CHIEF OF BENEVENTO III — PONTELANDOLFO (Q2021719): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: The budget was changed) |
(Removed claims) |
||||||
Property / budget | |||||||
| |||||||
Property / budget: 10,512,924.34 Euro / rank | |||||||
Property / EU contribution | |||||||
| |||||||
Property / EU contribution: 0.0 Euro / rank | |||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 0.0 percent / rank | |||||||
Revision as of 02:56, 11 February 2022
Project Q2021719 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | CHIEF OF BENEVENTO III — PONTELANDOLFO |
Project Q2021719 in Italy |
Statements
10 October 2017
0 references
31 July 2019
0 references
TERNA - RETE ELETTRICA NAZIONALE
0 references
L'OPERA DI CUI TRATTASI RIGUARDA LA REALIZZAZIONE DI UN NUOVO ELETTRODOTTO IN LINEA AEREA 150 KV SEMPLICE TERNA BINATA TRA LA S.E. DI PONTELANDOLFO E LA S.E. BENEVENTO III DA UNA PALIFICAZIONE A SEMPLICE TERNA ARMATA CON TRE FASI CIASCUNA COMPOSTA DA UN FASCIO DI 2 CONDUTTORI DI ENERGIA E DUE CORDE DI GUARDIA, FINO AL RAGGIUNGIMENTO DEI SOSTEGNI CAPOLINEA LO STESSO ASSETTO CON FASCIO DI CONDUTTORI BINATO, SI HA TRA IL SOSTEGNO CAPOLINEA E I PORTALI DI STAZIONE. IL PROGETTO SARÃ CARATTERIZZATO DA SOLUZIONI INNOVATIVE QUALI DTR, STAZIONI METEO, STAZIONI MONITORAGGIO FRANE, BIRD STRIKE INDICATOR, BIRD CAM E INSERIMENTO FIBRA OTTICA. (Italian)
0 references
THE WORK IN QUESTION CONCERNS THE CONSTRUCTION OF A NEW 150 KV OVERHEAD POWER LINE TERNA BETWEEN THE S.E. OF PONTELANDOLFO AND S.E. III BY A SIMPLE TERNA ARMED TERNA, WITH THREE STEPS EACH CONSISTING OF A BEAM OF 2 ENERGY CONDUCTORS AND TWO ROPES ON CALL, UP TO THE LEVEL OF THE SAME STRUCTURE WITH BEATS OF CONDUCTORS, BETWEEN THE TERMINAL SUPPORT AND THE STATION PORTALS. THE PROJECT WILL BE CHARACTERISED BY INNOVATIVE SOLUTIONS SUCH AS DTR, WEATHER STATIONS, MONITORING LANDSLIDES, BIRD STRIKES, BIRD CAM AND FIBRE OPTIC INPUT. (English)
0 references
LES TRAVAUX EN QUESTION CONCERNENT LA CONSTRUCTION D’UNE NOUVELLE LIGNE ÉLECTRIQUE TERNA SIMPLE DE 150 KV ENTRE LA S.E. DE PONTELANDOLFO ET LA S.E. BENEVENTO III À PARTIR D’UN SIMPLE PIÉTEMENT TERNA AVEC TROIS PHASES CHACUNE COMPOSÉES D’UN FAISCEAU DE 2 CONDUCTEURS D’ÉNERGIE ET DE DEUX CORDES DE PROTECTION, JUSQU’À LA FIN DE LA LIGNE SOUTIENT LA MÊME DISPOSITION AVEC FAISCEAU DE DOUBLES CONDUCTEURS, ENTRE LE SUPPORT TERMINAL ET LES PORTAILS DE LA STATION. LE PROJET COMPRENDRA DES SOLUTIONS INNOVANTES TELLES QUE DTR, STATIONS MÉTÉOROLOGIQUES, STATIONS DE SURVEILLANCE DES GLISSEMENTS DE TERRAIN, INDICATEUR DE COLLISION D’OISEAUX, CAME À OISEAUX ET INSERTION DE FIBRES OPTIQUES. (French)
14 December 2021
0 references
DE BETROKKEN WERKZAAMHEDEN HEBBEN BETREKKING OP DE BOUW VAN EEN NIEUWE 150 KV EENVOUDIGE TERNA BOVENLEIDING TUSSEN DE S.E. VAN PONTELANDOLFO EN S.E. BENEVENTO III UIT EEN EENVOUDIGE TERNA STAPELING MET DRIE FASEN, ELK BESTAANDE UIT EEN STRAAL VAN 2 ENERGIEGELEIDERS EN TWEE WACHTKABELS, TOT HET EINDE VAN DE LIJN DEZELFDE OPSTELLING ONDERSTEUNT MET EEN BUNDEL VAN TWEE GELEIDERS, TUSSEN DE TERMINALSTEUN EN DE STATIONSPOORTEN. HET PROJECT ZAL INNOVATIEVE OPLOSSINGEN BEVATTEN ZOALS DTR, WEERSTATIONS, AARDVERSCHUIVINGEN MONITORINGSTATIONS, VOGELAANVALINDICATOR, VOGELCAMERA EN GLASVEZELINBRENGING. (Dutch)
23 December 2021
0 references
DIE IN REDE STEHENDEN ARBEITEN BETREFFEN DEN BAU EINER NEUEN 150 KV EINFACHEN TERNA-OVERLINE-STROMLEITUNG ZWISCHEN DEN S.E. VON PONTELANDOLFO UND S.E. BENEVENTO III AUS EINEM EINFACHEN TERNA-PILLING MIT JEWEILS DREI PHASEN, BESTEHEND AUS EINEM BALKEN AUS 2 ENERGIELEITERN UND ZWEI SCHUTZSEILEN, BIS DAS ENDE DER LINIE DIE GLEICHE ANORDNUNG MIT DEM BALKEN VON ZWILLINGSLEITERN, ZWISCHEN DER KLEMMSTÜTZE UND DEN STATIONSPORTALEN, UNTERSTÜTZT. DAS PROJEKT WIRD INNOVATIVE LÖSUNGEN WIE DTR, WETTERSTATIONEN, ERDRUTSCH-ÜBERWACHUNGSSTATIONEN, VOGELSTREIKANZEIGER, VOGELKAMERAS UND LWL-EINSATZ BIETEN. (German)
24 December 2021
0 references
LA OBRA EN CUESTIÓN SE REFIERE A LA CONSTRUCCIÓN DE UNA NUEVA LÍNEA ELÉCTRICA SIMPLE TERNA DE 150 KV ENTRE LA S.E. DE PONTELANDOLFO Y S.E. BENEVENTO III A PARTIR DE UN SIMPLE APILAMIENTO TERNA CON TRES FASES CADA UNA CONSISTENTE EN UN HAZ DE 2 CONDUCTORES DE ENERGÍA Y DOS CUERDAS DE PROTECCIÓN, HASTA QUE EL FINAL DE LA LÍNEA SOPORTA LA MISMA DISPOSICIÓN CON HAZ DE CONDUCTORES GEMELOS, ENTRE EL SOPORTE TERMINAL Y LOS PORTALES DE LA ESTACIÓN. EL PROYECTO CONTARÁ CON SOLUCIONES INNOVADORAS COMO DTR, ESTACIONES METEOROLÓGICAS, ESTACIONES DE MONITOREO DE DESLIZAMIENTOS DE TIERRA, INDICADOR DE IMPACTO DE AVES, CÁMARA DE AVES E INSERCIÓN DE FIBRA ÓPTICA. (Spanish)
24 January 2022
0 references
BENEVENTO
0 references
Identifiers
G83G17000900007
0 references