Property / budget | |||||||
7,495.0 Euro
| |||||||
Property / budget: 7,495.0 Euro / rank | |||||||
Normal rank | |||||||
Property / EU contribution | |||||||
3,747.5 Euro
| |||||||
Property / EU contribution: 3,747.5 Euro / rank | |||||||
Normal rank | |||||||
Property / co-financing rate | |||||||
50.0 percent
| |||||||
Property / co-financing rate: 50.0 percent / rank | |||||||
Normal rank |
Revision as of 16:41, 11 February 2022
Project Q1874344 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | COMPLETION OF WORK FOR INFORMATION LABORATORIES |
Project Q1874344 in Italy |
Statements
3,747.5 Euro
0 references
7,495.0 Euro
0 references
50.0 percent
0 references
11 February 2016
0 references
8 November 2016
0 references
14 December 2016
0 references
"T. ACERBO"
0 references
SCOPO DEL PROGETTO LA REALIZZAZIONE EX NOVO DI UNA INFRASTRUTTURA DI RETE PER UN LABORATORIO INFORMATICOMULTIMEDIALE E LADEGUAMENTO DI QUELLA DI UN SECONDO NEL RISPETTO DEGLI STANDARD QUALITATIVI CHE LISTITUTO HA POSTO IN ESSERE NEGLI ANNI AVENDO PREVISTO CON LARGO ANTICIPO LUTILIZZO DELLE NUOVE TECNOLOGIE NELLA DIDATTICA E NELLA GESTIONE SCOLASTICA LISTITUTO ACERBO SI DOTATO NEL TEMPO SOSTENENDO ANCHE NOTEVOLI SACRIFICI ECONOMICI IN PROPRIO DI UNA INFRASTRUTTURA DI RETE DI ALTO LIVELLO E DI LABORATORI INFORMATICIMULTIMEDIALI INNOVATIVI LISTITUTO COSTITUITO DA 2 PLESSI ATTUALMENTE COLLEGATI FRA LORO DA UNA RETE IN FIBRA OTTICA CHE CONSENTE DI CONDIVIDERE OVUNQUE UNA LINEA ADSL DA 100 MBSEC ADATTA PER PICCOLE E MEDIE AZIENDE LA SCUOLA INOLTRE DOTATA DI DUE PALESTRE ANCHESSE CABLATE E DI UNAMPIA AREA ESTERNA ANCHESSA RAGGIUNTA DAL SEGNALE WIFI LINFRASTRUTTURA DI RETE FISICAMENTE SUDDIVISA IN DUE SOTTORETI UNA WIRED E LALTRA WIRELESS CON ALCUNE DECINE DI ACCESS POINT SIA INTERNI CHE (Italian)
0 references
THE AIM OF THE PROJECT IS TO BUILD A NEW NETWORK INFRASTRUCTURE FOR AN IT LABORATORY FOR AN ELECTRONIC LABORATORY, AND TO ADAPT A SECOND ONE IN COMPLIANCE WITH THE QUALITY STANDARDS SET BY THE INSTITUTE OVER THE YEARS IN ADVANCE OF THE USE OF NEW TECHNOLOGIES IN THE TEACHING AND SCHOOL MANAGEMENT OF THE ACERBO ESTABLISHMENT OVER TIME, ALSO BY SUPPORTING SIGNIFICANT ECONOMIC SACRIFICES IN ITS OWN RIGHT OF AN INNOVATIVE NETWORK OF 2 MBSEC NETWORKS WHICH ARE SUITABLE FOR SMALL AND MEDIUM-SIZED ENTERPRISES TO SHARE THE SCHOOL IN ADDITION TO TWO GYMS ANCHESSE CABLE AND A WIDE EXTERNAL EXTERNAL AREA, WHICH HAS BEEN DIVIDED INTO TWO SUB-NETWORKS, ONE WIRED, AND THE OTHER WIRELESS WITH DOZENS OF ACCESS POINTS, BOTH INTERNAL AND WIRELESS. (English)
