Main road 8 Székesfehérvár Western bypass construction of Stage III — phased project (Q3942929): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Adding French translations)
(‎Removed claims)
Property / co-financing rate
64.234377 percent
Amount64.234377 percent
Unitpercent
 
Property / co-financing rate: 64.234377 percent / rank
Normal rank
 
Property / EU contribution
19,549,893,706 forint
Amount19,549,893,706 forint
Unitforint
 
Property / EU contribution: 19,549,893,706 forint / rank
Normal rank
 
Property / EU contribution
54,059,561.58 Euro
Amount54,059,561.58 Euro
UnitEuro
 
Property / EU contribution: 54,059,561.58 Euro / rank
Preferred rank
 
Property / EU contribution: 54,059,561.58 Euro / qualifier
exchange rate to Euro: 0.00276521 Euro
Amount0.00276521 Euro
UnitEuro
 
Property / EU contribution: 54,059,561.58 Euro / qualifier
point in time: 4 December 2021
Timestamp+2021-12-04T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
83,199,068.892 Euro
Amount83,199,068.892 Euro
UnitEuro
 
Property / budget: 83,199,068.892 Euro / rank
Preferred rank
 
Property / budget: 83,199,068.892 Euro / qualifier
exchange rate to Euro: 0.0027336256 Euro
Amount0.0027336256 Euro
UnitEuro
 
Property / budget: 83,199,068.892 Euro / qualifier
point in time: 15 December 2021
Timestamp+2021-12-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
30,435,429,376.965 forint
Amount30,435,429,376.965 forint
Unitforint
 
Property / budget: 30,435,429,376.965 forint / rank
Normal rank
 

Revision as of 14:33, 13 February 2022

Project Q3942929 in Hungary
Language Label Description Also known as
English
Main road 8 Székesfehérvár Western bypass construction of Stage III — phased project
Project Q3942929 in Hungary

    Statements

    0 references
    0 references
    24 June 2013
    0 references
    31 December 2016
    0 references
    NIF Nemzeti Infrastruktúra Fejlesztő zártkörűen működő Részvénytársaság
    0 references
    0 references

    47°11'27.67"N, 18°24'38.92"E
    0 references
    Új építésű 2x2 sávos főút, a hozzá tartozó csomópontokkal, műtárgyakkal területbiztosítást szolgáló keresztező és párhuzamos utakkal, a szükséges közmű kiváltásokkal, környezet és természetvédelmi munkákkal kompletten. Főpálya műszaki paraméterei: • Útkategória: K III. A • Forgalmi sávok száma: 2x2 • Tervezési sebesség Vt=110 km/h • Korona szélesség: 23,6 m • Burkolat szélesség:2x7,5 m • Út hossza: ~6720 m 2x2 forgalmi sávos, kiemelt sebességű elsőrendű új nyomvonalú főút építése, 2 db különszintű csomóponttal, kapcsolódó építményekkel, környezetvédelmi, és vízépítési, és egyéb munkákkal kompletten. Főbb mennyiségek: Főpálya hossza: 6719,49 m Főbb műszaki adatok: Tervezési sebesség:110 km/h Koronaszélesség:23,60 m Burkolat szélesség: 2x7,50 m Forgalmi sáv száma: 2x2 Stabilizált padka szélessége: 2,25 m Keresztező földutak, párhuzamos szervízutak: Keresztező földutak 2db, párhuzamos szervízutak 17db, összesen mintegy 11 250 m hosszban Aszalvölgyi árok mederrendezése mintegy 1 750 m hosszon. Műtárgyak: Közúti híd műtárgy 8 db, amelyből 4 db 30 métert meghaladó össznyílású. Közmű kiváltások: 13 db, ebből hírközlő vezetékek 3 db ~7 355m, kis- és középfeszültségű vezeték 3 db ~450m, nagyfeszültségű vezetékek 3 db ~920m, vízi közmű vezeték 1 db ~1000m, szénhidrogén vezetékek 3 db ~1 090 m (Hungarian)
    0 references
    Newly built 2x2 lane main road, complete with intersections and parallel roads for area insurance with associated junctions and artefacts, necessary public utility changes, environment and nature conservation works. Technical parameters of the main track: • Road category: K III A • Number of traffic lanes: 2x2 • Design speed Vt=110 km/h • Crown width: 23.6 m • Burkolat szélesség:2x7,5 m • Length of road: ~6720 m 2x2 traffic lane, high-speed first-class new tracked main road, complete with 2 separate level junctions, related structures, environmental protection, water engineering and other works. Main quantities: Main track length: 6 719.49 m Main technical data: Design sebesség:110 km/h Koronaszélesség:23.60 m Envelope width: 2x7.50 m Number of traffic bands: 2x2 Stabilised Bench Width: 2.25 m crossroads, parallel service lines: Cross-roads 2,2, parallel service roads 17pcs, a total length of about 11 250 m for the settlement of the rivers of Aszalvölgyi ditches on a length of 1 750 m. Works of art: Road bridge artifact 8, of which 4 have an overall opening of more than 30 metres. Public utility replacements: 13 pcs, of which communication lines 3 pcs ~7 355 m, low and medium voltage line 3 pcs ~450m, high voltage lines 3 pcs ~920m, water utility line 1 pcs ~1000m, hydrocarbon lines 3 pcs ~1 090 m (English)
    9 February 2022
    0 references
    Route principale 2x2 nouvellement construite, avec intersections et routes parallèles pour l’assurance de la zone avec jonctions et artefacts associés, changements nécessaires d’utilité publique, travaux de protection de l’environnement et de la nature. Paramètres techniques de la voie principale: • Catégorie routière: K III A • Nombre de voies de circulation: 2x2 • Vitesse de conception Vt=110 km/h • Largeur de la couronne: 23,6 m • Burkolat szélesség:2x7,5 m • Longueur de la route: ~6720 m 2x2 voie de circulation, nouvelle route principale à grande vitesse de première classe, avec 2 jonctions de niveau séparées, des structures connexes, la protection de l’environnement, l’ingénierie de l’eau et d’autres travaux. Principales quantités: Longueur de la voie principale: 6 719,49 m Caractéristiques techniques principales: Conception sebesség:110 km/h Koronaszélesség:23,60 m Largeur de l’enveloppe: 2x7,50 m Nombre de bandes de circulation: Largeur de banc stabilisée 2x2: 2,25 m carrefour, lignes de service parallèles: Carrefour 2,2, routes de service parallèles 17pcs, une longueur totale d’environ 11 250 m pour le peuplement des rivières d’Aszalvölgyi fossés sur une longueur de 1 750 m. Œuvres d’art: Pont routier artefact 8, dont 4 ont une ouverture globale de plus de 30 mètres. Remplacement des services publics: 13 PCs, dont lignes de communication 3 PCs ~ 7 355 m, ligne basse et moyenne tension 3 PCs ~450m, lignes haute tension 3 PCs ~ 920 m, ligne de service d’eau 1 pcs ~1000m, lignes d’hydrocarbures 3 PCs ~1 090 m (French)
    10 February 2022
    0 references
    Székesfehérvár, Fejér
    0 references

    Identifiers

    IKOP-1.1.0-15-2016-00007
    0 references