Installation of a solar system at KTS Metalworks Ltd.'s Bátonyterenye site (Q3934112): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Adding French translations)
(‎Removed claims)
Property / co-financing rate
55.0 percent
Amount55.0 percent
Unitpercent
 
Property / co-financing rate: 55.0 percent / rank
Normal rank
 
Property / EU contribution
16,798,900 forint
Amount16,798,900 forint
Unitforint
 
Property / EU contribution: 16,798,900 forint / rank
Normal rank
 
Property / EU contribution
46,452.49 Euro
Amount46,452.49 Euro
UnitEuro
 
Property / EU contribution: 46,452.49 Euro / rank
Preferred rank
 
Property / EU contribution: 46,452.49 Euro / qualifier
exchange rate to Euro: 0.00276521 Euro
Amount0.00276521 Euro
UnitEuro
 
Property / EU contribution: 46,452.49 Euro / qualifier
point in time: 3 December 2021
Timestamp+2021-12-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
83,494.369 Euro
Amount83,494.369 Euro
UnitEuro
 
Property / budget: 83,494.369 Euro / rank
Preferred rank
 
Property / budget: 83,494.369 Euro / qualifier
exchange rate to Euro: 0.0027336256 Euro
Amount0.0027336256 Euro
UnitEuro
 
Property / budget: 83,494.369 Euro / qualifier
point in time: 15 December 2021
Timestamp+2021-12-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
30,543,454.545 forint
Amount30,543,454.545 forint
Unitforint
 
Property / budget: 30,543,454.545 forint / rank
Normal rank
 

Revision as of 11:11, 13 February 2022

Project Q3934112 in Hungary
Language Label Description Also known as
English
Installation of a solar system at KTS Metalworks Ltd.'s Bátonyterenye site
Project Q3934112 in Hungary

    Statements

    0 references
    1 April 2020
    0 references
    31 March 2022
    0 references
    KTS METALWORKS Fémipari Korlátolt Felelősségű Társaság
    0 references
    0 references

    48°0'21.71"N, 19°47'5.64"E
    0 references
    A fejlesztés céljául szolgáló, hálózatra csatlakoztatott fotovoltaikus rendszer segítségével villamos energiát állítunk elő. Az ingatlan tetőfelületére a projekt során 161 db KS-310M napelem modult telepítünk. A napelemes modulokat villamosan összekapcsoljuk, majd 2 db Eco 25.0-3-S inverterre kötjük. A rendszer ára nettó 16 798 900 Ft. Az egy tonna üvegházhatást okozó gázok éves csökkentésére vetített elszámolható összköltség 406,73 ezer Ft/t CO2. A rendszer fajlagos beruházási költsége 336 584 eFt/kWp. A fejlesztésnek köszönhetően a következő mutatók javulását várjuk: ÜHG csökkenés: 41,3 t (CO2)/év ÜHG éves csökkenésének aránya a fejlesztés előtti kibocsátáshoz képest: 61,46% Napelemes rendszer éves primer energia megtakarítása: 82 351 kWh/év Primerenergia megtakarítás aránya: 36,87% Előkészítő tevékenységeink: • Statikai szakvélemény készíttetése • Napelemes kivitelező felkeresése, helyszíni szemlén egyeztetés, árajánlatkérés • Energetikus felkeresése, energetikai háttér számítások elvégzése • Műszaki ellenőrrel egyeztetés, árajánlatkérés • Pályázati dokumentáció összeállítása (Hungarian)
    0 references
    We produce electricity using a photovoltaic system connected to the network for the purpose of development. During the project, 161 KS-310M solar panel modules will be installed on the roof surface of the property. The solar modules are electrically connected and connected to 2 Eco 25.0-3-S inverters. The price of the system is 16 798 900 HUF net. The total eligible cost per tonne of greenhouse gas reduction per year is HUF 406.73 000/t CO2. The unit investment cost of the scheme is HUF 336 584/kWp. Thanks to the development, we expect the following indicators to improve: GHG reduction: Percentage of annual GHG reduction of 41.3 t (CO2)/year compared to pre-development emissions: 61.46 % Solar System annual primary energy savings: 82 351 kWh/year Primer energy savings: 36.87 % Preparatory activities: • Preparation of static expert opinion • Visit of solar panel contractor, consultation at on-site inspection, request for quotation • Energy visits, energy background calculations • Conciliation with a technical inspector, request for quotation • Compilation of tender documentation (English)
    8 February 2022
    0 references
    Nous produisons de l’électricité à l’aide d’un système photovoltaïque connecté au réseau aux fins de développement. Au cours du projet, 161 modules de panneaux solaires KS-310M seront installés sur le toit de la propriété. Les modules solaires sont connectés électriquement et connectés à 2 onduleurs Eco 25.0-3-S. Le prix du système est de 16 798 900 HUF net. Le coût total admissible par tonne de réduction des gaz à effet de serre par an est de 406,73000 HUF/t de CO2. Le coût unitaire d’investissement du régime s’élève à 336 584/kWp. Grâce à cette évolution, nous nous attendons à ce que les indicateurs suivants s’améliorent: Réduction des GES: Pourcentage de réduction annuelle des GES de 41,3 t (CO2)/an par rapport aux émissions antérieures au développement: 61,46 % d’économies annuelles d’énergie primaire du système solaire: 82 351 kWh/an Économies d’énergie d’amorce: 36,87 % Activités préparatoires: • Préparation de l’avis d’expert statique • Visite du contractant du panneau solaire, consultation lors de l’inspection sur place, demande de devis • Visites énergétiques, calculs de fond énergétique • Conciliation avec un inspecteur technique, demande de devis • Compilation de la documentation de l’appel d’offres (French)
    10 February 2022
    0 references
    Bátonyterenye, Nógrád
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-00633
    0 references