszerűsítés és napelemes rendszer létesítési munkák önállóan nem építési engedély kötelesek. A tervezett beruházás fejlesztési munkái még nem kezdődtek meg. Az építési engedélyes tervben szereplő munkák közül csak a magastető építése valósult meg. Az engedélyes tervben szereplő belső átalakítási munkák nem része a jelen beruházásnak. A szervíz épületen tervezett energetikai korszerűsítési munkák nem építési engedély kötelesek. Az iroda-szociális épület energetikai korszerűsítésének szerkezetei: Födém hőszigetelése: a födémen 20 cm vtg. szálas hőszigetelés kerül leterítésre, melyet felülről páraáteresztő takarófóliával védünk. Homlokzat felújítás: Nyílásszűkítések anyaga 25 cm vtg PORFIX falazat. A hőszigetelés a homlokzati szerkezetekre 15 cm EPS hőszigetelő rendszer kerül. A lábazaton 15 cm XPS hőszigetelő rendszer készül. Nyílászárók: Homlokzati nyílászárók fokozott hőtechnikai igényt kielégítő műanyag nyílászárók. Az irodaépület gépészet, villanyszerelési munkálatai a homlokzati gázvezetékek a hőszigetelés síkjának megfelelően átalakításra kerülnek. A fűtés, melegvízellátásnál a meglévő hálózat felújítása tervezett, melyben 2 db meglévő kombi gázkazán hőtermelő van elhelyezve, radiátor hőleadókkal, amely kazánok kicserélése fog megvalósulni, új kondenzációs kazánok elhelyezésével. A szerviz épület energetikai korszerűsítésének szerkezetei: A födém hőszigetelése 20 cm-es EPS hőszigeteléssel. A hőszigetelés a homlokzati szerkezetekre 15 cm EPS hőszigetelő rendszer kerül, a lábazaton 15 cm XPS hőszigetelő rendszer készül. A homlokzati nyílászárók fokozott hőtechnikai igényt kielégítő műanyag nyílászárókra lesznek kicserélve. A szerviz épület gépészeti, villanyszerelési munkálatai a homlokzati gázvezetékek a hőszigetelés síkjának megfelelően átalakításra kerülnek. A szervizépületnél a fűtés, melegvíz ellátás a meglévő hálózat átalakítása- felújítása nem tervezett. Napelemes rendszer kerül kiépítésre, amely fizikailag csak az iroda épületen lesz elhelyezve. A tervezett napelemes rendszer összteljesítménye 20,075 kW melyből 6,325 kW teljesítmény az iroda-szoc. épületben 13,75 kW teljesítmény pedig a szerviz épületben kerül felhasználásra. A két épület egy mérőhellyel rendelkezik. (Hungarian)
0 references
The implementation site is 4100 Berettyóújfalu, Vágóhíd u. Hrsz: It is located under 2034/1. There are 2 buildings on the property. The streetfront building used to be an office as a social building and a larger building within the yard was used as a vehicle technical examination station. Express Cooling Technology Ltd. In 2017, he purchased the property as a site, where he built a service and warehouse in the service building. Prior to the energy development of the office and social building, the building has been expanded with a high roof, wooden carpentry cover, trapezoidal sheet covering, orbital walls, and the demolition of partitions within the building and the construction of new partitions, which is not part of the project. The existing building structures of buildings are similar and are included in the Building Energy Renovation Plan. The office building has a building permit, which includes the installation of thermal insulation, windows and heating installation works for the planned project. Licence number: 2914-6/2017. A separate design sheet was made for the installation of the solar panel system. The thermal insulation, the replacement of doors and windows, the upgrading of heating and the construction works of solar panel systems are not required independently. Development work on the planned investment has not yet started. Of the works included in the construction permit plan, only the construction of the high roof was carried out. The internal transformation works included in the licensee’s plan are not part of the present investment. Energy modernisation works planned on the service building are not required to build a building permit. Structures for energy modernisation of the office-social building: Slab thermal insulation: on the slab, 20 cm vtg. fibrous thermal insulation is laid down, which is protected from above by a permeable cover film. Facade renovation: Opening narrowing material is 25 cm vtg PORFIX masonry. The thermal insulation of the facade structures is a 15 cm EPS thermal insulation system. On the plinth 15 cm XPS thermal insulation system is made. Doors and windows: Facade doors and windows are plastic doors and windows that meet increased thermal demand. The mechanical engineering of the office building, the electrical installation works of the facade gas pipelines are modified according to the plane of thermal insulation. In the case of heating and hot water supply, the renovation of the existing network is planned, in which 2 existing combined gas boilers are installed, with radiator heat take-offs, which will be replaced by new condensation boilers. Energy modernisation structures of the service building: Thermal insulation of the floor with 20 cm EPS thermal insulation. The