Installation of solar system at Derby-Túr Kft. (Q3933051): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Adding French translations) |
(Removed claims) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 100.0 percent / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 1,400,000 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 3,871.29 Euro / rank | |||||||||||||||
Property / EU contribution: 3,871.29 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 3,871.29 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 3,827.076 Euro / rank | |||||||||||||||
Property / budget: 3,827.076 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 3,827.076 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 1,400,000.0 forint / rank | |||||||||||||||
Revision as of 10:47, 13 February 2022
Project Q3933051 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of solar system at Derby-Túr Kft. |
Project Q3933051 in Hungary |
Statements
18 December 2019
0 references
30 June 2020
0 references
DERBY-TÚR Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
0 references
A projekt keretében a Derby-Túr Kft. 5400 Mezőtúr, Széchenyi István u. 24. cím alatti székhelyén hajt végre napelemes rendszer telepítést. A fejlesztés során a székhely épületén egy 7 kW-os rendszer kerül telepítésre. A telepítésre kerülő rendszer 30 db CSUN polikristályos napelem cellából és 1 db GROWATT 7000TL3-S (7 kW) inverterből, valamint a működéshez szükséges további eszközök (kábelek, csatlakozók, stb.) áll. A rendszer mérete az előző évi villanyszámlák alapján került meghatározásra. A telepítést követően várhatóan nagymértékben csökken a cég nem megújuló energiából előállított energiafogyasztása. A fejlesztés jelentős mértékben hozzájárul a hazai és uniós törekvésekhez a megújuló energia hasznosítás/kapacitások növelése és a károsanyag-kibocsátás csökkenése terén. (Hungarian)
0 references
In the framework of the project, Derby-Túr Kft. 5400 Mezőtúr, Széchenyi István u. 24. During the development, a 7 kW system will be installed on the headquarters building. The system to be installed consists of 30 CSUN polycrystalline solar cells and 1 Growatt 7000TL3-S (7 kW) inverter, as well as additional tools (cables, connectors, etc.). The size of the system is determined on the basis of the electricity bills of the previous year. After installation, the company’s energy consumption from non-renewable energy is expected to decrease significantly. Development contributes significantly to domestic and EU efforts to increase renewable energy utilisation/capacity and reduce emissions. (English)
8 February 2022
0 references
Dans le cadre du projet, Derby-Túr Kft. 5400 Mezőtúr, Széchenyi István u. 24. Au cours du développement, un système de 7 kW sera installé sur le bâtiment du siège. Le système à installer se compose de 30 cellules solaires polycristallines CSUN et d’onduleur 1 Growatt 7000TL3-S (7 kW), ainsi que d’outils supplémentaires (câbles, connecteurs, etc.). La taille du système est déterminée sur la base des factures d’électricité de l’année précédente. Après l’installation, la consommation d’énergie de l’entreprise à partir d’énergies non renouvelables devrait diminuer considérablement. Le développement contribue de manière significative aux efforts nationaux et européens visant à accroître l’utilisation/la capacité d’utilisation des énergies renouvelables et à réduire les émissions. (French)
10 February 2022
0 references
Mezőtúr, Jász-Nagykun-Szolnok
0 references
Identifiers
GINOP-4.1.3-19-2019-01376
0 references