Building energy renovation of the GARDA Hotel (Q3924961): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Adding French translations) |
(Removed claims) |
||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 35.18557 percent / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 65,757,076 forint / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 181,832.12 Euro / rank | |||||||||||||||
Property / EU contribution: 181,832.12 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 181,832.12 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 510,871.444 Euro / rank | |||||||||||||||
Property / budget: 510,871.444 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 510,871.444 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 186,884,203.945 forint / rank | |||||||||||||||
Revision as of 10:19, 13 February 2022
Project Q3924961 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Building energy renovation of the GARDA Hotel |
Project Q3924961 in Hungary |
Statements
10 November 2019
0 references
29 December 2021
0 references
NTS Hotel Garda Idegenforgalmi Korlátolt Felelősségű Társaság
0 references
A projekt előkészítő szakaszában a szükséges műszaki tervek elkészültek, valamint a felhívás elvárásainak megfelelően a statikai szakvéleményt is elkészítette a felkért szakember, a napelemes rendszer kiépítése okán a tető tartószerkezeti elemei is megvizsgálásra kerültek. Elkészült az épület értékbecslése is, mely szükséges volt a hitel felvételéhez. Az épületre elkészültek az energetikai tanúsítványok, az épület beruházás megvalósítását megelőző (kiinduló) állapotára vonatkozó hitelesített energetikai tanúsítvány, az energiahatékonysági fejlesztések hatására bekövetkező (köztes) állapotot valamint a beruházás megvalósítását követő (tervezett) állapotot rögzítő, tanúsító program használatával készített 7/2006. (V.24.) TNM rendelet szerinti számítás. A kiválasztott energetikus szakemberrel történt többszöri egyeztetés a fejlesztési elemek tekintetében, a megvalósítási helyszínen több alkalommal történt helyszíni bejárás. A beruházási elemek nem építési engedély köteles tevékenységek, így engedélyezési eljárás nem hátráltatta a pályázat benyújtását.A projekt megvalósításának legfontosabb lépései: A pályázat elbírálása után a feltételes vállalkozási szerződés hatályba lép, mely után rövid időn belül megkezdődhet a beruházás a munkaterület átadásával. A kivitelező cég folyamatos egyeztetést fog folytatni a tulajdonost képviselő műszaki ellenőrrel, aki biztosítja a zavartalan és hibátlan munkavégzést. A munkálatok a nyílászárók cseréjével fognak kezdődni, mely a hotel tulajdonosával egyeztetve szakaszosan történik majd, az épp megszálló vendégek zavarásának minimalizálása mellett. A nyílászárók kicserélése után kezdődnek meg a hőszigetelési munkák. A hőszivattyú beépítése az épületen kívül eső területre történik meg, mely előreláthatóan 10 napot vesz igénybe. A 30 kW-os napelemes rendszer az épület tetejére fog kerülni, keleti és nyugati tájolással. A kötelező nyilvánosság feladatai a projekt megvalósítási időszakában kezdődnek meg, a Széchenyi 2020 Kedvezményezettek Tájékoztatási Kötelezettségei útmutató és arculati kézikönyv „KTK 2020“ projektre vonatkozó előírásainak megfelelően. 30 kW napelemes rendszer elemei: CanadianSolar 270 Wp polikristályos napelemek, valamint Fronius Symo 10.0.3-3 fázisú inverter. A napelem panelekre 12 év termékgarancia valamint 30 év teljesítménygarancia érvényes, ami azt jelenti, hogy a panelek 30 év múlva legalább 80,6%-os teljesítményt nyújtanak újkori névleges teljesítményükhöz képest. Jelen inverterre 7 év gyártói garancia érvényes. Működési elve: A napelemek speciális (szilícium) felülete által termelt villamos energia egy speciális egyenáram-váltakozó áramú átalakítóba jut, mely így alkalmassá válik az elektromos hálózatba való betáplálásra. A betáplált villamos energiát egy a szolgáltató által nyújtott ad-vesz mérőóra regisztrálja. Az óra két regisztrált értéket jelez. A megtermeltet és az elfogyasztott értékeket. 58 kW hőszivattyú: A hőszivattyú a környezet energiáját hasznosító készülék, mely a környezeti hőt egy alacsonyabb hőfokszintről egy magasabb hőfokszintre emeli (külső elektromos energia felhasználásával) hőcserélők segítségével. . A VULCANO hőszivattyúval az ingatlan fűtését és használati melegvíz ellátását is biztosíthatjuk. A hőszivattyúnak káros anyag kibocsátása nincs. A VMA készülék saját, egyedileg fejlesztett szabályozó és vezérlő eszközzel rendelkezik.vezérlés teljesen automatikusan szabályozza a gép működését. (Hungarian)
0 references
During the preparatory phase of the project, the necessary technical plans were completed, and in accordance with the requirements of the call, the requested expert also prepared the static expert, and due to the construction of the solar system, the supporting elements of the roof were also examined. The value assessment of the building was also completed, which was necessary to obtain the loan. The energy certificates, the certified energy certificate for the (initial) state of the building prior to the implementation of the project, the (intermediate) status resulting from energy efficiency improvements and the (planned) status after the implementation of the project have been completed for the building 7/2006. Calculation in accordance with Decree No 24/2000 of the Minister for National Development (V.24.) Several meetings were held with the selected energetic specialist regarding the development elements, several on-the-spot visits took place at the implementation site. The investment elements are not subject to building permits, so the permit procedure did not hinder the submission of the application.The most important steps in the implementation of the project are: Following the evaluation of the tender, the conditional business contract enters into force, after which the project can start shortly after the transfer of the work area. The construction company will continue to consult with the technical inspector representing the owner, who will ensure the uninterrupted and flawless work. The works will begin with the replacement of doors and windows, which will be carried out in consultation with the hotel owner, while minimising the interference of the occupant guests. After replacement of doors and windows, thermal insulation works begin. The installation of the heat pump takes place outside the building, which is expected to take 10 days. The 30 kW solar panel system will be placed on the roof of the building with orientation to the east and west. The tasks of the mandatory public will start during the implementation period of the project, in accordance with the provisions of the Széchenyi 2020 Beneficiaries’ Information Obligations Guide and Identification Manual for the “KTK 2020” project. 