Infrastructural development of learning spaces at Szalasend District Elementary School (Q3902389): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Adding German translations) |
(Removed claims) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 85.0 percent / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 20,000,000 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 54,672.51 Euro / rank | |||||||||||||||
Property / EU contribution: 54,672.51 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 54,672.51 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 64,320.602 Euro / rank | |||||||||||||||
Property / budget: 64,320.602 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 64,320.602 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 23,529,411.765 forint / rank | |||||||||||||||
Revision as of 01:53, 13 February 2022
Project Q3902389 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Infrastructural development of learning spaces at Szalasend District Elementary School |
Project Q3902389 in Hungary |
Statements
1 March 2018
0 references
14 December 2018
0 references
Szerencsi Tankerületi Központ
0 references
A PROJEKT CÉLJA: A projekt célja a Szalaszendi Körzeti Általános Iskola tanulást segítő tereinek infrastrukturális fejlesztése. Jelen projekt becsült bruttó beruházási költsége 20 Millió Ft. A FEJLESZTENDŐ INTÉZMÉNY: A feladatellátási helyen a tanulói létszám 142 fő, ebből 87 fő hátrányos helyzetű, 108 fő pedig halmozottan hátrányos helyzetű. A feladatellátási hely jelenlegi kihasználtsága 61 %-os. Az iskolaelhagyás, lemorzsolódás mértéke 31,25 %-os. Tanárok száma: 15 fő. A jelenlegi infrastruktúra: Főépület és tornaterem, valamint különálló régi épület, összesen 11 terem és a folyosó, 6 db vizesblokk, e mellett igazgatói iroda és nevelői szoba. A BERUHÁZÁS TERVEZETT ELEMEI: Önállóan támogatható tevékenységek: 1. Mindennapos testnevelés: tornaterem, valamint kiszolgálóhelységei felújítása, 2. A nevelés-oktatáshoz használt termek, azok elérését biztosító folyosók felújítása. Választható, önállóan nem támogatható tevékenységek: 1. Beázások, födémhibák megszüntetése, 2 Mellékhelyiségek felújítása, 3. Energetikai korszerűsítés keretében nyílászárók cseréje, hőszigetelés, fűtés korszerűsítés. A kivitelezés során a létesítmények, térhasználat közlekedési kapcsolatok tervezésekor kiemelten figyelembe vételre és érvényesítésre kerülnek az egyetemes tervezés elvei, azaz a nők és férfiak igényei, az idősek, a fogyatékosok és a gyermekek igényei, továbbá a projektarányos akadálymentesítés. (Hungarian)
0 references
THE AIM OF THE PROJECT IS TO: The aim of the project is to develop the infrastructural areas of the Szalasendi District Primary School. The estimated gross investment cost of this project is HUF 20 million. THE INSTITUTION TO BE DEVELOPED SHALL: The number of pupils in the job area is 142, of which 87 are disadvantaged and 108 are cumulatively disadvantaged. The current take-up of the assignment site is 61 %. The rate of school leaving and early school leaving is 31.25 %. Number of teachers: 15 people. Current infrastructure: Main building and gym, as well as a separate old building, a total of 11 rooms and corridors, 6 sanitary facilities, together with a director’s office and a tutor’s room. PLANNED ELEMENTS OF THE INVESTMENT: Self-eligible activities: 1. Everyday physical education: refurbishment of the gym and its service areas, 2. Refurbishment of the rooms used for education and training, the corridors to which they are accessible. Optional, ineligible actions: 1. Wetting, removal of floor defects, 2 Renovation of accommodation, 3. Energy modernisation in the framework of replacement of doors and windows, thermal insulation, heating upgrade. During the construction, the principles of universal design, i.e. the needs of women and men, the needs of the elderly, the disabled and the children, as well as accessibility in proportion to the project, are taken into account and enforced in the planning of transport connections. (English)
