Development of the school in Ostoros (Q3902870): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: fix budget) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
100.0 percent
| |||||||||||||||
Property / co-financing rate: 100.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
42,919,392.0 forint
| |||||||||||||||
Property / budget: 42,919,392.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
121,333.12 Euro
| |||||||||||||||
Property / budget: 121,333.12 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 121,333.12 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / budget: 121,333.12 Euro / qualifier | |||||||||||||||
point in time: 13 February 2022
| |||||||||||||||
Property / EU contribution | |||||||||||||||
42,919,392.0 forint
| |||||||||||||||
Property / EU contribution: 42,919,392.0 forint / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
121,333.12 Euro
| |||||||||||||||
Property / EU contribution: 121,333.12 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 121,333.12 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.002827 Euro
| |||||||||||||||
Property / EU contribution: 121,333.12 Euro / qualifier | |||||||||||||||
point in time: 13 February 2022
|
Revision as of 01:57, 13 February 2022
Project Q3902870 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Development of the school in Ostoros |
Project Q3902870 in Hungary |
Statements
42,919,392.0 forint
0 references
42,919,392.0 forint
0 references
100.0 percent
0 references
1 November 2017
0 references
28 February 2019
0 references
Egri Tankerületi Központ
0 references
Jelen kérelemben a fenntartó az Ostorosi Árpád Fejedelem ÁItalános Iskola infrastrukturális fejlesztésének támogatására nyújt be pályázatot. A projekt tervezett hossza 12 hónap. A felújítással érintett épület domboldalba simulva készült alagsor-földszint-tetőtér elrendezésben többszörösen tagolt magastetővel. Az épület fedése – feltételezhetően azbeszt tartalmú – rombuszpala. A fedés elöregedett, több helyen törött, így cseréje műszaki és nem utolsó sorban egészségügyi szempontból is indokolttá vált. A tervezett felújítás az épület belső tereit és külső megjelenését egyaránt érinti. Felújításra kerül a tantermek és a közlekedők padlója, a helyiségek falai kifestésre kerülnek valamint új fedés készül az épületre cserepes lemezből. A projekt keretében megvalósítandó tevékenységek: 3.1.1 Önállóan támogatható tevékenységek: A nevelési-oktatási tevékenység megvalósításához használt termek, oktatási termek és az azok elérését szolgáló folyosók, közlekedők felújítása, átalakítása (burkolat felújítás és festés). 3.1.2.1 Kötelezően megvalósítandó, önállóan nem támogatható tevékenységek: projekt előkészítés (szakmai terv készítése, kiviteli terv készítése, közbeszerzési eljárások lebonyolítása, projekt menedzsment tevékenység biztosítása, horizontális szempontok érvényesítése és kötelező tájékoztatás és nyilvánosság biztosítása) 3.1.2.2 Választható, önállóan nem támogatható tevékenységek: az infrastrukturális fejlesztésben érintett terek használhatóságának biztosításához eszközök, berendezési tárgyak és bútorok beszerzése (eszközbeszerzés), beázások, födémhibák megszüntetése. A projekt részletes szakmai tartalma a támogatási kérelem mellékleteként csatolt szakmai tervben kerül bemutatásra. (Hungarian)
0 references
In the present application, the operator submits an application to support the infrastructure development of the Árpád General School of Ostorosi. The planned duration of the project is 12 months. The building affected by the renovation was built in a hillside with a basement-ground-top arrangement with a multi-divided high roof. The building is covered with diamond shale, presumably containing asbestos. The cover is old and broken in several places, so its replacement was justified from a technical and not least health point of view. The planned renovation affects both the interior and the exterior of the building. The floors of the classrooms and road users will be renovated, the walls of the rooms will be painted and a new cover will be made of tiles. Activities to be carried out under the project: 3.1.1 Self-eligible activities: Refurbishment and refurbishment of the rooms, educational rooms and the corridors and roadways used to carry out the educational activity (covering renovation and painting). 