0 references
L’OBJECTIF DU PROJET EST LA CRÉATION D’UNE INFRASTRUCTURE DE RÉSEAU POUR UN LABORATOIRE INFORMATICOMULTIMEDIALE ET L’ADAPTATION DE CELLE D’UNE SECONDE EN CONFORMITÉ AVEC LES NORMES DE QUALITÉ QUE L’INSTITUT A MIS EN PLACE AU FIL DES ANS APRÈS AVOIR FOURNI BIEN À L’AVANCE L’UTILISATION DES NOUVELLES TECHNOLOGIES DANS L’ENSEIGNEMENT ET LA GESTION SCOLAIRE L’INSTITUT A ÉGALEMENT SOUTENU DES SACRIFICES ÉCONOMIQUES CONSIDÉRABLES EN SON PROPRE DROIT D’UNE INFRASTRUCTURE RÉSEAU DE HAUT NIVEAU ET DES LABORATOIRES INFORMATICIMULTIMIMEDIAL INNOVANTS L’INSTITUT SE COMPOSE DE 2 PLEX ACTUELLEMENT CONNECTÉS PAR UN RÉSEAU DE FIBRES OPTIQUES QUI PERMET DE PARTAGER PARTOUT UNE LIGNE ADSL DE L’INSTITUT 100 MBSEC ADAPTÉ AUX PETITES ET MOYENNES ENTREPRISES L’ÉCOLE ÉGALEMENT ÉQUIPÉE DE DEUX GYMNASES ÉGALEMENT CÂBLÉS ET D’UN GRAND ESPACE EXTÉRIEUR ÉGALEMENT ATTEINT PAR LE WIFI SIGNAL L’INFRASTRUCTURE RÉSEAU PHYSIQUEMENT DIVISÉE EN DEUX SOUS-RÉSEAUX L’UN CÂBLÉ ET L’AUTRE SANS FIL AVEC QUELQUES DIZAINES DE POINTS D’ACCÈS INTERNE ET INTERNE. (French)
10 December 2021
0 references
DOEL VAN HET PROJECT IS DE TOTSTANDBRENGING VAN EEN NETWERKINFRASTRUCTUUR VOOR EEN LABORATORIUM INFORMATICOMULTIMEDIALE EN DE AANPASSING VAN DIE VAN EEN TWEEDE IN OVEREENSTEMMING MET DE KWALITEITSNORMEN DIE HET INSTITUUT IN DE LOOP DER JAREN HEEFT INGEVOERD NA RUIM OP VOORHAND HET GEBRUIK VAN NIEUWE TECHNOLOGIEËN IN HET ONDERWIJS EN HET SCHOOLMANAGEMENT TE HEBBEN VERSTREKT, HEEFT HET INSTITUUT IN DE LOOP DER TIJD OOK AANZIENLIJKE ECONOMISCHE OFFERS OP EIGEN INITIATIEF VAN EEN NETWERKINFRASTRUCTUUR OP HOOG NIVEAU EN INNOVATIEVE INFORMATICIMULTIMEDIAL-LABORATORIA, HET INSTITUUT BESTAAT UIT 2 PLEXES DIE MOMENTEEL VERBONDEN ZIJN DOOR EEN GLASVEZELNETWERK DAT HET MOGELIJK MAAKT OVERAL EEN ADSL TE DELEN LIJN VAN 100 MBSEC GESCHIKT VOOR KLEINE EN MIDDELGROTE BEDRIJVEN DE SCHOOL OOK UITGERUST MET TWEE SPORTSCHOLEN OOK BEKABELD EN EEN GROTE BUITENRUIMTE OOK BEREIKT DOOR HET WIFI-SIGNAAL DE NETWERKINFRASTRUCTUUR FYSIEK VERDEELD IN TWEE SUBNETTEN EEN BEKABELDE EN DE ANDERE DRAADLOOS MET EEN PAAR TIENTALLEN TOEGANGSPUNT ZOWEL INTERN ALS INTERN. (Dutch)