8 February 2022
0 references
L’OBJECTIF DU PROJET EST DE: L’objectif du projet est de développer les zones d’infrastructure de l’école primaire du district de Szalasendi. Le coût brut d’investissement de ce projet est estimé à 20 millions de HUF. L’INSTITUTION À DÉVELOPPER: Le nombre d’élèves dans le domaine de l’emploi est de 142, dont 87 sont défavorisés et 108 sont globalement désavantagés. L’utilisation actuelle du site d’affectation est de 61 %. Le taux d’abandon scolaire et d’abandon scolaire est de 31,25 %. Nombre d’enseignants: 15 personnes. Infrastructure actuelle: Bâtiment principal et salle de gym, ainsi qu’un ancien bâtiment séparé, un total de 11 chambres et couloirs, 6 sanitaires, ainsi qu’un bureau de directeur et une salle de tuteur. ÉLÉMENTS PRÉVUS DE L’INVESTISSEMENT: Activités auto-éligibles: 1. Éducation physique quotidienne: remise à neuf de la salle de sport et de ses aires de service, 2. Remise à neuf des salles utilisées pour l’éducation et la formation, les couloirs auxquels elles sont accessibles. Actions facultatives et inéligibles: 1. Mouillage, enlèvement des défauts de sol, 2 Rénovation des locaux, 3. Modernisation de l’énergie dans le cadre du remplacement des portes et des fenêtres, isolation thermique, mise à niveau du chauffage. Au cours de la construction, les principes de conception universelle, c’est-à-dire les besoins des femmes et des hommes, les besoins des personnes âgées, des handicapés et des enfants, ainsi que l’accessibilité proportionnelle au projet, sont pris en compte et appliqués dans la planification des liaisons de transport. (French)
10 February 2022
0 references
ZIEL DES PROJEKTS IST ES, Ziel des Projekts ist die Entwicklung der Infrastrukturbereiche der Grundschule Szalasendi. Die geschätzten Bruttoinvestitionskosten dieses Projekts belaufen sich auf 20 Mio. HUF. DAS ZU ENTWICKELNDE INSTITUT Die Zahl der Schüler im Arbeitsbereich beträgt 142, davon sind 87 benachteiligt und 108 sind kumuliert benachteiligt. Der aktuelle Einsatzort beträgt 61 %. Der Anteil der Schulabgänger und der vorzeitigen Schulabgänger liegt bei 31,25 %. Anzahl der Lehrer: 15 Personen. Aktuelle Infrastruktur: Hauptgebäude und Fitnessraum, sowie ein separates altes Gebäude, insgesamt 11 Zimmer und Flure, 6 Sanitäreinrichtungen, zusammen mit einem Direktorsbüro und einem Tutorzimmer. GEPLANTE ELEMENTE DER INVESTITION: Selbst förderfähige Tätigkeiten: 1. Tägliche körperliche Erziehung: Renovierung des Fitnessstudios und seiner Servicebereiche, 2. Renovierung der für die allgemeine und berufliche Bildung genutzten Räume, die Korridore, für die sie zugänglich sind. Fakultative, nicht förderfähige Maßnahmen: 1. Benetzung, Beseitigung von Bodenfehlern, 2 Renovierung der Unterkunft, 3. Energiemodernisierung im Rahmen des Austauschs von Türen und Fenstern, Wärmedämmung, Heizungsaufrüstung. Während des Baus werden die Grundsätze der universellen Gestaltung, d. h. die Bedürfnisse von Frauen und Männern, die Bedürfnisse älterer Menschen, Behinderter und Kinder sowie die Zugänglichkeit im Verhältnis zum Projekt berücksichtigt und bei der Planung der Verkehrsverbindungen durchgesetzt. (German)
11 February 2022
0 references
Szalaszend, Borsod-Abaúj-Zemplén
0 references
Identifiers
EFOP-4.1.3-17-2017-00095
0 references