30 kW solar system elements: CanadianSolar 270 Wp polycrystalline solar panels and Fronius SYMO 10.0.3-3 phase inverter. Solar panels are subject to 12 years of product warranty and 30 years of performance guarantee, which means that after 30 years, the panels will provide at least 80.6 % of their rated power. This inverter is subject to a manufacturer’s warranty of 7 years. Working principle: The electricity produced by the special surface of solar panels (silicon) is transferred to a special DC to AC converter, which is suitable for feeding into the electricity grid. The feed-in electricity is recorded by an ad buy meter provided by the supplier. The clock indicates two recorded values. The produced and consumed values. 58 kW heat pump: The heat pump is a device that uses the energy of the environment, which raises ambient heat from a lower temperature to a higher temperature (using external electrical energy) using heat exchangers. . With the VULCANO heat pump, you can also provide heating and domestic hot water supply of the property. The heat pump has no pollutant emissions. The VMA device has its own individually developed control and control device. Control controls fully automatically control the operation of the machine. (English)
8 February 2022
0 references
Au cours de la phase préparatoire du projet, les plans techniques nécessaires ont été achevés et, conformément aux exigences de l’appel, l’expert demandé a également préparé l’expert statique et, en raison de la construction du système solaire, les éléments de support du toit ont également été examinés. L’évaluation de la valeur du bâtiment a également été achevée, ce qui était nécessaire pour obtenir le prêt. Les certificats énergétiques, le certificat énergétique certifié pour l’état (initial) du bâtiment avant la mise en œuvre du projet, le statut (intermédiaire) résultant d’améliorations de l’efficacité énergétique et l’état (prévu) après la mise en œuvre du projet pour le bâtiment 7/2006. Calcul conformément au décret no 24/2000 du ministre du développement national (V.24.) Plusieurs réunions ont eu lieu avec le spécialiste de l’énergie sélectionné au sujet des éléments de développement, plusieurs visites sur place ont eu lieu sur le site de mise en œuvre. Les éléments d’investissement ne sont pas soumis à des permis de construire, de sorte que la procédure d’autorisation n’a pas entravé la présentation de la demande.Les étapes les plus importantes de la mise en œuvre du projet sont les suivantes: À la suite de l’évaluation de l’offre, le contrat d’entreprise conditionnel entre en vigueur, après quoi le projet peut commencer peu après le transfert de la zone de travail. L’entreprise de construction continuera de consulter l’inspecteur technique représentant le propriétaire, qui s’assurera des travaux ininterrompus et irréprochables. Les travaux commenceront par le remplacement des portes et des fenêtres, qui sera effectué en consultation avec le propriétaire de l’hôtel, tout en minimisant l’interférence des occupants invités. Après le remplacement des portes et des fenêtres, les travaux d’isolation thermique commencent. L’installation de la pompe à chaleur a lieu à l’extérieur du bâtiment, ce qui devrait prendre 10 jours. Le système de panneaux solaires de 30 kW sera placé sur le toit du bâtiment avec une orientation vers l’est et l’ouest. Les tâches du public obligatoire débuteront au cours de la période de mise en œuvre du projet, conformément aux dispositions du guide des obligations d’information et du manuel d’identification des bénéficiaires de Széchenyi 2020 pour le projet «KTK 2020». Éléments du système solaire de 30 kW: Panneaux solaires polycristallins CanadianSolar 270 Wp et onduleur de phase Fronius SYMO 10.0.3-3. Les panneaux solaires sont soumis à 12 ans de garantie produit et 30 ans de garantie de performance, ce qui signifie qu’après 30 ans, les panneaux fourniront au moins 80,6 % de leur puissance nominale. Cet onduleur est soumis à une garantie du fabricant de 7 ans. Principe de fonctionnement: L’électricité produite par la surface spéciale des panneaux solaires (silicium) est transférée vers un convertisseur spécial DC vers AC, qui est adapté pour alimenter le réseau électrique. L’électricité de rachat est enregistrée par un compteur d’achat d’annonces fourni par le fournisseur. L’horloge indique deux valeurs enregistrées. Les valeurs produites et consommées. Pompe à chaleur de 58 kW: La pompe à chaleur est un dispositif qui utilise l’énergie de l’environnement, qui élève la chaleur ambiante d’une température inférieure à une température plus élevée (en utilisant l’énergie électrique externe) à l’aide d’échangeurs de chaleur. . Avec la pompe à chaleur VULCANO, vous pouvez également fournir le chauffage et l’approvisionnement en eau chaude domestique de la propriété. La pompe à chaleur n’a pas d’émissions polluantes. L’appareil VMA a son propre dispositif de contrôle et de contrôle développé individuellement. Les commandes de contrôle contrôlent entièrement le fonctionnement de la machine. (French)
10 February 2022
0 references
Szombathely, Vas
0 references
Identifiers
GINOP-4.1.1-8-4-4-16-2017-00198
0 references