thermal insulation of the facade structures is 15 cm EPS thermal insulation system, on the plinth 15 cm XPS thermal insulation system is made. The facade doors and windows will be replaced with plastic doors and windows meeting the need for thermal engineering. The mechanical and electrical works of the service building are transformed according to the plane of thermal insulation of the facade gas pipelines. In the service building, the heating and hot water supply is not planned to refurbish the existing network. A solar panel system will be installed, which will only be physically located on the office building. The total power of the planned solar system is 20.075 kW, out of which 6.325 kW power is used in the office-soc. building and 13.75 kW power is used in the service building. The two buildings have a measuring point. (English)
8 February 2022
0 references
Le site de mise en œuvre est 4100 Berettyóújfalu, Vágóhíd u. Hrsz: Il est situé sous 2034/1. Il y a 2 bâtiments sur la propriété. L’édifice du front de rue était un bureau en tant que bâtiment social et un bâtiment plus grand à l’intérieur de la cour était utilisé comme poste d’examen technique des véhicules. Technologie de refroidissement express Ltd. En 2017, il a acheté la propriété comme site, où il a construit un service et un entrepôt dans le bâtiment de service. Avant le développement énergétique du bâtiment de bureaux et social, le bâtiment a été agrandi avec un haut toit, un couvercle de menuiserie en bois, un revêtement en tôle trapézoïdale, des murs orbitaux, et la démolition de cloisons à l’intérieur du bâtiment et la construction de nouvelles cloisons, qui ne font pas partie du projet. Les structures existantes des bâtiments sont similaires et sont incluses dans le plan de rénovation énergétique des bâtiments. L’immeuble de bureaux dispose d’un permis de construire, qui comprend l’installation d’isolation thermique, de fenêtres et de travaux d’installation de chauffage pour le projet envisagé. Numéro de licence: 2914-6/2017. Une feuille de conception distincte a été réalisée pour l’installation du système de panneaux solaires. L’isolation thermique, le remplacement des portes et des fenêtres, l’amélioration du chauffage et les travaux de construction de systèmes de panneaux solaires ne sont pas nécessaires indépendamment. Les travaux de développement sur l’investissement prévu n’ont pas encore commencé. Parmi les travaux inclus dans le plan de permis de construction, seule la construction du haut toit a été réalisée. Les travaux de transformation internes inclus dans le plan du titulaire ne font pas partie de l’investissement actuel. Les travaux de modernisation énergétique prévus sur le bâtiment de service ne sont pas requis pour la construction d’un permis de construire. Structures de modernisation énergétique du bâtiment bureau-social: Isolation thermique de dalle: sur la dalle, 20 cm vtg. isolation thermique fibreuse est posée, qui est protégée du haut par un film de couverture perméable. Rénovation des façades: Le matériau de rétrécissement d’ouverture est de 25 cm vtg PORFIX maçonnerie. L’isolation thermique des structures de façade est un système d’isolation thermique EPS de 15 cm. Sur le socle 15 cm XPS système d’isolation thermique est fait. Portes et fenêtres: Les portes de façade et les fenêtres sont des portes en plastique et des fenêtres qui répondent à la demande thermique accrue. L’ingénierie mécanique du bâtiment de bureaux, les travaux d’installation électrique des gazoducs de façade sont modifiés en fonction du plan d’isolation thermique. Dans le cas du chauffage et de l’alimentation en eau chaude, la rénovation du réseau existant est prévue, où sont installées 2 chaudières à gaz combinées existantes, avec des prises de chaleur par radiateur, qui seront remplacées par de nouvelles chaudières à condensation. Structures de modernisation énergétique du bâtiment de services: Isolation thermique du sol avec isolation thermique EPS de 20 cm. L’isolation thermique des structures de façade est 15 cm EPS système d’isolation thermique, sur le socle 15 cm XPS système d’isolation thermique est fait. Les portes et fenêtres de façade seront remplacées par des portes en plastique et des fenêtres répondant aux besoins de l’ingénierie thermique. Les travaux mécaniques et électriques du bâtiment de service sont transformés selon le plan d’isolation thermique des gazoducs de façade. Dans le bâtiment de service, le chauffage et l’approvisionnement en eau chaude ne sont pas prévus pour rénover le réseau existant. Un système de panneaux solaires sera installé, qui ne sera physiquement situé que sur l’immeuble de bureaux. La puissance totale du système solaire prévu est de 20,075 kW, dont 6,325 kW sont utilisés dans le bâtiment des bureaux et 13,75 kW dans le bâtiment de service. Les deux bâtiments ont un point de mesure. (French)
10 February 2022
0 references
Berettyóújfalu, Hajdú-Bihar
0 references
Identifiers
GINOP-4.1.2-18-2018-00119