3.1.2.1 Compulsory non-eligible activities: project preparation (professional plan preparation, construction plan, implementation of public procurement procedures, provision of project management activities, implementation of horizontal aspects and mandatory information and publicity) 3.1.2.2 Optional, ineligible activities: purchase of equipment, equipment and furniture to ensure the usability of spaces involved in infrastructure development (acquisition of equipment), removal of flooding and floor defects. The detailed technical content of the project is presented in the technical plan attached to the grant application. (English)
8 February 2022
0 references
Im vorliegenden Antrag stellt der Betreiber einen Antrag auf Unterstützung der Infrastrukturentwicklung der Árpád General School of Ostorosi. Die geplante Projektlaufzeit beträgt 12 Monate. Das von der Renovierung betroffene Gebäude wurde in einem Hang mit einem Keller-Boden-Top-Arrangement mit einem mehrgeteilten Hochdach gebaut. Das Gebäude ist mit Diamantschiefer bedeckt und enthält vermutlich Asbest. Die Abdeckung ist alt und an mehreren Stellen gebrochen, so dass sein Ersatz aus technischer und nicht zuletzt gesundheitlicher Sicht gerechtfertigt war. Die geplante Renovierung wirkt sich sowohl auf das Innere als auch auf die Außenseite des Gebäudes aus. Die Etagen der Klassenzimmer und Straßenbenutzer werden renoviert, die Wände der Zimmer werden gemalt und ein neuer Deckel aus Fliesen gemacht. Im Rahmen des Projekts durchzuführende Maßnahmen: 3.1.1 Selbstberechtigte Tätigkeiten: Renovierung und Renovierung der Räume, Bildungsräume und Korridore und Straßen, die zur Durchführung der Bildungstätigkeit (Renovierung und Malerei) genutzt werden. 3.1.2.1 Obligatorische nicht förderfähige Tätigkeiten: Projektvorbereitung (Professionelle Planung, Bauplan, Durchführung von Verfahren zur Vergabe öffentlicher Aufträge, Durchführung von Projektmanagementmaßnahmen, Umsetzung horizontaler Aspekte sowie obligatorische Information und Publizität) 3.1.2.2 Optionale, nicht förderfähige Tätigkeiten: Kauf von Ausrüstung, Ausrüstung und Mobiliar zur Sicherstellung der Nutzbarkeit von Räumen, die an der Infrastrukturentwicklung beteiligt sind (Erwerb von Geräten), Beseitigung von Überschwemmungen und Bodendefekten. Der detaillierte technische Inhalt des Projekts ist in dem dem Finanzhilfeantrag beigefügten technischen Plan aufgeführt. (German)
9 February 2022
0 references
Dans la présente demande, l’exploitant présente une demande de soutien au développement des infrastructures de l’école générale d’Árpád d’Ostorosi. La durée prévue du projet est de 12 mois. Le bâtiment touché par la rénovation a été construit dans une colline avec un sous-sol-plancher avec un toit haut multi-divisés. Le bâtiment est recouvert de schiste diamanté, probablement contenant de l’amiante. La couverture est ancienne et cassée en plusieurs endroits, de sorte que son remplacement était justifié d’un point de vue technique et surtout sanitaire. La rénovation prévue affecte à la fois l’intérieur et l’extérieur du bâtiment. Les sols des salles de classe et des usagers de la route seront rénovés, les murs des chambres seront peints et une nouvelle couverture sera faite de carreaux. Activités à réaliser dans le cadre du projet: 3.1.1 Activités auto-admissibles: Remise à neuf et remise à neuf des salles, des salles éducatives et des couloirs et des routes servant à la réalisation de l’activité éducative (rénovation et peinture). 3.1.2.1 Activités obligatoires non admissibles: préparation du projet (élaboration d’un plan professionnel, plan de construction, mise en œuvre des procédures de passation de marchés publics, fourniture d’activités de gestion de projet, mise en œuvre d’aspects horizontaux et information obligatoire et publicité) 3.1.2.2 Activités facultatives et inéligibles: achat de matériel, d’équipement et de mobilier pour assurer l’utilisabilité des espaces impliqués dans le développement de l’infrastructure (acquisition d’équipement), l’élimination des inondations et les défauts de plancher. Le contenu technique détaillé du projet est présenté dans le plan technique joint à la demande de subvention. (French)
10 February 2022
0 references
Ostoros, Heves
0 references
Identifiers
EFOP-4.1.3-17-2017-00278
0 references