22 December 2021
0 references
ZIEL DES PROJEKTES IST DIE SCHAFFUNG EINER NETZWERKINFRASTRUKTUR FÜR EIN LABOR INFORMATICOMULTIMEDIALE UND DIE ANPASSUNG DER ZWEITEN IN ÜBEREINSTIMMUNG MIT DEN QUALITÄTSSTANDARDS, DIE DAS INSTITUT IM LAUFE DER JAHRE EINGEFÜHRT HAT, NACHDEM ES DEN EINSATZ NEUER TECHNOLOGIEN IM UNTERRICHT UND IM SCHULMANAGEMENT IM LAUFE DER ZEIT BEREITS IM VORAUS ZUR VERFÜGUNG GESTELLT HAT. DAS INSTITUT UNTERSTÜTZT IM LAUFE DER ZEIT AUCH ERHEBLICHE WIRTSCHAFTLICHE OPFER EINER HOCHGRADIGEN NETZWERKINFRASTRUKTUR UND INNOVATIVEN INFORMATICIMULTIMEDIAL LABORS, DIE DAS INSTITUT AUS ZWEI DERZEIT DURCH EIN OPTISCHES GLASFASERNETZ ANGESCHLOSSENEN PLEXIGLAS-ANLAGEN UMFASST, DIE ÜBERALL EINE ADSL-LINIE TEILEN KÖNNEN. VON 100 MBSEC GEEIGNET FÜR KLEINE UND MITTLERE UNTERNEHMEN DIE SCHULE AUCH MIT ZWEI EBENFALLS VERKABELTEN FITNESSSTUDIOS UND EINEM GROSSEN AUSSENBEREICH, DER AUCH DURCH DAS WIFI-SIGNAL ERREICHT WURDE, DIE NETZWERKINFRASTRUKTUR PHYSISCH IN ZWEI SUBNETZE UNTERTEILT, DIE EINE KABELGEBUNDENE UND DIE ANDERE DRAHTLOSE MIT EIN PAAR DUTZENDEN VON ZUGANGSPUNKTEN SOWOHL INTERN ALS AUCH INTERN. (German)
23 December 2021
0 references
EL OBJETIVO DEL PROYECTO ES LA CREACIÓN DE UNA INFRAESTRUCTURA DE RED PARA UN LABORATORIO INFORMATICOMULTIMEDIALE Y LA ADAPTACIÓN DE LA DE UN SEGUNDO EN CUMPLIMIENTO DE LAS NORMAS DE CALIDAD QUE EL INSTITUTO HA PUESTO EN MARCHA A LO LARGO DE LOS AÑOS HABIENDO PROPORCIONADO CON MUCHA ANTELACIÓN EL USO DE LAS NUEVAS TECNOLOGÍAS EN LA ENSEÑANZA Y LA GESTIÓN ESCOLAR EL INSTITUTO TAMBIÉN TIENE CON EL TIEMPO APOYANDO CONSIDERABLES SACRIFICIOS ECONÓMICOS POR DERECHO PROPIO DE UNA INFRAESTRUCTURA DE RED DE ALTO NIVEL E INNOVADORES LABORATORIOS INFORMATICIMULTIMEDIAL EL INSTITUTO CONSTA DE 2 PLEXOS ACTUALMENTE CONECTADOS POR UNA RED DE FIBRA ÓPTICA QUE PERMITE COMPARTIR EN TODAS PARTES UNA LÍNEA ADSL DE 100 MBSEC ADECUADO PARA PEQUEÑAS Y MEDIANAS EMPRESAS LA ESCUELA TAMBIÉN EQUIPADO CON DOS GIMNASIOS TAMBIÉN CABLEADO Y UNA GRAN ÁREA AL AIRE LIBRE TAMBIÉN ALCANZADA POR LA SEÑAL WIFI LA INFRAESTRUCTURA DE RED SE DIVIDE FÍSICAMENTE EN DOS SUBREDES UNA CABLEADA Y LA OTRA INALÁMBRICA CON UNAS POCAS DOCENAS DE PUNTOS DE ACCESO TANTO INTERNA COMO INTERNAMENTE. (Spanish)
23 January 2022
0 references
PESCARA
0 references
Identifiers
C26J16000040007
0 references